City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 9726PlanHolders04032026.pdf (97.4 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9766PlanHolders04032026.pdf (88.9 KB) |
Contract 9766 - Metro Transit Kennedy Bus Charger
| |
| Number | Deadline |
|---|---|
|
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 04/23/2026 07:00 PM UTC |
|
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
| 04/23/2026 07:00 PM UTC |
|
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave.
The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
| 04/23/2026 07:00 PM UTC |
|
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
| 04/23/2026 07:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 05/21/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
9299 - 2023 Semi-Permanent Epoxy Pavement Marking
Furnishing and application or removal of epoxy pavement markings at location throughout the City of Madison.
| 03/09/2023 08:00 PM UTC |
|
8713 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 18) - 2023
Repair work primarily throughout the 18th Aldermanic District. Horizontally sawcut/grind sidewalk to eliminate trip hazards. Additional horizontal sawcutting/grinding may be required within the project limits of City of Madison Reconstruction Projects and may be city wide as part of the Sidewalk Request Program.
| 03/09/2023 08:00 PM UTC |
|
8727 - Bridge Repairs 2022/2023 - Painting Alicia Ashman Pedestrian Bridge
Repainting the Alicia Ashman pedestrian bridge over Campus Drive and Wisconsin and Southern Railroad. Preparation and repainting of all exposed surfaces of carbon steel items on the bridge and approach ramps. See Section 104 of the Contract for Scope of Work.
| 03/09/2023 08:00 PM UTC |
|
8705 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 12) by the Common Council
Repair work primarily throughout Aldermanic District 12. Replace defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by City of Madison) and associated work. Install new sidewalk and concrete bus pads at locations designated by the Common Council, as directed by the Engineer.
| 03/09/2023 08:00 PM UTC |
|
8701 - Chip Sealing 2023 - North
8701 - Chip Sealing 2023 - North
| 03/09/2023 08:00 PM UTC |
|
8698 - REPAIRING AND SEALING PAVEMENT CRACKS - LOCAL STREETS 2023
8698 - REPAIRING AND SEALING PAVEMENT CRACKS - LOCAL STREETS 2023
| 03/09/2023 08:00 PM UTC |
|
8700 - Chip Sealing 2023 - East
8700 - Chip Sealing 2023 - East
| 03/09/2023 08:00 PM UTC |
|
8699- Repairing and Sealing Pavement Crack - Major Streets 2023
8699- Repairing and Sealing Pavement Cracks - Major Streets 2023
| 03/09/2023 08:00 PM UTC |
|
9279 - 2023 Rennebohm Park Inclusive Playground
Installation of new playground equipment, benches, poured-in-place rubber playground surfacing, concrete curb edge restraint, asphalt paths and associated site and playground amenities at Rennebohm Park.
| 02/23/2023 08:00 PM UTC |
|
8703 - RESURFACING 2023 - ASPHALT PAVEMENT PULVERIZING, MILLING & PAVING
Pulverizing, milling, and paving various streets that are included with the resurfacing program. This contract also includes surface paving of several subdivisions that includes wedge cut grinding butt joints and around SASs, street sweeping, tack and adjusting valve boxes to grade. This contractor shall be required to coordinate with the other contractors performing work on the resurfacing program contracts.
| 02/23/2023 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.