We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2026
Northwest Garage & DPW Field Headquarters – Air Handling Unit Replacement The project involves two different project sites. At the DPW Field Headquarters an existing rooftop unit will be removed and replaced with a new rooftop unit. At the Northwest Garage an existing air handling unit, energy recovery unit, and associated VAV boxes will be removed and replaced with a new rooftop unit, new VAV boxes, and new energy recovery unit. Both locations include controls improvements. There is mechanical, structural, and controls scope (NIC).
09/17/2026 03:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 24-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.;Located at: (ST211150173) - N. Holton St. - E. Capitol Dr. to E. Hope Ave. (ST211150174) - E. Hope Ave. - N. Richards St. to N. Holton St.
04/18/2016 03:30 PM UTC
OFFICIAL NOTICE 28-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 5”, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211040107) - W. Woolworth Ave. - N. Sherman Blvd. to N. 51st St.
04/15/2016 03:30 PM UTC
OFFICIAL NOTICE 25-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211150102) - N. 70th St. - 1000' +/- s/o W. Glenbrook Rd. to W. Glenbrook Rd. (ST211150159) - W. Fairmount Ave. - N. 107th St. to N. 108th St. (ST211150134) - N. 91st St. - W. Center St. to W. Locust St.
04/14/2016 03:30 PM UTC
OFFICIAL NOTICE 43-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Whitaker Ave. (WT410160604), S. 20th St. to S. Louisiana Ave. (22 Working Days); S. 25th St. (WT410160614), W. Holt Ave. to W. Warnimont Ave. (32 Working Days); S. 26th St. (WT410160615), W. Ohio Ave. to W. Holt Ave. (16 Working Days); W. Euclid Ave. (WT410160616), S. 22nd St. to S. 23rd St. (9 Working Days); W. Warnimont Ct. (WT410160622), S. 68th St. to 160ft West of S. 68th St. (10 Working Days); W. Dodge Pl. (WT410160623), 70ft Southeast of W. Wilbur Ave. to 570ft Southeast of W. Wilbur Ave. (19 Working Days); W. Tripoli Ave. (WT410160668), S. 67th St. to S. 68th St. (17 Working Days).
04/08/2016 03:30 PM UTC
OFFICIAL NOTICE 49-1-2016
CONCRETE REPLACEMENT SERVICES VARIOUS SITES MILWAUKEE, WI
04/05/2016 03:30 PM UTC
OFFICIAL NOTICE 40-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Thurston Ave. (WT410160638), N. 71st St. to N. 72nd St. (16 Working Days); N. 71st St. (WT410160639), W. Thurston Ave. to W. Bobolink Ave. (26 Working Days); N. 63rd St. (WT410160640), W. Bobolink Ave. to W. Florist Ave. (16 Working Days); N. 67th St. (WT410160641), W. Bobolink Ave. to W. Florist Ave. (17 Working Days); N. 65th St. (WT410160642) W. Carmen Ave. to W. Florist Ave. (32 Working Days); N. 62nd St. (410160643), W. Carmen Ave. to W. Bobolink Ave. (17 Working Days); W. Bobolink Ave. (WT410160644), N. 64th St. to N. 65th St. (11 Working Days)
04/01/2016 03:30 PM UTC
OFFICIAL NOTICE 41-1-2016
COMBINED SEWER MAINS RELAY in: E. Chicago St. – N. Milwaukee St. to N. Jackson St. N. Jefferson St. – E. Buffalo St. to E. St. Paul Ave.
03/31/2016 03:30 PM UTC
OFFICIAL NOTICE 27-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” AND 8” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (TD04284001) - W. Medford Ave. - W. Congress St. to N. 68th St. (TID-42)
03/30/2016 03:30 PM UTC
OFFICIAL NOTICE 21-1-2016
This project involves the center lock replacement at the Water Street Bascule Bridge over the Milwaukee River.
03/29/2016 03:30 PM UTC
OFFICIAL NOTICE 12-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211140107) - S. 71st St. - W. Kinnickinnic River Pkwy. to W. Cleveland Ave.
03/28/2016 03:30 PM UTC