General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2026
Northwest Garage & DPW Field Headquarters – Air Handling Unit Replacement The project involves two different project sites. At the DPW Field Headquarters an existing rooftop unit will be removed and replaced with a new rooftop unit. At the Northwest Garage an existing air handling unit, energy recovery unit, and associated VAV boxes will be removed and replaced with a new rooftop unit, new VAV boxes, and new energy recovery unit. Both locations include controls improvements. There is mechanical, structural, and controls scope (NIC).
09/17/2026 03:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 50-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT REMOVAL, 5” CONCRETE WALK, 7” CONCRETE DRIVEWAYS, 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, PERMEABLE PAVER BLOCKS, DETECTABLE WARNING FIELDS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, BIOSWALES, TREE CLEARING AND GRUBBING, SITE RESTORATION ETC.; Located at: ST211210127 – W. Cherry St. – A. pt. east of N. 32nd St. to N. 35th St. ST211240153 – W. Michigan St. – N. 35th St. to N. 37th St. (ext’d) (Including N. 36th St. – W. Michigan St. to W. Wisconsin Ave.)
07/30/2026 03:30 PM UTC
OFFICIAL NOTICE 70-1-2026
The general work requested is: THE CONSTRUCTION OF; 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS, 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, BIOSWALES, ETC.; Located at: TD08484211 – W. Vliet St. – N. 6th St. to N. Vel R. Phillips Ave. TD08584032 – S. 7th St. – W. National Ave. to W. Pierce St.
07/28/2026 03:30 PM UTC
OFFICIAL NOTICE 53-1-2026
Police Administration Building (PAB) Parking Garage Repairs Phase 2
07/27/2026 03:30 PM UTC
OFFICIAL NOTICE 16-1-2026
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, ETC. Located at: ST216250107 – E. Hartford Ave. – N. Downer Ave. to N. Oakland Ave.
07/22/2026 03:30 PM UTC
OFFICIAL NOTICE 65-1-2026
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.;
07/14/2026 03:30 PM UTC
OFFICIAL NOTICE 49-1-2026
The general work requested is: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, BIOSWALES, ETC.; Located at: ST211240144 – N. 89th St. – W. Silver Spring Dr. to W. Carmen Ave. ST211220178 – N. 37th St. – N. Hopkins St. to W. Hampton Ave.
07/08/2026 03:30 PM UTC
OFFICIAL NOTICE 64-1-2026
MAINTENANCE SEALCOATING INCLUDING REMOVAL AND REPLACEMENT OF CONCRETE BASE, VARIABLE THICKESS ASPHALTIC CONCRETE PAVEMENT, CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS, SEALCOAT ASPHALTIC BITUMINOUS PAVEMENTS USING A SLURRY SEAL, ETC.;
07/07/2026 03:30 PM UTC
OFFICIAL NOTICE 6-2-2026
PROJECT NO. 2: COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 15th St. – W. Meinecke Ave. to W. Wright St. N. 15th St. – W. North Ave. to W. Meinecke Ave.
07/01/2026 03:30 PM UTC
OFFICIAL NOTICE 6-1-2026
PROJECT NO. 1: SANITARY AND STORM SEWER MAIN RELAY & SANITARY SEWER MAIN LINING. Located at: N. 42nd St. – 50’ S. of W. Courtland Ave. to 50' N. of W. Courtland Ave. N. 55th St.– W. Townsend St. to W. Keefe Ave. W. Keefe Ave.– N. 53rd St. to N. 60th St.
07/01/2026 03:30 PM UTC
OFFICIAL NOTICE 55-1-2026
Kneeland Properties Infrastructure Improvement Project - 825, 907, and 1025 West Mt. Vernon Avenue, Milwaukee, WI
06/30/2026 03:30 PM UTC
11 - 20 of 1608 Solicitations
2 4 5 6 7 8 9 160 161