General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8418 - Summit West Maintenance Facility Improvements 2019
Summit West Maintenance Facility Improvements 2019
06/20/2019 07:00 PM UTC
8359 - Burr Jones Park - Site Improvements
Burr Jones Park - Site Improvements
06/20/2019 07:00 PM UTC
9415 - 2019 Glacier Hill Park Sun Shelter Installation
2019 Glacier Hill Park Sun Shelter Installation
06/20/2019 07:00 PM UTC
8299 - N. Bassett Street Assessment District - 2019
N. Bassett Street Assessment District - 2019
06/20/2019 07:00 PM UTC
8315 - Local Road Traffic Calming & Arterial Pedestrian Enhancements 2019
Local Road Traffic Calming & Arterial Pedestrian Enhancements 2019
06/20/2019 07:00 PM UTC
8293 - New Sidewalk Installation - 2019
New Sidewalk Installation - 2019
06/20/2019 07:00 PM UTC
8421 - Hawks Landing Flood Mitigation South - 2019
Hawks Landing Flood Mitigation South - 2019
06/20/2019 07:00 PM UTC
9411 - McKenna Boulevard Flood Mitigation
9411 - McKenna Boulevard Flood Mitigation
06/13/2019 07:00 PM UTC
8328 - 2019 Olbrich Park (At Walter Street) Site Improvements
2019 Olbrich Park (At Walter Street) Site Improvements
06/06/2019 07:00 PM UTC
8425 - Park Paving 2019
Park Paving 2019
06/06/2019 07:00 PM UTC
451 - 460 of 1087 Solicitations
1 2 42 43 44 46 48 49 50 108 109