General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2026
Northwest Garage & DPW Field Headquarters – Air Handling Unit Replacement The project involves two different project sites. At the DPW Field Headquarters an existing rooftop unit will be removed and replaced with a new rooftop unit. At the Northwest Garage an existing air handling unit, energy recovery unit, and associated VAV boxes will be removed and replaced with a new rooftop unit, new VAV boxes, and new energy recovery unit. Both locations include controls improvements. There is mechanical, structural, and controls scope (NIC).
09/17/2026 03:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 119-1-2024
2nd and Plankinton Parking Structure Renovation 2nd and Plankinton parking structure renovation - at east passenger elevator install new water diversion, Alt 1 (expand office, renovate bathroom and demo existing lobby and build new lobby).
11/07/2024 04:30 PM UTC
OFFICIAL NOTICE 103-1-2024
The general work requested is: CONSTRUCTION OF, PROJECT STAKING, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENTS, CONCRETE TRAFFIC ISLAND, VARIABLE THICKNESS CONCRETE BASE, CONCRETE CURB AND GUTTER, 5” AND 7” CONCRETE WALKS, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, SIGNAGE AND SIGNAGE INSTALLATION, VARIOUS PAVEMENT MARKINGS, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, VARIOUS LANDSCAPING AND PLANTING, ETC.: TD05484211 – Burnham Park Traffic Safety Improvements Project @ Various Locations
10/25/2024 03:30 PM UTC
OFFICIAL NOTICE 112-1-2024
C/O Milwaukee Health Department (MHD) – Milwaukee Women’s Center, Indoor Air Quality (IAQ) Upgrades
10/23/2024 03:30 PM UTC
OFFICIAL NOTICE 94-1-2024
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; ST211050150 – South Robinson Avenue – East Ward Street to East Becher Street
10/22/2024 03:30 PM UTC
OFFICIAL NOTICE 106-1-2024
Milwaukee Police Department – Police Administration Building Service, ATS, & Paralleling Gear Upgrades
10/17/2024 03:30 PM UTC
OFFICIAL NOTICE 111-1-2024
C/O Milwaukee Health Department (MHD) – Salvation Army Emergency Lodge Indoor Air Quality (IAQ) Upgrades
10/16/2024 03:30 PM UTC
OFFICIAL NOTICE 74-1-2024
The general work requested is: CONSTRUCTION OF, 8” CONCRETE PAVEMENT, 8” HIGH EARLY STRENGHT CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS AND CRACKS, GRAVEL FILLING, PAVEMENT MARKINGS, SIGNAGE INSTALLATION, CONCRETE REMOVALS, SEWER WORK, WATER WORK, CUC AJUSTMENT, ELECTRICAL CONDUIT INSTALLATION, TREE CLEARING & GRUBBING, TOPSOILING AND SODDING, ETC.; Located at: ST211230124 - North Prospect Avenue – East Knapp Street to East Ivanhoe Place ST211230140 - North Water Street – East Brady Street to North Humboldt Avenue
10/15/2024 03:30 PM UTC
OFFICIAL NOTICE 110-1-2024
200 Lead Service Line Replacements
10/14/2024 03:30 PM UTC
OFFICIAL NOTICE 98-1-2024
2nd and Plankinton Parking Structure Renovation 2nd and Plankinton parking structure renovation - at east passenger elevator install new water diversion, Alt 1 (expand office, renovate bathroom and demo existing lobby and build new lobby).
10/10/2024 03:30 PM UTC
OFFICIAL NOTICE 81-1-2024
The general work requested is: CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS AND CRACKS, GRAVEL FILLING, CRUSH GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER WORK, CUC AJUSTMENT, TREE CLEARING & GRUBBING, TOPSOILING AND SODDING, ETC.; Located at: ST211210223 – In South 37th Street from West Becher Street to West Burnham Street
10/08/2024 03:30 PM UTC
211 - 220 of 1608 Solicitations
1 2 18 19 20 22 24 25 26 160 161