General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 65-1-2026
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.;
07/14/2026 03:30 PM UTC
OFFICIAL NOTICE 16-1-2026
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, ETC. Located at: ST216250107 – E. Hartford Ave. – N. Downer Ave. to N. Oakland Ave.
07/22/2026 03:30 PM UTC
OFFICIAL NOTICE 53-1-2026
Police Administration Building (PAB) Parking Garage Repairs Phase 2
07/27/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/05/2026 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 2-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211120121) – N. 19th St. – W. Capitol Dr. to W. Olive St., (ST21110116) N. 3rd St. – W. Auer Ave. to W. Keefe Ave. (Including replacement of speed humps (4))
02/14/2014 04:30 PM UTC
OFFICIAL NOTICE 3-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, CONCRETE WALK, SODDING, ETC, located at (ST211120119) – S. Winona Ln. – W. Forest Home Ave. to W. Burnham St., (ST211130138) S. 14th St. – W. Harrison Ave. to W. Lincoln Ave., (ST211130111) E. Bennett Ave. – S. Kinnickinnic Ave. to S. Ellen St.
02/12/2014 04:30 PM UTC
OFFICIAL NOTICE 156-1-2013
WP-308: LINNWOOD BACKUP POWER GENERATION PROJECT LOCATED AT LINNWOOD PURIFICATION PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
02/11/2014 04:30 PM UTC
OFFICIAL NOTICE 18-1-2014
GARAGE FLOORING RESTORATION MPD-6TH DISTRICT POLICE STATION 3006 SOUTH 27TH STREET MILWAUKEE, WI
02/10/2014 04:30 PM UTC
OFFICIAL NOTICE 12-1-2014
CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST216130102) – High Impact Streets – Asphalt Resurface by Contract – City Wide
02/07/2014 04:30 PM UTC
OFFICIAL NOTICE 5-1-2014
CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING PAVEMENT, REPAIR PAVEMENT JOINTS, ETC, located at (ST211130105) – N. Joseph Ave. – W. Tower Ave. to N. Pingree Ave., (ST211130108) W. Tower Ave. – W. Terra Ave. to N. 105th St. (including W. Terra Ave. – N. 102nd St. to W. Tower Ave.), (ST211130167) W. Sylvia St. – W. Villa Ave. to W. Arch Ave., (ST211130109) N. 105th St. – W. Bradley Rd. to W. Sylvia St.
02/06/2014 04:30 PM UTC
OFFICIAL NOTICE 9-1-2014
SANITARY AND STORM SEWER MAIN RELAY & LINING, AND MANHOLE CONSTRUCTION, REPAIR, & LINING IN: N. 19th Pl. – W. Courtland Ave. to W. Hampton Ave. N. 24th Pl. – 180’ +/- south of W. Hampton Ave. to 315’ +/- north of W. Hampton Ave. N. 24th St. – W. Purdue St. to W. Hampton Ave. N. 31st St. – W. Courtland Ave. to W. Hampton Ave. W. Hampton Ave. – N. Green Bay Ave. to N. 20th St. W. Hampton Ave. – N. Teutonia Ave. to 200’ +/- west of N. Teutonia Ave. W. Hampton Ave. (N/S) – N. 23rd St. to N. 24th St.
01/30/2014 04:30 PM UTC
OFFICIAL NOTICE 9-2-2014
SANITARY AND COMBINED SEWER MAIN LINING AND REPAIR, AND MANHOLE LINING AND REPAIR IN: S. 2nd St. – W. Howard Ave. to 430’ +/- south of W. Norwich St. S. 5th St. – W. Bruce St. to 200’ +/- north of W. Virginia St. S. Water St. – E. Bruce St. to E. Pierce St. S. Whitnall Ave. – E. Holt Ave. to E. Ohio Ave.
01/30/2014 04:30 PM UTC
OFFICIAL NOTICE 6-1-2014
CONSTRUCTION OF ASPHALTIC CONCRETE PAVEMENT, SUBGRADE STABILIZATION, CUTTING, ETC, located at (ST211200187) W. County Line Rd. – 100’ +/- E. of N. Swan Rd./N. 91st St. to 200’ =/- E. of N. 107th St. (Portions in the City of Mequon)
01/27/2014 04:30 PM UTC
OFFICIAL NOTICE 14-1-2014
2014 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Testing
01/27/2014 04:30 PM UTC
1491 - 1500 of 1593 Solicitations
1 2 146 147 148 150 152 153 154 159 160