General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 65-1-2026
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.;
07/14/2026 03:30 PM UTC
OFFICIAL NOTICE 16-1-2026
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, ETC. Located at: ST216250107 – E. Hartford Ave. – N. Downer Ave. to N. Oakland Ave.
07/22/2026 03:30 PM UTC
OFFICIAL NOTICE 53-1-2026
Police Administration Building (PAB) Parking Garage Repairs Phase 2
07/27/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/05/2026 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 72-1-2015
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 1: City-Owned Lot Area 1: Area bounded by Capitol Drive, and north City limits
04/22/2015 03:30 PM UTC
OFFICIAL NOTICE 72-2-2015
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 2: City-Owned Lot Area 2: Area bounded by North Avenue, west City limit, Capitol Drive, and North 27th Street.
04/22/2015 03:30 PM UTC
OFFICIAL NOTICE 72-3-2015
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 3: City-Owned Lot Area 3: Area bounded by North Avenue, North 27th Street, Capitol Drive, and North 20th Street.
04/22/2015 03:30 PM UTC
OFFICIAL NOTICE 27-1-2015
CONSTRUCTION OF 8” CONCRETE PAVEMENT, PAVEMENT REMOVAL, 5” CONCRETE WALK, CURB & GUTTER, SEWER WORK, ETC, located at (ST211140150) E. Erie St. at E. Menomonee St. (Intersection modification) and E. Menomonee St. – N. Broadway to E. Erie St.; (ST211140156) N. Water St. at E. Pearson St. (Marsupial bridge area access); (ST211140158) W. Clybourn St. – a point east of N. 16th St. to N. 16th St. (median)
04/14/2015 03:30 PM UTC
OFFICIAL NOTICE 60-1-2015
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, 4” CRUSHED STONE BASE, SEALING PAVEMENT JOINTS & CRACKS, ETC, located at (ST212070110) Alley betw W. Holt Av, W. Morgan Av, S. 18th St, and S. 19th St.; (ST212020122) Alley betw W. Holt Av, W. Morgan Av, S. 10th St, and S. 11th St.; (ST212150110) Alley betw W. Denis Av, S. Honey Creek Dr, W. Wanda Av, and S. 41st St.
04/09/2015 03:30 PM UTC
OFFICIAL NOTICE 26-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, REPAIR PAVEMENT JOINTS AND CRACKS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SEWER WORK, ETC, located at (ST211060141) S. Burrell St. – Pt. 275’ South of E. Ohio Ave. to E. Ohio Ave.; (ST211140101) S. 53rd St. – W. Montana St. to W. Cleveland Ave.; (ST211140159) S. Kinnickinnic Ave. SE of S. California St. (Ped Crossing); (ST211140160) S. 43rd St. at W. Montana St. (Ped Crossing); (ST211140155) W. Rosedale Ave. – West of S. Chase Ave. (Bike Trail access point)
04/08/2015 03:30 PM UTC
OFFICIAL NOTICE 25-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, REPAIR PAVEMENT JOINTS AND CRACKS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SEWER WORK, ETC, located at (ST211140130) S. 79th St. – W. Morgan Ave. to W. Ohio Ave.; (ST211140138) S. 81st St. – W. Morgan Ave. to W. Holt Ave.
04/08/2015 03:30 PM UTC
OFFICIAL NOTICE 39-1-2015
WP-322: BURIED SOUTH FILTERED WATER RESERVOIR WATERPROOFING REPAIRS LOCATED AT LINNWOOD WATER TREATMENT PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
04/01/2015 03:30 PM UTC
OFFICIAL NOTICE 17-1-2015
SANITARY, COMBINED, AND STORM SEWER MAINS RELAY AND COMBINED SEWER MAIN LINING, AND MANHOLE REPAIR & LINING in: N.64th St. – 160’+/- south of W. Moltke Ave. to W. Moltke Ave. W. McKinley Ave. – N. 19th St. to N. 21st St. W. McKinley Ave. – N. 24th St. to N. 24th Pl. W. Moltke Ave. – W. Appleton Ave. to N. 68th St. W. Wells St. – N. 46th St. to N. 51st St.
03/26/2015 03:30 PM UTC
OFFICIAL NOTICE 17-2-2015
SANITARY AND COMBINED SEWER MAINS RELAY, SANITARY AND COMBINED SEWER MAINS LINING AND MANHOLE REPAIR & LINING, STORM SEWER OUTLET REHABILITATION AND NEW STORM SEWER MAIN INSTALLATION in: N. 19th St. – W. Clybourn St. to 697’ +/- north of W. Clybourn St.; N. 20th St. – W. Wells St. to W. Kilbourn Ave.; N. 21st St. – W. Clarke St. to W. Center St.; N. 24th St. – W. Lisbon Ave. to W. Vine St.; N. 26th St. – W. Hadley St. to W. Chambers St.; E. Clarke St. – N. Hubbard St. to N. Richards St.; W. Melvina St. – N. 63rd St. (in Dineen Park); W. Fond Du Lac Ave. – N. 36th St. to N. 38th St.; W. Wright St. – N. Palmer Ave. to N. Buffum St
03/26/2015 03:30 PM UTC
1311 - 1320 of 1593 Solicitations
1 2 128 129 130 132 134 135 136 159 160