General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9801PlanHolders10082026.pdf (69.8 KB)
Contract 9801 - Madison LakeWay SkyLine Improvements
2 Documents

Upcoming Solicitations

Number Deadline
9801 - Madison LakeWay - SkyLine Improvements
The Madison LakeWay – SkyLine Improvements are the culmination of a multi-year collaboration among public and private partners to create a more welcoming, accessible, and vibrant public shoreline along Lake Monona. The project will provide a green, inviting linear parkway along one-half mile of shoreline adjacent to John Nolen Drive. The project scope builds upon work completed under the John Nolen Drive Reconstruction project (WisDOT Project# 5992-11). The new SkyLine shoreline amenities include two boardwalks, a pier, pedestrian-scale site lighting, enhanced paths, seating and bicycle amenities, wayfinding signage, and extensive site landscaping. This single contract is for the construction of the Madison LakeWay – SkyLine Improvements for the Madison Parks Division.
12/17/2026 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
9674 - 346 E. Lakeside Demolition
This project includes the demolition of the house at 346 E. Lakeside Street and the restoration of the site to turf and a gravel path. The house is located on Lake Monona between another residential property and existing park property. Major features to be removed include: the house, garage, deck, fence lines, concrete path, asphalt drive, and existing vegetation.
09/18/2025 07:00 PM UTC
9687 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
09/18/2025 07:00 PM UTC
9679 - Olin Park Pedestrian Bridge Replacement
This project consists of the replacement of a pedestrian bridge at Olin Park in Madison, WI including but not limited to the following: • Removal of existing bridge • Bridge fabrication, delivery and installation of new bridge on existing abutments
09/18/2025 07:00 PM UTC
8801 - Troy Drive Green Avenue Sanitary Sewer with Resurfacing Knutson Drive and Green Avenue Assessment District - 2024
The work under this contract shall include, but is not limited to, installation sanitary sewer main and laterals, adjustment of water valves, and storm inlets, pulverize and shape the existing asphalt pavement, full width grinding of the existing pavement, bus pad installation, and spot replacement of curb and gutter and sidewalks, and new pavement marking.
09/18/2025 07:00 PM UTC
9659 - Engineering Operations Facility (EOF) Locker Room Renovation
This contract is for improvements to the Engineering Services Building (ESB) Locker Room located at 1600 Emil Street, Madison, WI. The work includes, but is not limited to, removal and replacement of mechanical, electrical, and plumbing systems, removal and construction of interior walls, removal and replacement of slabs on grade, and interior renovations to create 12 individual use restrooms (4 of these rooms also have showers), and a general locker room area within the footprint of the existing building.
09/04/2025 07:00 PM UTC
9682 - Monona Terrace Tunnel Lighting
This work generally consists of the replacement and upgrades to the existing lighting and electrical systems under the Monona Terrace Parking structure.
09/04/2025 07:00 PM UTC
9657 - Stricker Pond Forebay Dredging
Dewater and dredge the existing stormwater forebay located at the City of Madison Park Stricker's Pond, 7214 Longmeadow Rd. This work also includes construction of four catch basins, topsoiling and native seeding.
09/04/2025 07:00 PM UTC
9670 - MADISON MUNICIPAL BUILDING FLAGPOLE REPLACEMENT
This contract is for the removal of the existing flagpole and the replacement/installation of two new flagpoles at the entrance of the Madison Municipal Building located at 215 Martin Luther King Jr Blvd. This work includes, but is not limited to, general site and earthwork, general building construction, electrical, and concrete work.
08/21/2025 07:00 PM UTC
9673 - Bartillon Shelter Fiber Connection
1904 Bartillon Drive, Madison, WI.
08/21/2025 07:00 PM UTC
9677 - Quann Park Lighting Project
The project generally consists of installing City-standard path lighting (LED, cut-off fixtures) along the Quann Park Path. The project also includes work at Penn Park to install two solar street lighting units.
08/21/2025 07:00 PM UTC
61 - 70 of 1126 Solicitations
1 2 3 4 5 7 9 10 11 … 112 113