General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
7473-2015 Park Playgrounds - Group 1
2015 Park Playgrounds - Group 1 Engineers Estimate: $230,400.
02/20/2015 07:00 PM UTC
7412 - Resurfacing 2015 - Curb & Gutter and Castings
7412 - Resurfacing 2015 - Curb & Gutter and Castings; Engineer's estimate: $509,912
02/20/2015 07:00 PM UTC
7413 - Resurfacing 2015 - Asphalt Pavement Pulverizing, Milling & Paving
7413 - Resurfacing 2015 - Asphalt Pavement Pulverizing, Milling & Paving; Engineer's estimate: $1,912,869
02/20/2015 07:00 PM UTC
7366 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 10) - 2015
7366 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 10) - 2015; Engineer's estimate: $110,000
02/20/2015 07:00 PM UTC
7414 - Resurfacing 2015 - Asphalt Base Patching and Base Patch Grinding
7414 - Resurfacing 2015 - Asphalt Base Patching and Base Patch Grinding; Engineer's estimate: $793,015
02/20/2015 07:00 PM UTC
6891 - Fire Station Admin Office Building and Fire Station 1
Fire Station Admin Office Building and Fire Station 1; Engineer's estimate: $ 9.2M
02/06/2015 07:30 PM UTC
7270 - HWY 151/Lancaster Dr Water Main Crossing
7270 - HWY 151/Lancaster Dr Water Main Crossing; Engineer estimate: $654,400
02/06/2015 07:00 PM UTC
7419 - S Owen Drive Assessment District-2015
S Owen Drive Assessment District-2015 Engineers Estimate: $935,200.
02/06/2015 07:00 PM UTC
7367 - Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 20) - 2015
Annual Horizontal Sawcutting of Concrete Sidewalk and Incidental Work (District 20) - 2015 Engineers Estimate: $64,000
02/06/2015 07:00 PM UTC
7364 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered ( District 20) by the Common Council
7364 - Annual Construction and Reconstruction of Concrete Sidewalk and Incidental Concrete Curb and Gutter Work Ordered ( District 20) by the Common Council; Engineers estimate: $1,500,000
02/06/2015 07:00 PM UTC
891 - 900 of 1087 Solicitations
1 2 86 87 88 90 92 93 94 108 109