General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 89-1-2026
City of Milwaukee Department of Public Works-Parking Snow Plowing, Salting, Mowing and Trash Removal from DPW Parking Lots, MPS Lots Snow Emergency Service
11/19/2026 04:30 PM UTC
OFFICIAL NOTICE 89-2-2026
City of Milwaukee Department of Public Works-Parking Snow Plowing, Salting, Mowing and Trash Removal from DPW Parking Lots, MPS Lots Snow Emergency Service
11/19/2026 04:30 PM UTC
OFFICIAL NOTICE 89-3-2026
City of Milwaukee Department of Public Works-Parking Snow Plowing, Salting, Mowing and Trash Removal from DPW Parking Lots, MPS Lots Snow Emergency Service
11/19/2026 04:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 84-1-2016
CONSTRUCTION OF 8” CONCRETE PAVEMENT, 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, CONCRETE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST212040117) Alley Bounded By - W. Scott St., W. Washington St., S. 7th St., & S. 8th St. (ST212160112) Alley Bounded By - W. Adler St., W. Main St., S. 72nd St., & S. 73rd St. (ST211141153) The Intersection of W. Pierce St. @ S. 37th St. (Pedestrian Crossing) (Also ST214160102)
07/25/2016 03:30 PM UTC
OFFICIAL NOTICE 92-1-2016
MILWAUKEE FIRE DEPARTMENT ENGINE HOUSE #2 - HEADQUARTERS 711 WEST WELLS STREET MILWAUKEE WI
07/22/2016 03:30 PM UTC
OFFICIAL NOTICE 73-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 8” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC., located at: (ST211150172) - W. Douglas Ave. - N. 55th St. to N. 60th St. (ST211150171) - N. 55th St. - W. Florist Ave. to a pt. 190' N of W. Douglas Ave.
07/21/2016 03:30 PM UTC
OFFICIAL NOTICE 68-1-2016
WP-307: REPLACEMENT OF MOTOR CONTROL CENTER NO. 4 LOCATED AT 3000 N LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
07/20/2016 03:30 PM UTC
OFFICAIL NOTICE 088-1-2016
CONSTRUCTION OF BIORETENTION FACILITIES AND SITE WORK INCLUDING CONCRETE CURB AND GUTTER, SITE PLANTINGS, SEEDING, ETC, NORTH 107TH STREET GREEN STREET PROJECT: LOCATED AT NORTH 107TH STREET BETWEEN WEST GOOD HOPE ROAD AND WEST BROWN DEER ROAD
07/14/2016 03:30 PM UTC
OFFICIAL NOTICE 76-1-2016
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SEALING PAVEMENT JOINTS AND CRACKS, CONCRETE REMOVALS, AND SEWER WORK, ETC., located at (ST211150114) N. 54th Blvd. - W. Keefe Ave. to W. Melvina St. (ST211150184) W. Walker St. - S. 2nd St. to S. 3rd St.
07/12/2016 03:30 PM UTC
OFFICIAL NOTICE 85-1-2016
WATER MAIN RELAYS & HYDRANT ALTERATIONS – W. Tallmadge Pl. (N. 73rd St) (WT410160645), 500’ S/O N. Prentiss St. to N. Prentiss St. (14 Working Days); W. Sheridan Ave. (WT410160646), N. 69th St. to N. 76th St. (56 Working Days); N. Prentiss St. (WT410160647), W. Tallmadge Pl. to W. Sheridan Ave. (16 Working Days); N. 74th St. (WT410160648), W. Custer Ave. to W. Tallmadge Pl. (19 Working Days); W. Elm St. (WT410160010), N. Teutonia Ave. to 1600’ W/O N. Teutonia Ave. (6 Working Days).
07/11/2016 03:30 PM UTC
OFFICIAL NOTICE 86-1-2016
Water Main Relays – W. Hope Ave. (WT410160656), N. 74th St. to N. 75th St. (12 Working Days); N. 69th St. (WT410160657), W. Fiebrantz Ave. to W. Marion St. (43 Working Days Days); N. 78th St. (WT410160703), W. Luscher Ave. to W. Gertrude Dr. (16 Working Days); W. Gertrude Dr. (WT410160704), W. Stark St. to W. Palmetto Ave. (17 Working Days). (Note: Contractor to furnish and install approximately 3,280 lin. ft. of 8” and 6” DI pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/08/2016 03:30 PM UTC
OFFICIAL NOTICE 81-1-2016
MILWAUKEE & MICHIGAN PARKING STRUCTURE ELEVATOR MODERNIZATION 535 NORTH MILWAUKEE STREET MILWAUKEE, WI
07/01/2016 03:30 PM UTC
OFFICIAL NOTICE 66-1-2016
COMBINED SEWER MAINS RELAY AND COMBINED SEWER LINING, MANHOLE REPAIR AND LINING in: S. 6th St. – W. Becher St. to 115’+/- North of W. Lincoln Ave., S. 35th St. – W. National Ave. to W. Scott St., W. Lincoln Ave. – S. 7th St. to S. 8th St., W. Lincoln Ave. – S. 20th St. to S. 21st St. & W. Lincoln Ave. – S. 26th St. to S. Layton Blvd.
06/30/2016 03:30 PM UTC
1161 - 1170 of 1614 Solicitations
1 2 … 113 114 115 117 119 120 121 … 161 162