General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
7433-State Street Sidewalk Repairs
State Street Sidewalk Repairs
05/22/2015 06:00 PM UTC
7429-Commercial Avenue (CTH T) & N. Sprecher Road Intersection Improvements-2015
Commercial Avenue (CTH T) & N. Sprecher Road Intersection Improvements-2015
05/22/2015 06:00 PM UTC
7442-Turner Avenue Assessment District-2015
Turner Avenue Assessment District-2015
05/22/2015 06:00 PM UTC
7441 - Hoepker Road Assessment District - 2015
7441 - Hoepker Road Assessment District - 2015
05/22/2015 06:00 PM UTC
7386 - Tenney Lagoon Shoreline Restoration & Tenney Park (E. Johnson St.) Bike Path
7386 - Tenney Lagoon Shoreline Restoration & Tenney Park (E. Johnson St.) Bike Path
05/22/2015 06:00 PM UTC
7395-Madison Street Reconstruction and Oakland Avenue Resurfacing Assessment District-2015 and Block 1 Wingra Park Alley Reconstruction Assessment District-2015
Madison Street Reconstruction and Oakland Avenue Resurfacing Assessment District-2015 and Block 1 Wingra Park Alley Reconstruction Assessment District-2015
05/15/2015 06:00 PM UTC
7375-Lake Edge Park Shelter
Lake Edge Park Shelter
05/13/2015 06:00 PM UTC
7245-Capital City Path Reconstruction and Bridge Replacement
Capital City Path Reconstruction and Bridge Replacement; Engineers Estimate: $848,700
05/08/2015 06:00 PM UTC
7392-Nakoma Park Pedestrian Entrance Steps-Masonry Repairs
Nakoma Park Pedestrian Entrance Steps-Masonry Repairs; Engineers Estimate: $220,000
05/08/2015 06:00 PM UTC
7444-Local Road Traffic Calming & Arterial Pedestrian Enhancements-2015
Local Road Traffic Calming & Arterial Pedestrian Enhancements-2015
05/08/2015 06:00 PM UTC
841 - 850 of 1087 Solicitations
1 2 81 82 83 85 87 88 89 108 109