General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8786 - MacArthur Road, MacArthur Court, Larson Court, Sycamore Avenue Assessment District - 2026
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, sanitary laterals, water main, and storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, rain gardens, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking and signing.
03/19/2026 07:00 PM UTC
9745 - Madison Municipal Building Flagpole Replacement
This contract is for the removal of the existing flagpole in front of the Madison Municipal Building and the installation of two new flagpoles flanking the front entrance, located at 215 Martin Luther King Jr Blvd, Madison, WI.
02/26/2026 08:00 PM UTC
9737 - 2026 Semi-Permanent Epoxy Pavement Markings
This is an annual maintenance Epoxy Marking program to retrace/remark faded and worn out epoxy markings as needed for the entire City.
02/26/2026 08:00 PM UTC
9718 - Hoyt Park Lot Reconstruction
This project consists of the reconstruction of the asphalt parking lot at Hoyt Park. Work includes removing the existing curb and gutter and asphalt and rebuilding the lot per the contract's plans. Resurfacing and reconstruction of some of the asphalt park paths are included in the contract. This project also adds some concrete sidewalk and a bio retention basin to the site.
02/26/2026 08:00 PM UTC
8809 - South Charter Street Alley Assessment District - 2026
The work under this contract shall include, but not be limited to, installation of storm sewer main and structures, excavation, base preparation, curb and gutter, driveway aprons, spot replacement of sidewalk, and asphalt pavement.
02/12/2026 08:00 PM UTC
8733 - Hawthorne Court Reconstruction Assessment District - 2023, Lake Street Sanitary Sewer Replacement Assessment District - 2025, West Dayton Street Sanitary Replacement Assessment District - 2025
This contract will include reconstruction of Hawthorne Ct between University Ave and State St. This contract will also include replacement and upsizing of the sanitary sewer along W. Dayton St (between N. Lake St & N. Frances St) and N. Lake St (between a tie-in point 370’ north of University Ave & State St).
12/18/2025 08:00 PM UTC
9666 - Breese Stevens Field - Athletic Field Replacement
The Work includes the replacement of the synthetic turf and infill at Breese Stevens Field, 917 E. Mifflin Street, Madison, WI 53703.
11/20/2025 08:00 PM UTC
9691 - 2026 Playgrounds - Set 1
This project consists of installation of new playground equipment and/or nature play features, benches, playground safety surfacing, underdrain, asphalt paths and associated sitework at four (4) City of Madison park locations including Kennedy Park, Ontario Park, Sandburg Park, and Skyview Park.
11/20/2025 08:00 PM UTC
8841 - 114 E Wilson Site Restoration
This project includes site restoration of the City of Madison-owned gravel lot at 114 E. Wilson St. The site was formerly part of the Government East Parking Ramp, and since the ramp was demolished, the site has been used for construction staging by various local Contractors working in the area. The last Contractor to occupy the space is anticipated to be offsite in November 2025.
11/20/2025 08:00 PM UTC
9697 - Monona Terrace Tunnel Lighting
This work generally consists of the replacement and upgrades to the existing lighting and electrical systems under the Monona Terrace parking structure.
10/30/2025 07:00 PM UTC
11 - 20 of 1087 Solicitations
2 4 5 6 7 8 9 108 109