City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 9801PlanHolders10082026.pdf (69.8 KB) |
Contract 9801 - Madison LakeWay SkyLine Improvements
| |
| Number | Deadline |
|---|---|
|
9801 - Madison LakeWay - SkyLine Improvements
The Madison LakeWay – SkyLine Improvements are the culmination of a multi-year collaboration among public and private partners to create a more welcoming, accessible, and vibrant public shoreline along Lake Monona. The project will provide a green, inviting linear parkway along one-half mile of shoreline adjacent to John Nolen Drive. The project scope builds upon work completed under the John Nolen Drive Reconstruction project (WisDOT Project# 5992-11). The new SkyLine shoreline amenities include two boardwalks, a pier, pedestrian-scale site lighting, enhanced paths, seating and bicycle amenities, wayfinding signage, and extensive site landscaping. This single contract is for the construction of the Madison LakeWay – SkyLine Improvements for the Madison Parks Division.
| 12/17/2026 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
8704 - RESURFACING 2023 - ASPHALT BASE PATCHING AND BASE PATCH GRINDING
Work included in this contract is asphalt base patching, patch by grind (mill/overlay), citywide, and infrared patching. Contractor may be required to replace temporary patches with permanent HMA patches. On streets that have a pavement rating greater than 6 and on collector and arterial streets patches shall then have the limit extended by mill and overlay per the established patching criteria.
| 02/23/2023 08:00 PM UTC |
|
9270 - 2023 Penn Park Courts
Construction of new basketball courts and mini-pitch at Penn Park.
| 02/23/2023 08:00 PM UTC |
|
8697 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 12) - 2023
Perform repair work primarily throughout the 12th Aldermanic District. Additional horizontal sawcutting/grinding may be required within the project limits of City of Madison Reconstruction Projects and may be city wide, primarily west of Park St, as part of the Sidewalk Request Program.
| 02/23/2023 08:00 PM UTC |
|
8715 - Lake Mendota Drive Assessment District - 2023
Replacement and installation of new storm sewer pipes and structures, installation of concrete sidewalk and curb and gutter, replacement of asphalt pavement, and replacement of driveway aprons.
| 02/23/2023 08:00 PM UTC |
|
8706 - Annual Construction & Reconstruction of Concrete Sidewalk & Incidental Concrete Curb & Gutter Work Ordered (District 18) By the Common Council
Perform repair work primarily throughout Aldermanic District 18. This work includes replacing defective sidewalk, curb and gutter, and sidewalk ramps, including truncated domes (supplied by the City of Madison), and associated work.
| 02/23/2023 08:00 PM UTC |
|
9280 - Fire Station 10 Lighting Retrofit
Fire Station 10 is located at 1517 Troy Drive in Madison, WI. This bid shall include the complete installation of all building components; the accepted testing, and commissioning of all systems; and the completion, and turn-in of all deliverables as outlined in the plans and specifications.
| 02/09/2023 08:00 PM UTC |
|
9269 - 2023 Sport Court Resurfacings
2023 Sport Court Resurfacings
| 02/09/2023 08:00 PM UTC |
|
8583 - Halo Lane and Twilight Trail Resurfacing Assessment District - 2023
The work shall include, but is not limited to, replacing sanitary sewer, replacing and/or improving storm sewer, removing and replacing concrete curb and gutter, sidewalk and drive aprons, excavation cut, crushed aggregate base course, and asphalt pavement as noted in specifications and plans.
| 02/09/2023 08:00 PM UTC |
|
8641 - Braxton Place and La Mariposa Lane Assessment District - 2022
The new street construction project limits on La Mariposa Lane are between West Washington Avenue and Braxton Place. The project is approximately 450 ft. in length. The new shared-use path construction project limits are between Braxton Place and Regent Street. The project is approximately 360 ft. in length.
| 01/26/2023 08:00 PM UTC |
|
9243 - 2023 Semi-Permanent Epoxy Pavement Marking
2023 Semi-Permanent Epoxy Pavement Marking
| 01/26/2023 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.