We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2026
Northwest Garage & DPW Field Headquarters – Air Handling Unit Replacement The project involves two different project sites. At the DPW Field Headquarters an existing rooftop unit will be removed and replaced with a new rooftop unit. At the Northwest Garage an existing air handling unit, energy recovery unit, and associated VAV boxes will be removed and replaced with a new rooftop unit, new VAV boxes, and new energy recovery unit. Both locations include controls improvements. There is mechanical, structural, and controls scope (NIC).
09/17/2026 03:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 105-1-2014
CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC PAVEMENT, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, ETC. located at (ST211140150) E. Erie St. at E. Menomonee St., E. Menomonee St. – N. Broadway to E. Erie St.; (ST211140156) N. Water St. at E. Pearson St. (Marsupial bridge area access); (ST211140158) W. Clybourn St. – a point east of N. 16th St. to N. 16th St. (median)
09/22/2014 03:30 PM UTC
OFFICIAL NOTICE 84-1-2014
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, CUTTING, CRUSHED STONE BASE, PERMEABLE PAVERS, ETC. located at (ST212140127) Alley betw W. Hope Ave, W. Marion St., N. 61st St, and N. 62nd St (Permeable alley); (ST212020110) Alley betw W. Appleton Av, W. Congress St, W. Hope Ave, W. Potomac Ave and N. 80th St (N/S Leg) (Permeable alley); (ST212140124) Alley betw W. Hadley St, W. Locust St, N. 81st St and N. 82nd St. (Permeable alley); (ST212140120) Alley betw W. Center St, N. Grant Bl, W. Hadley St and N. Sherman Bl. (Permeable alley)
09/18/2014 03:30 PM UTC
OFFICIAL NOTICE 109-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, 6” POROUS WALK, ETC. located at (ST211140126) N. Pinecrest St. – N. Story Pkwy to N. 49th St. (Permeable Sidewalk)
09/17/2014 03:30 PM UTC
OFFICIAL NOTICE 119-1-2014
COMBINED SEWER MAINS RELAY AND LINING AND MANHOLE LINING AND REPAIR IN: E. Knapp St. - N. Van Buren St. to N. Astor St. & N. Van Buren St. - 100'+/- S. of E. Juneau Ave. to E. Knapp St.
09/16/2014 03:30 PM UTC
OFFICIAL NOTICE 119-2-2014
COMBINED SEWER MAINS RELAY AND LINING, STORM SEWER MAINS INSTALLATION, AND MANHOLE LINING AND REPAIR IN: N. Bremen St. – E. Center St. to E. Hadley St., N. Bremen St. – E. Hadley St. to E. Locust St., N. Cambridge Ave. – E. Locust St. to 455’± North of E. Locust St., E. Hadley St. – N. Holton St. to N. Humboldt Blvd., N. Holton St. – E. Hadley St. to E. Chambers St., N. Humboldt Blvd. – E. Clarke St. to 200’± South of E. Center St., E. Locust St. – N. Holton St. to N. Pierce St., E. Locust St. – N. Cambridge Ave. to N. Newhall St., and N. Pierce St. – E. Hadley St. to E. Locust St.
09/16/2014 03:30 PM UTC
OFFICIAL NOTICE 110-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, ETC. located at (ST211140151) S. 35th St. – a pt. south of W. Burnham St. to W. Mitchell St.
09/16/2014 03:30 PM UTC
OFFICIAL NOTICE 118-1-2014
54" WATER MAIN INTERNAL JOINT SEALS - N. 18TH ST. (WT410140695), W. CHERRY ST. TO W. LLOYD ST.
09/15/2014 03:30 PM UTC
OFFICIAL NOTICE 122-1-2014
Water Main Relays - W. Brentwood Av.(WT410110627), N. 80th St. to N. 82nd St.(19 Working Days); N. 80th St.(WT410110654), W. Bender Av. to W Winfield Av.(10 Working Days); W. Bender Av.(WT410110655), N. 80th St. to 660ft W/O N. 80th St. (19 Working Days); N. 77th St.(WT410130612), W. Beckett Av. to W. Ruby Av. .(14 Working Days); W. Ruby Av.(WT410130613), N. 77th St. to W Beckett Av. (13 Working Days); W. Beckett Av.(WT410130614), N. 77th St. to W. Ruby Av. (19 Working Days)
09/12/2014 03:30 PM UTC
OFFICIAL NOTICE 115-1-2014
SEALCOATING WORK, located at various locations in the City of Milwaukee.
09/08/2014 03:30 PM UTC
OFFICIAL NOTICE 116-1-2014
CRACKFILLING WORK, located at various locations in the City of Milwaukee.
09/08/2014 03:30 PM UTC