General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8562PlanHolders04062026.pdf (89 KB)
Contract 8562 - Pontiac Boston Nokomis Rosewood
9726PlanHolders04062026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9756PlanHolders04062026.pdf (87.5 KB)
Contract 9756 - Sherman/Shabazz Improvements
9766PlanHolders04062026.pdf (89 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
9780PlanHolders04062026.pdf (87.1 KB)
Contract 9780 - CIPP UV Lining Ph 1 2026
6 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
8000 - E. Gilman Street, N. Pinckney Street, and N. Butler Street Resurfacing with Utilities Assessment District - 2017
8000 - E. Gilman Street, N. Pinckney Street, and N. Butler Street Resurfacing with Utilities Assessment District - 2017
09/22/2017 06:00 PM UTC
7950 - Summit Maintenance Facility - Building Improvements
Summit Maintenance Facility - Building Improvements
09/08/2017 06:00 PM UTC
8024 - Park Edge/Park Ridge Employment Center
Park Edge/Park Ridge Employment Center
09/08/2017 06:00 PM UTC
8030 - Monona Terrace Exhibition Hall Flooring Resurfacing
Monona Terrace Exhibition Hall Flooring Resurfacing
08/25/2017 06:00 PM UTC
8033 - Fire Station 10 Storefront Replacement
8033 - Fire Station 10 Storefront Replacement
08/25/2017 06:00 PM UTC
8035 - Park Edge Drive Flood Mitigation
8035 - Park Edge Drive Flood Mitigation
08/18/2017 06:00 PM UTC
8032 - Olin Transfer Station Stormwater Improvement
8032 - Olin Transfer Station Stormwater Improvement
08/18/2017 06:00 PM UTC
7951 - Capitol East District Parking Structure
7951 - Capitol East District Parking Structure
08/11/2017 06:00 PM UTC
7979 - Monona Bay Shoreline Repairs
Monona Bay Shoreline Repairs
08/11/2017 06:00 PM UTC
7896 - Chippewa Drive Sidewalk Assessment District - 2017
Chippewa Drive Sidewalk Assessment District - 2017
08/11/2017 06:00 PM UTC
611 - 620 of 1087 Solicitations
1 2 58 59 60 62 64 65 66 108 109