General Info

Business Logo

City of Madison

1600 Emil St, Madison, WI 53713-2362
(608) 267-1197


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9885PlanHolders11192026.pdf (405 KB)
Contract 9885 - Central Library Book Stack Lighting Retrofit
9801PlanHolders11202026.pdf (426 KB)
Contract 9801 - Madison LakeWay SkyLine Improvements
3 Documents

Upcoming Solicitations

Number Deadline
9801 - Madison LakeWay - SkyLine Improvements
The Madison LakeWay – SkyLine Improvements are the culmination of a multi-year collaboration among public and private partners to create a more welcoming, accessible, and vibrant public shoreline along Lake Monona. The project will provide a green, inviting linear parkway along one-half mile of shoreline adjacent to John Nolen Drive. The project scope builds upon work completed under the John Nolen Drive Reconstruction project (WisDOT Project# 5992-11). The new SkyLine shoreline amenities include two boardwalks, a pier, pedestrian-scale site lighting, enhanced paths, seating and bicycle amenities, wayfinding signage, and extensive site landscaping. This single contract is for the construction of the Madison LakeWay – SkyLine Improvements for the Madison Parks Division.
12/17/2026 08:00 PM UTC
9885 - Central Library Book Stack Lighting Retrofit
Replacement of Lighting systems and control in the book stack areas. This will enhance lighting and save energy and maintenance cost.
12/17/2026 08:00 PM UTC
8640 - Old Middleton Road Underpass of WSOR
The work under this contract shall include, but is not limited to Rail and ballast removal and replacement, Precast culvert/underpass installation, excavation, storm structure adjustment, gravel base course, asphalt pavement, concrete curb & gutter, concrete work, block retaining wall, lighting conduit, and base/poles, pavement markings, ground restoration, erosion control installation, maintenance, and removal, work zone traffic control signs and devices, and railing installation.
12/17/2026 08:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
9306 - 2023 Penn Park Courts
Installing asphalt pavement, including base course for path and courts, installing fencing, basketball hoops, mini-pitch system, and sport court finishing, striping and site restoration to construct two (2) basketball courts and a mini-pitch at Penn Park.
04/20/2023 07:00 PM UTC
8300 - W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
04/20/2023 07:00 PM UTC
9312 - Truax Lift Station Replacement
Truax Lift Station Replacement
04/20/2023 07:00 PM UTC
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
04/06/2023 07:00 PM UTC
9240 - Fire Station 4 Lighting Retrofit
Fire Station 4 Lighting Retrofit
04/06/2023 07:00 PM UTC
8642 - West Towne Path - Phase 3
Construction of the West Towne Path – Phase 3 from S Junction Road to Commerce Drive, City of Madison. State Project Number is 5992-00-62 (City Project Number is 13014). The project includes the construction of an off-street path on the north-side of Watts Road and Plaza Drive, including reconstruction of the north-side curb and sidewalk to fit the path. The project also includes curb ramps and median island improvements at intersections throughout the project limits.
04/06/2023 07:00 PM UTC
9249 - Madison Senior Center Courtyard
Renovation of the courtyard including demolition of existing features, protection of existing trees, full-depth pavement removals, light fixture removal, storm sewer demolition, excavation, base preparation, footings, concrete pavements, poured in place rubber surfacing, vertical curbing, specialty and pre-manufactured furnishings and features, and landscaping installation including plants, sod, mulches and miscellaneous landscape accessory materials; the project also includes lighting and storm sewer.
03/09/2023 08:00 PM UTC
9285 - CIPP UV Lining Rehabilitation of Sanitary Sewers West Phase 1 - 2023
Trenchless rehabilitation of approximately 12,653 linear feet of sanitary sewer piplelines ranging in size from 6" to 8" diameter using Ultraviolet light cure CIPP system. Prequalification in Category #399 UV Sewer Lining is required.
03/09/2023 08:00 PM UTC
9286 - CIPP UV Lining Rehabilitation of Sanitary Sewers East Phase 1 - 2023
Trenchless rehabilitation of approximately 8,406 linear feet of sanitary sewer pipelines ranging in size from 8" to 18" diameter using Ultraviolet light cure CIPP system. Contractor performing work is required to be prequalified under Category #399, UV Sewer Lining.
03/09/2023 08:00 PM UTC
8875 - Lower Badger Mill Creek Flood Mitigation
Work includes, but is not limited to: Clearing & grubbing, channel excavation, pond excavation and dredging, maintenance path base course, installation of storm pipe and structures, installation of box culvert wingwalls and apron, bridge construction, and restoration.
03/09/2023 08:00 PM UTC
221 - 230 of 1127 Solicitations
1 2 … 19 20 21 23 25 26 27 … 112 113