City of Madison
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620
| Name * | Description | |
|---|---|---|
| How to find bid results.pdf (78.7 KB) |
How To Find Bid Results
| |
| 9726PlanHolders04032026.pdf (97.4 KB) |
Contract 9726 - Country Grove Singletrack Trail
| |
| 9766PlanHolders04032026.pdf (88.9 KB) |
Contract 9766 - Metro Transit Kennedy Bus Charger
| |
| Number | Deadline |
|---|---|
|
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 04/23/2026 07:00 PM UTC |
|
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
| 04/23/2026 07:00 PM UTC |
|
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave.
The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
| 04/23/2026 07:00 PM UTC |
|
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
| 04/23/2026 07:00 PM UTC |
|
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
| 05/21/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
7904 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 15) by the Common Council
Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 15) by the Common Council
| 03/29/2017 06:00 PM UTC |
|
7905 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 15) - 2017
Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 15) - 2017
| 03/29/2017 06:00 PM UTC |
|
7910 - State Street Capitol Garage Relighting and Electrical Controls and Upgrade
7910 - State Street Capitol Garage Relighting and Electrical Controls and Upgrade
| 03/24/2017 06:00 PM UTC |
|
7922 - Goodman Park Ice Rink Lighting Improvements
Goodman Park Ice Rink Lighting Improvements
| 03/24/2017 06:00 PM UTC |
|
7798 - Resurfacing with Utilities 2017
Resurfacing with Utilities 2017
| 03/24/2017 06:00 PM UTC |
|
7844 - South High Point Road Turn Lane at Velvet Leaf Drive
South High Point Road Turn Lane at Velvet Leaf Drive
| 03/24/2017 06:00 PM UTC |
|
7813 - Sunset Courts Assessment District - 2017
Sunset Courts Assessment District - 2017
| 03/24/2017 06:00 PM UTC |
|
7934 - Madison Municipal Building - Window Asbestos Removal
7934 - Madison Municipal Building - Window Asbestos Removal
| 03/15/2017 06:00 PM UTC |
|
7906 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 17) - 2017
Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 17) - 2017
| 03/15/2017 06:00 PM UTC |
|
7903 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 17) by the Common Council
Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb & Gutter Work Ordered (District 17) by the Common Council
| 03/15/2017 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.