General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9813PlanHolders07102026.pdf (89.8 KB)
Contract 9813 - Overture Center Garage Electrical
2 Documents

Upcoming Solicitations

Number Deadline
9813 - Overture Center Garage Electrical Upgrade
Electrical system upgrades at the Overture Center Garage. Work includes new electrical power distribution, lighting, new electric heaters, conditioned electrical rooms, concrete slabs, architectural components (new electrical rooms, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement.
07/30/2026 07:00 PM UTC
8708 - Hermina Street Pedestrian-Bike Bridge Over Starkweather Creek
The work under this contract shall include, but is not limited to excavation, storm sewer pipe and structure installation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk & ramps, block retaining wall, lighting conduit and base/poles, concrete bridge abutments/wingwalls, concrete bridge approaches, pre-fabricated steel truss bike/pedestrian bridge installation, pipe railing installation, channel grading, rip rap installation, ground restoration, pavement markings, erosion control installations, and work zone traffic control signs and devices.
07/30/2026 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
7451 - Center Avenue and Sommers Avenue Reconstruction Assessment District - 2015
7451 - Center Avenue and Sommers Avenue Reconstruction Assessment District - 2015; Engineer's estimate: $665,349.50
04/10/2015 06:00 PM UTC
7506 - Anderson Street Sanitary Lining Repair
7506 - Anderson Street Sanitary Lining Repair; Engineer's estimate: $123,059.50
04/10/2015 06:00 PM UTC
7416 - Sidwalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair (East) - 2015
7416 - Sidwalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair (East) - 2015; Engineer's estimate: $215,000
04/10/2015 06:00 PM UTC
7435 - Larkin St., Glenway St., Hillcrest Dr., Zwerg Dr. & Ross St. Resurfacing With Utilities Assessment District-2015
Larkin St., Glenway St., Hillcrest Dr., Zwerg Dr. & Ross St. Resurfacing With Utilities Assessment District-2015 Engineers Estimate: $2,467,941.50
04/01/2015 06:00 PM UTC
7437-Utility Replacement with Resurfacing - 2015
Utility Replacement with Resurfacing - 2015; Engineer's Estimate: $2.4 Million
04/01/2015 06:00 PM UTC
7426 - Repairing and Sealing Pavement Cracks, Local Streets-2015
Repairing and Sealing Pavement Cracks, Local Streets-2015 Engineers Estimate: $340,000
03/27/2015 06:00 PM UTC
7427 - Repairing and Sealing Pavement Cracks, Major Streets-2015
Repairing and Sealing Pavement Cracks, Major Streets-2015 - Engineers Estimate: $370,000.
03/27/2015 06:00 PM UTC
7496-2015 Parking Garage Maintenance
2015 Parking Garage Maintenance Engineers Estimate: $414,250.
03/27/2015 06:00 PM UTC
7383-HVAC Upgrade for Olbrich Botanical Gardens-Phase 1
HVAC Upgrade for Olbrich Botanical Gardens-Phase 1 Engineers Estimate: $300,000.
03/27/2015 06:00 PM UTC
7488-2015 Dog Park Improvements
2015 Dog Park Improvements Engineers Estimate: $90,000.
03/27/2015 06:00 PM UTC
891 - 900 of 1118 Solicitations
1 2 86 87 88 90 92 93 94 111 112