General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8092 - Chip Sealing 2018 - West
Chip Sealing 2018 - West
04/12/2018 07:00 PM UTC
8093 - Chip Sealing 2018 - East
Chip Sealing 2018 - East
04/12/2018 07:00 PM UTC
8103 - South Livingston Street Reconstruction Assessment District - 2018
South Livingston Street Reconstruction Assessment District - 2018
04/05/2018 07:00 PM UTC
8153 - 2018 Parking Garage Maintenance
2018 Parking Garage Maintenance
04/05/2018 07:00 PM UTC
8156 - 2018 State Street Campus - Frances Parking Garage Electrical Modifications and Upgrades
2018 State Street Campus - Frances Parking Garage Electrical Modifications and Upgrades
04/05/2018 07:00 PM UTC
8073 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 3) By the Common Council
Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 3) By the Common Council
04/05/2018 07:00 PM UTC
8076 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 3) - 2018
Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 3) - 2018
04/05/2018 07:00 PM UTC
8111 - Calypso Road, Fremont Avenue and Hillcrest Drive Resurfacing with Utilities Assessment District - 2018
Calypso Road, Fremont Avenue and Hillcrest Drive Resurfacing with Utilities Assessment District - 2018
04/05/2018 07:00 PM UTC
8105 - N. Blackhawk Avenue, Bruce Court, and Heather Crest Resurfacing with Utilities Assessment District - 2018
8105 - N. Blackhawk Avenue, Bruce Court, and Heather Crest Resurfacing with Utilities Assessment District - 2018
04/05/2018 07:00 PM UTC
8108 - Schenk Street and Richard Street Resurfacing with Utilities Assessment District - 2018
Schenk Street and Richard Street Resurfacing with Utilities Assessment District - 2018
03/22/2018 07:00 PM UTC
571 - 580 of 1087 Solicitations
1 2 54 55 56 58 60 61 62 108 109