General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 65-1-2026
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.;
07/14/2026 03:30 PM UTC
OFFICIAL NOTICE 16-1-2026
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, ETC. Located at: ST216250107 – E. Hartford Ave. – N. Downer Ave. to N. Oakland Ave.
07/22/2026 03:30 PM UTC
OFFICIAL NOTICE 53-1-2026
Police Administration Building (PAB) Parking Garage Repairs Phase 2
07/27/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/05/2026 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 13-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171103) - Asphalt Overlays located at: N. 12th St. - W. Center St. to W. Locust St., N. Holton St. - W. Locust St. to W. Keefe Ave., W. Locust St. - N. Sherman Blvd. to N. 51st St., W. Vliet St. - N. 47th St. to N. 60th St., W. Walnut St. - N. Dr. MLK Jr. Dr. to N. 6th St
03/16/2017 03:30 PM UTC
OFFICIAL NOTICE 18-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216170108) - Asphalt Overlays located at: S. 27th St. (Westside Roadway) - RR ROW s/o W. Cleveland Ave. to W. Lincoln Ave., E. Oklahoma Ave. - S. Superior St. to S. Kinnickinnic Ave.
03/14/2017 03:30 PM UTC
OFFICIAL NOTICE 18-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171108) - Asphalt Overlays located at: S. 27th St. (Westside Roadway) - RR ROW s/o W. Cleveland Ave. to W. Lincoln Ave., E. Oklahoma Ave. - S. Superior St. to S. Kinnickinnic Ave.
03/14/2017 03:30 PM UTC
OFFICIAL NOTICE 29-1-2017
Recycling of Residential Electronic Materials. The work in this project includes provisions for collection, transportation, processing, recycling, and disposal of residential electronic materials for recovery of resources and diversion from landfill and to comply with all local and state laws. Companies responding to this bid shall review and comply with the requirements specified in the bid.
03/13/2017 02:30 PM UTC
OFFICIAL NOTICE 33-1-2017
WATER MAIN RELAYS at the following locations: E. Locust St. (WT410170605), N. Farwell Av. to N. Downer Av. (32 working days); E. Kane Pl. (WT410170628), N. Farwell Av. to N. Prospect Av. (18 working days); W. Glendale Av. (WT410170637), N. Parkway Av. to N. Green Bay Av. (11 working days); N. Franklin Pl. (WT410150653), N. Prospect Av. to E. Ogden Av. (23 working days); N. Summit Av. (WT410160663), E. Kane Pl. to E. Lafayette Pl. (20 working days); E. Kane Pl. (WT410160664), N. Prospect Av. to N. Summit Av. (11 working days) (Note: Contractor to furnish and install approximately 3,825 lin. ft. of 16”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/10/2017 04:30 PM UTC
OFFICIAL NOTICE 34-1-2017
WP-317: PIPE GALLERY ROOF REPLACEMENTS LOCATED AT LINNWOOD WATER TREATMENT PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
03/10/2017 04:30 PM UTC
OFFICIAL NOTICE 36-1-2017
City-Wide Removal of Weeds and Tall Grasses, Sidewalk Snow and Ice and Right-of-Way Encroachments from Private Property in Violation of City Ordinance 80-17, 116-8, and 116-55.
03/09/2017 04:30 PM UTC
OFFICIAL NOTICE 19-1-2017
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216160110 - Handicap Ramp Work to Meet ADA Requirements at Various Locations on the 2017 High Impact Paving Projects
03/08/2017 04:30 PM UTC
OFFICIAL NOTICE 17-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216170107) - Asphalt Overlays located at: N. 27th St. - W. Center St. to W. Townsend St., W. Atkinson Ave. - N. 27th St. to N. 32nd St., W. Cameron Ave. - N. 32nd St. to N. 35th St., W. Keefe Ave. - N. Sherman Blvd. to N. 51st St., E. Kenwood Blvd. - N. Lake Dr. to N. Downer Ave., N. Shepard Ave. - E. Kenwood. Blvd. to E. Hartford Ave., W. Wells St. - N. 16th St. to N. 27th St.
03/07/2017 04:30 PM UTC
OFFICIAL NOTICE 17-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171107) - Asphalt Overlays located at: N. 27th St. - W. Center St. to W. Townsend St., W. Atkinson Ave. - N. 27th St. to N. 32nd St., W. Cameron Ave. - N. 32nd St. to N. 35th St., W. Keefe Ave. - N. Sherman Blvd. to N. 51st St., E. Kenwood Blvd. - N. Lake Dr. to N. Downer Ave., N. Shepard Ave. - E. Kenwood. Blvd. to E. Hartford Ave., W. Wells St. - N. 16th St. to N. 27th St.
03/07/2017 04:30 PM UTC
1071 - 1080 of 1593 Solicitations
1 2 104 105 106 108 110 111 112 159 160