General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9726PlanHolders04032026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9766PlanHolders04032026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
3 Documents

Upcoming Solicitations

Number Deadline
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.
04/23/2026 07:00 PM UTC
9756 - Sherman/Shabazz Public Improvements
This project consists of water main improvements on Spohn Ave, from N Sherman Ave to Ruskin St located within an existing utility easement located at 1601 N Sherman Ave. The existing water main infrastructure in this area consists of 6-inch, and 10-inch sand cast iron pipe from the 1940’s.
04/23/2026 07:00 PM UTC
8562 - Pontiac Trial, Boston Court, Nokomis Court, and Rosewood Court - Assessment District 2025
The work under this contract shall include, but is not limited to, tree removal, excavation, base preparation, curb and gutter, driveway aprons, sidewalk, asphalt pavement, pavement marking, replacement of sanitary sewer main and structures, and replacement of storm sewer main and structures.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
7347 - Fire Station #3 Roof Replacement
Fire Station #3 Roof Replacment Enginneers Estimate: $125,000.00
07/25/2014 06:00 PM UTC
7286 - Yahara Hills Facility Improvements - Roof Replacement
Yahara Hills Facility Improvements - Roof Replacement; Engineer's Estimate: $125,000
07/25/2014 06:00 PM UTC
7356 - 2014 or 2015 Construction for Bittersweet Place Assessment District-2014
2014 or 2015 Construction for Bittersweet Place Assessment District-2014 ENGINEERS ESTIMATE: $750,000.
07/11/2014 06:00 PM UTC
7325-Brittingham Park Paving Improvements
Brittingham Park Paving Improvements Engineers Estimate: $48,000.
07/11/2014 06:00 PM UTC
7343 - Highland Manor Storm Shelter (Building Component)
Highland Manor Storm Shelter (Building Component); Engineers Estimate: $1,509,000.
07/02/2014 06:00 PM UTC
7321-Structural Rehabilitation of Water Mains-2014 West
7321-Structural Rehabilitation of Water Mains-2014 West Engineers Estimate: $523,100.00
07/02/2014 06:00 PM UTC
7252 - Local Road Traffic Calming & Arterial Pedestrian Enhancements - 2014
Traffic Calming & Arterial Pedestrian Enhancements - 2014; Engineer's Estimate: $150,000
06/27/2014 06:00 PM UTC
7224 - Cross Oak Drive Assessment District - 2014
Cross Oak Drive Assessment District - 2014; Engineer's Estimate: $1,523,915.43
06/27/2014 06:00 PM UTC
7351 - Wright Street Sidewalk
Wright Street Sidewalk; Engineers Estimate: $54,000
06/27/2014 06:00 PM UTC
7226 - Elderberry Road Assessment District-2013
Elderberry Road Assessment District-2013; Engineers Estimate: $477,489.
06/27/2014 06:00 PM UTC
931 - 940 of 1087 Solicitations