General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8298 - Groveland Terrace Assessment District- 2019
8298 - Groveland Terrace Assessment District- 2019
03/07/2019 08:00 PM UTC
8238 - Metro Transit - Service Lane Addition - Phase 1
8238 - Metro Transit - Service Lane Addition - Phase 1
02/28/2019 08:00 PM UTC
8119 - S. Bryan Street, Daley Drive, James Street and Thorp Street Reconstruction District 2018
8119 - S. Bryan Street, Daley Drive, James Street and Thorp Street Reconstruction District 2018
02/28/2019 08:00 PM UTC
8320 - Resurfacing 2019 - Asphalt Base Patching and Base Patch Grinding
8320 - Resurfacing 2019 - Asphalt Base Patching and Base Patch Grinding
02/28/2019 08:00 PM UTC
8301 - Reetz Road and Altem Circle Resurfacing Assessment District - 2019
8301 - Reetz Road and Altem Circle Resurfacing Assessment District - 2019
02/28/2019 08:00 PM UTC
8319 - Resurfacing 2019 - Asphalt Pavement Pulverizing, Milling & Paving
8319 - Resurfacing 2019 - Asphalt Pavement Pulverizing, Milling & Paving
02/28/2019 08:00 PM UTC
8390 - CIPP WET LINING REHAB OF SANITARY SEWERS - 2019
8390 - CIPP WET LINING REHAB OF SANITARY SEWERS - 2019
02/28/2019 08:00 PM UTC
8318 - RESURFACING 2019 - CURB & GUTTER AND CASTINGS
8318 - RESURFACING 2019 - CURB & GUTTER AND CASTINGS
02/28/2019 08:00 PM UTC
7613 - Portage Road Assessment District - 2016 And Eastpark Multi-Use Path & Bridge and Eastlawn Multi-Use Bridge
7613 - Portage Road Assessment District - 2016 And Eastpark Multi-Use Path & Bridge and Eastlawn Multi-Use Bridge
02/21/2019 08:00 PM UTC
8367 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 9) by the Common Council
Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 9) by the Common Council
02/21/2019 08:00 PM UTC
491 - 500 of 1087 Solicitations
1 2 46 47 48 50 52 53 54 108 109