Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9813PlanHolders07102026.pdf (89.8 KB)
Contract 9813 - Overture Center Garage Electrical
2 Documents

Upcoming Solicitations

Number Deadline
9813 - Overture Center Garage Electrical Upgrade
Electrical system upgrades at the Overture Center Garage. Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components (new electrical rooms, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement.
07/30/2026 07:00 PM UTC
8708 - Hermina Street Pedestrian-Bike Bridge Over Starkweather Creek
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk & ramps, block retaining wall, lighting conduit and base/poles, concrete bridge abutments/wingwalls, concrete bridge approaches, pre-fabricated steel truss bike/pedestrian bridge installation, pipe railing installation, channel grading, rip rap installation, ground restoration, pavement markings, erosion control installations, and work zone traffic control signs and devices.
07/30/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
9335 - CIPP UV Lining Rehabilitation of Sanitary Sewers Phase 2 - 2023
Work shall include the trenchless rehabilitation of approximately 15,649 linear feet of sanitary sewer pipelines ranging in size from 8” to 12” and approximately 345 linear feet of 24”storm sewer pipelines diameter using an Ultraviolet light cure CIPP system.
08/10/2023 07:00 PM UTC
8587 - Tenney Park Beach Shelter
8587 - Tenney Park Beach Shelter
07/13/2023 07:00 PM UTC
8876 - Wexford Pond Dredging
This project is located on the parcel at 1005 N. High Point Rd., Madison, WI.
07/13/2023 07:00 PM UTC
8659 - Hudson Ave., Miller Ave., Willard Ave., Center Ave., and Sommers Ave. Assessment District - 2023
Work shall include, but is not limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, and replacement of storm sewer main and storm sewer structures, excavation, base preparation. curb and gutter, driveway aprons, sidewalk replacement, asphalt pavement, pavement marking and signing.
07/13/2023 07:00 PM UTC
9333 - Robin Greenway Storm and Grading
9333 - Robin Greenway Storm and Grading
07/13/2023 07:00 PM UTC
9297 - Goodman Library Lighting Upgrade
Complete installation of all building components; the accepted testing, and commissioning of all systems; and the completion, and turn-in of all deliverables as outlined in the plans and specifications.
07/06/2023 07:00 PM UTC
9326 - Door Creek Park Shelter
Door Creek Park Shelter
06/22/2023 07:00 PM UTC
8728 - IT Fiber Install 2023
8728 - IT Fiber Install 2023
06/22/2023 07:00 PM UTC
9327 - 2023 Penn Park Courts
2023 Penn Park Courts
06/08/2023 07:00 PM UTC
8732 - Repairing and Sealing Pavement Cracks - Major Streets 2023
Repairing and Sealing Pavement Cracks - Major Streets 2023
06/08/2023 07:00 PM UTC