General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9813PlanHolders07102026.pdf (89.8 KB)
Contract 9813 - Overture Center Garage Electrical
2 Documents

Upcoming Solicitations

Number Deadline
9813 - Overture Center Garage Electrical Upgrade
Electrical system upgrades at the Overture Center Garage. Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components (new electrical rooms, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement.
07/30/2026 07:00 PM UTC
8708 - Hermina Street Pedestrian-Bike Bridge Over Starkweather Creek
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk & ramps, block retaining wall, lighting conduit and base/poles, concrete bridge abutments/wingwalls, concrete bridge approaches, pre-fabricated steel truss bike/pedestrian bridge installation, pipe railing installation, channel grading, rip rap installation, ground restoration, pavement markings, erosion control installations, and work zone traffic control signs and devices.
07/30/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
9313 - Madison Senior Center Courtyard
Renovation of the Madison Senior Center Courtyard including demolition of existing features, protection of existing trees, full-depth pavement removals, light fixture removal, storm sewer demolition, excavation, base preparation, footings, concrete pavements, poured in place rubber surfacing, vertical curbing, specialty and pre-manufactured furnishings and features, and landscaping installation including plants, sod, mulches and miscellaneous landscape accessory materials. The project also includes lighting and storm sewer.
04/20/2023 07:00 PM UTC
9306 - 2023 Penn Park Courts
Installing asphalt pavement, including base course for path and courts, installing fencing, basketball hoops, mini-pitch system, and sport court finishing, striping and site restoration to construct two (2) basketball courts and a mini-pitch at Penn Park.
04/20/2023 07:00 PM UTC
8300 - W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
04/20/2023 07:00 PM UTC
9312 - Truax Lift Station Replacement
Truax Lift Station Replacement
04/20/2023 07:00 PM UTC
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
04/06/2023 07:00 PM UTC
9240 - Fire Station 4 Lighting Retrofit
Fire Station 4 Lighting Retrofit
04/06/2023 07:00 PM UTC
8642 - West Towne Path - Phase 3
Construction of the West Towne Path – Phase 3 from S Junction Road to Commerce Drive, City of Madison. State Project Number is 5992-00-62 (City Project Number is 13014). The project includes the construction of an off-street path on the north-side of Watts Road and Plaza Drive, including reconstruction of the north-side curb and sidewalk to fit the path. The project also includes curb ramps and median island improvements at intersections throughout the project limits.
04/06/2023 07:00 PM UTC
9249 - Madison Senior Center Courtyard
Renovation of the courtyard including demolition of existing features, protection of existing trees, full-depth pavement removals, light fixture removal, storm sewer demolition, excavation, base preparation, footings, concrete pavements, poured in place rubber surfacing, vertical curbing, specialty and pre-manufactured furnishings and features, and landscaping installation including plants, sod, mulches and miscellaneous landscape accessory materials; the project also includes lighting and storm sewer.
03/09/2023 08:00 PM UTC
9285 - CIPP UV Lining Rehabilitation of Sanitary Sewers West Phase 1 - 2023
Trenchless rehabilitation of approximately 12,653 linear feet of sanitary sewer piplelines ranging in size from 6" to 8" diameter using Ultraviolet light cure CIPP system. Prequalification in Category #399 UV Sewer Lining is required.
03/09/2023 08:00 PM UTC
9286 - CIPP UV Lining Rehabilitation of Sanitary Sewers East Phase 1 - 2023
Trenchless rehabilitation of approximately 8,406 linear feet of sanitary sewer pipelines ranging in size from 8" to 18" diameter using Ultraviolet light cure CIPP system. Contractor performing work is required to be prequalified under Category #399, UV Sewer Lining.
03/09/2023 08:00 PM UTC
211 - 220 of 1118 Solicitations
1 2 18 19 20 22 24 25 26 111 112