General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9801PlanHolders10082026.pdf (69.8 KB)
Contract 9801 - Madison LakeWay SkyLine Improvements
2 Documents

Upcoming Solicitations

Number Deadline
9801 - Madison LakeWay - SkyLine Improvements
The Madison LakeWay – SkyLine Improvements are the culmination of a multi-year collaboration among public and private partners to create a more welcoming, accessible, and vibrant public shoreline along Lake Monona. The project will provide a green, inviting linear parkway along one-half mile of shoreline adjacent to John Nolen Drive. The project scope builds upon work completed under the John Nolen Drive Reconstruction project (WisDOT Project# 5992-11). The new SkyLine shoreline amenities include two boardwalks, a pier, pedestrian-scale site lighting, enhanced paths, seating and bicycle amenities, wayfinding signage, and extensive site landscaping. This single contract is for the construction of the Madison LakeWay – SkyLine Improvements for the Madison Parks Division.
12/17/2026 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
8713 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 18) - 2023
Repair work primarily throughout the 18th Aldermanic District. Horizontally sawcut/grind sidewalk to eliminate trip hazards. Additional horizontal sawcutting/grinding may be required within the project limits of City of Madison Reconstruction Projects and may be city wide as part of the Sidewalk Request Program.
03/09/2023 08:00 PM UTC
8727 - Bridge Repairs 2022/2023 - Painting Alicia Ashman Pedestrian Bridge
Repainting the Alicia Ashman pedestrian bridge over Campus Drive and Wisconsin and Southern Railroad. Preparation and repainting of all exposed surfaces of carbon steel items on the bridge and approach ramps. See Section 104 of the Contract for Scope of Work.
03/09/2023 08:00 PM UTC
8705 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 12) by the Common Council
Repair work primarily throughout Aldermanic District 12. Replace defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by City of Madison) and associated work. Install new sidewalk and concrete bus pads at locations designated by the Common Council, as directed by the Engineer.
03/09/2023 08:00 PM UTC
8701 - Chip Sealing 2023 - North
8701 - Chip Sealing 2023 - North
03/09/2023 08:00 PM UTC
8698 - REPAIRING AND SEALING PAVEMENT CRACKS - LOCAL STREETS 2023
8698 - REPAIRING AND SEALING PAVEMENT CRACKS - LOCAL STREETS 2023
03/09/2023 08:00 PM UTC
8700 - Chip Sealing 2023 - East
8700 - Chip Sealing 2023 - East
03/09/2023 08:00 PM UTC
8699- Repairing and Sealing Pavement Crack - Major Streets 2023
8699- Repairing and Sealing Pavement Cracks - Major Streets 2023
03/09/2023 08:00 PM UTC
9279 - 2023 Rennebohm Park Inclusive Playground
Installation of new playground equipment, benches, poured-in-place rubber playground surfacing, concrete curb edge restraint, asphalt paths and associated site and playground amenities at Rennebohm Park.
02/23/2023 08:00 PM UTC
8703 - RESURFACING 2023 - ASPHALT PAVEMENT PULVERIZING, MILLING & PAVING
Pulverizing, milling, and paving various streets that are included with the resurfacing program. This contract also includes surface paving of several subdivisions that includes wedge cut grinding butt joints and around SASs, street sweeping, tack and adjusting valve boxes to grade. This contractor shall be required to coordinate with the other contractors performing work on the resurfacing program contracts.
02/23/2023 08:00 PM UTC
8702 - Resurfacing 2023 - Curb & Gutter and Castings
Replacement of curb and gutter, drive aprons, sidewalk ramps included truncated domes (supplied by City of Madison) and adjusting inlets and castings (supplied by City of Madison) in advance of pavement pulverizing/milling and paving. This contractor shall be required to coordinate with the other contractors performing work on the resurfacing program contracts.
02/23/2023 08:00 PM UTC
231 - 240 of 1126 Solicitations
1 2 … 20 21 22 24 26 27 28 … 112 113