General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 65-1-2026
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.;
07/14/2026 03:30 PM UTC
OFFICIAL NOTICE 16-1-2026
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, ETC. Located at: ST216250107 – E. Hartford Ave. – N. Downer Ave. to N. Oakland Ave.
07/22/2026 03:30 PM UTC
OFFICIAL NOTICE 53-1-2026
Police Administration Building (PAB) Parking Garage Repairs Phase 2
07/27/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/05/2026 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 118-2-2015
COMBINED SEWER MAIN RELAY AND SANITARY AND STORM SEWER MAINS LINING, AND MANHOLE REPAIR & LINING IN: N. 48th St. – W. Vliet St. to W. Cherry St.; W. Vliet St. – N. 45th St. to N. 49th St.; W. Wells St. – N. 45th Pl. to Stadium Freeway; W. Wells St. – N. 51st St. to N. 55th St.; N. 53rd St. – W. Wisconsin Ave. to W. Wells St.; N. 55th St. – 93' south of W. Wells St. to W. Wells St.; W. Wisconsin Ave. – N. 45th St. to N. 46th St.
08/28/2015 03:30 PM UTC
OFFICIAL NOTICE 118-3-2015
SANITARY AND STORM SEWER MAINS LINING, REPAIR AND MANHOLE REPAIR & LINING IN: Area Bounded By W. Capitol Dr. to W. Fond Du Lac Ave. and N. 51st Blvd. to W. Ely Pl.; Area Bounded By N. 35th St. to N. 47th St. and W. Capitol Dr. to W. Congress St.
08/28/2015 03:30 PM UTC
OFFICIAL NOTICE NO. 97
7” & 9” CONCRETE DRIVEWAYS, 5” CONCRETE WALK, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, AND SEWER WORK, ETC., located at: (ST211150106) S. 2nd St. – W. Edgerton Ave. to Pt. 800’ N. of W. Vogel Ave.
08/27/2015 03:30 PM UTC
OFFICIAL NOTICE NO. 99
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC, located at: (ST211140132) N. 72nd St. - W. Congress St. to W. Hampton Ave.; (ST211150149) N. Norwood Pl., W. Philip Pl., & N. 57th St.
08/27/2015 03:30 PM UTC
OFFICIAL NOTICE NO. 100
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 9” REINFORCED CONCRETE PAVEMNT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, AND SEWER WORK, ETC., located at (ST212150102) Alley: W. Lakefield Dr.,W. Ohio Av.,W. Ruskin St., S. 35th St., S. 36th St., S. 37th St.; (ST211140182) W.Garfield Ave. @ N. 7th St.; (ST211150201) N. 22nd St. at W. Galena St.; (ST212150104) Alley: N. Bartlett Av., E. Kenwood Bld., E. Linnwood Av., N. Oakland Av.
08/26/2015 03:30 PM UTC
OFFICIAL NOTICE 121-1-2015
2ND AND PLANKINTON PARKING STRUCTURE WEST ELEVATOR MODERNIZATION 724 NORTH 2ND STREET MILWAUKEE WI
08/21/2015 03:30 PM UTC
OFFICIAL NOTICE 107-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC, located at: (ST211140140) W. Medford Ave. - W. Hampton Ave. to W. Grantosa Dr.
08/21/2015 03:30 PM UTC
OFFICIAL NOTICE 104-1-2015
FURNISHING PLOW TRUCKS AND OPERATORS FOR THE SUPPLEMENTAL CITY-WIDE SNOW PLOWING FROM CITY STREETS in the City of Milwaukee
08/20/2015 03:30 PM UTC
OFFICIAL NOTICE 124-1-2015
Lincoln Avenue Vehicle Storage Garage HVAC System Replacement 3921 West Lincoln Avenue Milwaukee, WI
08/18/2015 03:30 PM UTC
OFFICIAL NOTICE 98-1-2015
CONSTRUCTION OF 8” CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, AND ETC, located at: (ST211150103) W. Wells St. - N. 45th Pl. to N. Hawley Rd.
08/14/2015 03:30 PM UTC
1251 - 1260 of 1593 Solicitations
1 2 122 123 124 126 128 129 130 159 160