City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 9726PlanHolders04032026.pdf (97.4 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9766PlanHolders04032026.pdf (88.9 KB) |
Contract 9766 - Metro Transit Kennedy Bus Charger
| |
| Number | Deadline |
|---|---|
|
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 04/23/2026 07:00 PM UTC |
|
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
| 04/23/2026 07:00 PM UTC |
|
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave.
The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
| 04/23/2026 07:00 PM UTC |
|
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
| 04/23/2026 07:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 05/21/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
9655 - Fire Station 8 Lighting Retrofit
This project includes replacement of lighting and lighting controls. This will reduce energy consumption and maintenance cost.
| 06/05/2025 07:00 PM UTC |
|
9651 - Madison Public Market - Exterior Signage
This contract is for the fabrication, delivery, and installation of exterior signage for the future Madison Public Market located at 202 N First St., Madison, WI 53704. The work includes, but is not limited to, electrical hookup and testing of signage elements, with electrical rough-in already provided near each sign location. This contract includes a potential for (1) Additive Alternate labeled as ITEM 90001.
| 05/22/2025 07:00 PM UTC |
|
9591 - Capital City Trail Box Culvert Replacement
The work under this contract shall include, but is not limited to, excavation, replacement of storm sewer main, culvert, and storm structures, base preparation, curb and gutter, path aprons, sidewalk, asphalt pavement.
| 05/22/2025 07:00 PM UTC |
|
8792 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2025
This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work.
| 05/08/2025 07:00 PM UTC |
|
8807 - Resurfacing 2025 - Asphalt Base Patching and Base Patch Grinding
Included with this contract is asphalt base patching, patch by grind (mill/overlay) citywide, and infrared patching.
| 05/08/2025 07:00 PM UTC |
|
8798 - Resurfacing 2025 - Assessment District
The work in this contract includes replacement of curb and gutter, drive aprons, sidewalk ramps including truncated domes, adjusting inlets and castings, installation of new storm sewer, and pulverizing/milling, and paving various streets that are included with the resurfacing program.
| 05/08/2025 07:00 PM UTC |
|
9642 - Rennebohm Park East Tennis Courts 2025
This project consists of reconstructing the east tennis court complex at Rennebohm Park. Work includes asphalt pavement, grading, base course, electrical and lighting, fencing, gates, net posts, net tie downs, and sport court finishing and striping.
| 04/17/2025 07:00 PM UTC |
|
9648 - 2025 Parking Garage Maintenance
Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
| 04/17/2025 07:00 PM UTC |
|
9646 - 2025 Sport Court Resurfacings
This project consists of resurfacing existing basketball, tennis and pickleball courts including crack sealing, seal coating, and court line painting at three (3) City of Madison project sites including Goodman, Huegel and Quann Parks.
| 04/17/2025 07:00 PM UTC |
|
8783 - Shawnee Pass Assessment District 2025, Nakoma Sidewalk, and Nakoma Culvert
The work under this contract shall include, but is not limited to, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, sanitary sewer replacement, and replacement of storm sewer main, culvert, and storm sewer structures.
| 04/17/2025 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.