City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
Name * | Description | |
---|---|---|
How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
8739PlanHolders07162025.pdf (91 KB) |
Contract 8739 - Tancho Bike & Northeast Pond
| |
9638PlanHolders07162025.pdf (90.1 KB) |
Contract 9638 - Country Grove Singletrack
| |
Number | Deadline |
---|---|
9638 - Country Grove Singletrack Trail Improvements 2025
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 07/24/2025 07:00 PM UTC |
8739 - Tancho Dr Bike Path & Northeast Regional Pond Repair
The work under this contract shall include, but is not limited to, tree removal, storm sewer pipes and structures, base preparation, curb and gutter, sidewalk spot replacement, asphalt pavement, shared-use path, improvement on pedestrian crossings, pavement marking, signing, and path lighting.
| 07/24/2025 07:00 PM UTC |
9670 - MADISON MUNICIPAL BUILDING FLAGPOLE REPLACEMENT
This contract is for the removal of the existing flagpole and the replacement/installation of two new flagpoles at the entrance of the Madison Municipal Building located at 215 Martin Luther King Jr Blvd. This work includes, but is not limited to, general site and earthwork, general building construction, electrical, and concrete work.
| 08/21/2025 07:00 PM UTC |
Number | Deadline |
---|---|
8757 - Bartillon Sidewalk
The work under this contract shall include, but is not limited to, clearing, grubbing, concrete sidewalk, and terrace restoration with topsoil, seed, and matting.
| 03/27/2025 07:00 PM UTC |
8794 - Chip Sealing 2025 - West
The work under this contract consists of street sweeping and cleaning of all loose material, vegetation and other objectionable material, the protection of inlets and castings and chip sealing.
| 03/27/2025 07:00 PM UTC |
8795 - Chip Sealing 2025 - South
The work under this contract consists of street sweeping and cleaning of all loose material, vegetation and other objectionable material, the protection of inlets and castings and chip sealing.
| 03/27/2025 07:00 PM UTC |
8781 - Evergreen Avenue, Ohio Avenue, Sommers Avenue Assessment District - 2025
The work under this contract shall include, but not be limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, reconnection of water services, and replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking, signing, replacement of a traffic signals, and replacement of street lighting.
| 03/27/2025 07:00 PM UTC |
8800 - 2025 Safe Streets
The work under this contract shall include, but is not limited to, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk, asphalt pavement, and replacement of storm sewer main and storm sewer structures.
| 03/20/2025 07:00 PM UTC |
8796 - Repairing and Sealing Pavement Cracks - Major Streets 2025
The work under this contract consists of routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
| 03/20/2025 07:00 PM UTC |
8797 - Repairing and Sealing Pavement Cracks - Local Streets 2025
The work under this contract consists of routing, street sweeping, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material and spray patching any cracks or potholes that are beyond the scope of crack sealing.
| 03/20/2025 07:00 PM UTC |
9318 - Olin Waste Transfer Drop-Off
This project is to provide a dedicated Public Waste and Recycling Drop-off site at the existing Olin Waste Transfer site. Currently the temporary site is co-mingled with large city vehicles and the drop-off site runs limited hours for safety reasons. This project will install a separate public access road off of Quann-Olin Pkwy. The internal circulation of the drop-off area will keep public and city vehicle traffic separated.
| 03/13/2025 07:00 PM UTC |
8811 - Bridge Repairs - 2025
This project consists of bridge repairs for the Park Street pedestrian bridge (P-13-760), Commercial Avenue bridge, USH-51 pedestrian bridge (B-13-341), and the Campus Drive Bridge (B-13-266) over Highland Avenue.
| 03/13/2025 07:00 PM UTC |
8791 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 20) - 2025
The work includes horizontally sawcutting/grinding sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.
| 02/27/2025 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.