General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8064 - Madison Metro Bus Garage - Roof Replacement
Madison Metro Bus Garage - Roof Replacement
12/15/2017 07:00 PM UTC
8085 - Olin Turville Park Boat Launch Improvements
Olin Turville Park Boat Launch Improvements
12/15/2017 07:00 PM UTC
8061 - Fire Station 10 Storefront Replacement
Fire Station 10 Storefront Replacement
11/03/2017 06:00 PM UTC
8063 - Garver Feed Mill Material Hauling
Garver Feed Mill Material Hauling
11/03/2017 06:00 PM UTC
8065 - Madison Municipal Building - Exterior Asbestos Caulk Removal
Madison Municipal Building - Exterior Asbestos Caulk Removal
10/20/2017 06:00 PM UTC
7976 - North Blair Street Reconstruction Assessment District - 2017
North Blair Street Reconstruction Assessment District - 2017
10/20/2017 06:00 PM UTC
8053 - Park Edge/Park Ridge Employment Center
Park Edge/Park Ridge Employment Center
10/06/2017 06:00 PM UTC
7999 - N. Hancock Street Reconstruction Assessment District-2018
7999 - N. Hancock Street Reconstruction Assessment District-2018
10/06/2017 06:00 PM UTC
8041 - CIPP Rehab of Large Diameter Storm Sewer
8041 - CIPP Rehab of Large Diameter Storm Sewer
09/22/2017 06:00 PM UTC
8047 - Madison Municipal Building - Exterior Asbestos Caulk Removal
8047 - Madison Municipal Building - Exterior Asbestos Caulk Removal
09/22/2017 06:00 PM UTC
601 - 610 of 1087 Solicitations
1 2 57 58 59 61 63 64 65 108 109