| 9813PlanHolders07102026.pdf (89.8 KB) |
Contract 9813 - Overture Center Garage Electrical
| |
| Number | Deadline |
|---|---|
|
9813 - Overture Center Garage Electrical Upgrade
Electrical system upgrades at the Overture Center Garage. Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components (new electrical rooms, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement.
| 07/30/2026 07:00 PM UTC |
|
8708 - Hermina Street Pedestrian-Bike Bridge Over Starkweather Creek
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk & ramps, block retaining wall, lighting conduit and base/poles, concrete bridge abutments/wingwalls, concrete bridge approaches, pre-fabricated steel truss bike/pedestrian bridge installation, pipe railing installation, channel grading, rip rap installation, ground restoration, pavement markings, erosion control installations, and work zone traffic control signs and devices.
| 07/30/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
8783 - Shawnee Pass Assessment District 2025, Nakoma Sidewalk, and Nakoma Culvert
The work under this contract shall include, but is not limited to, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, sanitary sewer replacement, and replacement of storm sewer main, culvert, and storm sewer structures.
| 04/17/2025 07:00 PM UTC |
|
9610 Imagination Center at Reindahl Park
Work shall include but is not limited to, general site and building construction including civil, landscape, architectural, mechanical, electrical, plumbing, fire suppression, fire alarm, technology, and site utilities.
| 04/03/2025 07:00 PM UTC |
|
9633 - CIPP 2025 Churchill Dr Water Main Rehabilitation
The rehabilitation of these water mains is to be completed by lining the existing water mains with a Class IV structural cured-in-place pipe (CIPP), certified for the conveyance of drinking water.
| 04/03/2025 07:00 PM UTC |
|
9617 - Solar PV - Water Utility Olin Ave
The work includes installation of new arrays totaling 74 kW across the two buildings and the reinstallation of a 9.84 kW array on the office building.
| 03/27/2025 07:00 PM UTC |
|
9627 - South Madison Demolitions & Site Restorations
Hazmat remediation and demolition of structures, removing site features and site restoration grading and reseeding of six parcels located at 810 & 818 W. Badger Rd., 814-826 North Ave., 1810 South Park St., and 1901-1915 South Park St.
| 03/27/2025 07:00 PM UTC |
|
8757 - Bartillon Sidewalk
The work under this contract shall include, but is not limited to, clearing, grubbing, concrete sidewalk, and terrace restoration with topsoil, seed, and matting.
| 03/27/2025 07:00 PM UTC |
|
8794 - Chip Sealing 2025 - West
The work under this contract consists of street sweeping and cleaning of all loose material, vegetation and other objectionable material, the protection of inlets and castings and chip sealing.
| 03/27/2025 07:00 PM UTC |
|
8795 - Chip Sealing 2025 - South
The work under this contract consists of street sweeping and cleaning of all loose material, vegetation and other objectionable material, the protection of inlets and castings and chip sealing.
| 03/27/2025 07:00 PM UTC |
|
8781 - Evergreen Avenue, Ohio Avenue, Sommers Avenue Assessment District - 2025
The work under this contract shall include, but not be limited to, tree removal, replacement of sanitary sewer main, replacement of sanitary laterals, replacement of water main, reconnection of water services, and replacement of storm sewer main and storm sewer structures, excavation, base preparation, curb and gutter, driveway aprons, sidewalk spot replacement, asphalt pavement, pavement marking, signing, replacement of a traffic signals, and replacement of street lighting.
| 03/27/2025 07:00 PM UTC |
|
8800 - 2025 Safe Streets
The work under this contract shall include, but is not limited to, excavation, base preparation, curb and gutter, concrete medians, driveway aprons, sidewalk, asphalt pavement, and replacement of storm sewer main and storm sewer structures.
| 03/20/2025 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.