City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
Name * | Description | |
---|---|---|
How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
8739PlanHolders07162025.pdf (91 KB) |
Contract 8739 - Tancho Bike & Northeast Pond
| |
9638PlanHolders07162025.pdf (90.1 KB) |
Contract 9638 - Country Grove Singletrack
| |
Number | Deadline |
---|---|
9638 - Country Grove Singletrack Trail Improvements 2025
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 07/24/2025 07:00 PM UTC |
8739 - Tancho Dr Bike Path & Northeast Regional Pond Repair
The work under this contract shall include, but is not limited to, tree removal, storm sewer pipes and structures, base preparation, curb and gutter, sidewalk spot replacement, asphalt pavement, shared-use path, improvement on pedestrian crossings, pavement marking, signing, and path lighting.
| 07/24/2025 07:00 PM UTC |
9670 - MADISON MUNICIPAL BUILDING FLAGPOLE REPLACEMENT
This contract is for the removal of the existing flagpole and the replacement/installation of two new flagpoles at the entrance of the Madison Municipal Building located at 215 Martin Luther King Jr Blvd. This work includes, but is not limited to, general site and earthwork, general building construction, electrical, and concrete work.
| 08/21/2025 07:00 PM UTC |
Number | Deadline |
---|---|
8767 - Door Creek Park Connection
The work under this contract shall include, but is not limited to, installing new conduit and fiber optic between an existing splice point at the intersection of Milwaukee Street and Sprecher Road and a new shelter being built at Door Creek Park.
| 08/29/2024 07:00 PM UTC |
9561 - S. Paterson Street Sanitary Sewer Replacement Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of sanitary sewer main, lateral reconnection, bore and jacking of casing pipe, and asphalt pavement patching.
| 08/29/2024 07:00 PM UTC |
9238 - Burr Jones Shoreline Repair
The work includes removing two existing metal seawalls, placing riprap protection along the bank, asphalt path construction, incorporating a stone step area to the water from the edge of path, grading, erosion control, soil matting, and restoration.
| 08/15/2024 07:00 PM UTC |
9174 - McPike Park - Building Demolition and Site Restoration
The work includes the demolition and removal of structures, site features and asphalt paving located at 202-212 S. Baldwin Street, Madison, WI.
| 08/15/2024 07:00 PM UTC |
9489 - 3400 Block E Washington Ave Sanitary Sewer Replacement
This project generally consists of replacement and installation of sanitary sewer pipes and structures, abandoning existing sanitary sewer, and replacement of concrete pavement.
| 07/18/2024 07:00 PM UTC |
8742 Rutledge Street Assessment District - 2024
The work under this contract shall include, but is not limited to, tree removal, replacement of sanitary sewer main, sanitary laterals, water main, and storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, rain gardens, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking and signing.
| 07/18/2024 07:00 PM UTC |
9546 - Madison Water Utility Olin Ave. Administrative Building Roof Replacement
The work for this project includes replacing the existing 17,000 sq ft. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system.
| 07/11/2024 07:00 PM UTC |
8626 - Olin-Turville Court and E. Lakeside Street Assessment District - 2024
The work under this contract shall include, but is not limited to, installation of sanitary sewer main, culverts, earthwork, base preparation, curb and gutter, asphalt pavement, sidewalk, shared-use path, curb ramps, pavement marking, and restoration.
| 07/11/2024 07:00 PM UTC |
9502 - Warner Park Community Recreation Center Expansion
The work includes removal of some existing exterior walls, excavation for new footings and foundations, construction of a building addition, which includes a gymnasium, with new exterior walls, roofs and interior slabs. Installation of new mechanical, electrical, and plumbing systems, and interior renovations to create new restrooms and a comfort room. Site work including geothermal, landscaping, and parking lot modifications.
| 06/27/2024 07:00 PM UTC |
9372 - Prairie Hills Detention Basin Improvements
The work includes but is not limited to removing 100 cu. yards of existing sediment buildup from the bottom of the Prairie Hills Detention Basin West Cell under an existing maintenance permit, constructing a maintenance access drive off Dorchester Way, constructing three 6’x6’ Storm Access Structures with 6’ sumps connected to existing stormsewer, removal of two inlets, clearing and grubbing, grading and street and site restoration.
| 06/27/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.