General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9801PlanHolders10082026.pdf (69.8 KB)
Contract 9801 - Madison LakeWay SkyLine Improvements
2 Documents

Upcoming Solicitations

Number Deadline
9801 - Madison LakeWay - SkyLine Improvements
The Madison LakeWay – SkyLine Improvements are the culmination of a multi-year collaboration among public and private partners to create a more welcoming, accessible, and vibrant public shoreline along Lake Monona. The project will provide a green, inviting linear parkway along one-half mile of shoreline adjacent to John Nolen Drive. The project scope builds upon work completed under the John Nolen Drive Reconstruction project (WisDOT Project# 5992-11). The new SkyLine shoreline amenities include two boardwalks, a pier, pedestrian-scale site lighting, enhanced paths, seating and bicycle amenities, wayfinding signage, and extensive site landscaping. This single contract is for the construction of the Madison LakeWay – SkyLine Improvements for the Madison Parks Division.
12/17/2026 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
9776 - Overture Center Garage Electrical Upgrade
Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components, installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation.
05/21/2026 07:00 PM UTC
9709 - Yahara Hills Golf Course Paved Paths
This project constructs up to 5600 linear feet of asphalt multiuse paths for Yahara Hills Golf Course. The new multiuse paths consist of excavation of existing grade to depth for base course and grading to maintain a 2% max cross slope on all paths. Base course consists of clear stone and crushed aggregate base course. The paths will then be paved with asphalt per specifications.
05/21/2026 07:00 PM UTC
8747 - Pflaum Road Resurfacing Assessments District - 2025
This project will take place at Pflaum Road between Monona Drive and S Stoughton Road shall include, but is not limited to replacement of sanitary sewer main and laterals, replacement of water main and reconnection of water services, and storm sewer main, structures and laterals, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, installation of a new bicycle path, underground terrace and sidewalk support systems, asphalt pavement, and pavement marking.
05/21/2026 07:00 PM UTC
9490 - Fordem Avenue - First Street Relief Sanitary Sewer
The work under this contract shall include, but is not limited to, replacement of sanitary sewer main, excavation, base preparation, curb and gutter, driveway aprons, sidewalk replacement, base course, asphalt pavement, and pavement marking.
05/21/2026 07:00 PM UTC
9788 - CIPP 2026 Woodvale Drive Water Main Rehabilitation
The rehabilitation of these water mains is to be completed by lining the existing water mains with a Class IV structural cured-in-place pipe (CIPP), certified for the conveyance of drinking water. Temporary water service is to be provided to all affected properties during the rehabilitation of these water mains.
05/14/2026 07:00 PM UTC
8832 - Resurfacing 2026 - Assessment District
The work in this contract includes replacement of curb and gutter, drive aprons, sidewalk ramps including truncated domes, adjusting inlets and castings, and pulverizing/milling, and paving various streets that are included with the resurfacing program.
05/14/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
05/07/2026 07:00 PM UTC
8837 - Repairing and Sealing Pavement Cracks - Major Streets 2026
Work includes crack routing, street sweeping, crack heating, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material; spray patching any cracks or potholes that are beyond the scope of crack sealing, sealant finishing, and traffic control.
05/07/2026 07:00 PM UTC
8838 - Repairing and Sealing Pavement Cracks - Local Streets 2026
Work includes crack routing, street sweeping, crack heating, cleaning and sealing existing longitudinal and transverse pavement cracks with sealant material, spray patching any cracks or potholes that are beyond the scope of crack sealing, sealant finishing and traffic control.
05/07/2026 07:00 PM UTC
8835 - Chip Sealing 2026 - West
The work consists of street sweeping and cleaning of all loose material, vegetation and other objectionable material, the protection of inlets and castings and chip sealing.
05/07/2026 07:00 PM UTC
21 - 30 of 1126 Solicitations
1 3 5 6 7 8 9 … 112 113