General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 65-1-2026
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.;
07/14/2026 03:30 PM UTC
OFFICIAL NOTICE 16-1-2026
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, ETC. Located at: ST216250107 – E. Hartford Ave. – N. Downer Ave. to N. Oakland Ave.
07/22/2026 03:30 PM UTC
OFFICIAL NOTICE 53-1-2026
Police Administration Building (PAB) Parking Garage Repairs Phase 2
07/27/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/05/2026 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2022
Rehabilitation of South 35th Street Viaduct over Pierce Street
06/23/2022 03:30 PM UTC
OFFICIAL NOTICE 64-1-2022
CONSTRUCTION OF 5” CONCRETE WALK, CONCRETE WALK WITH INTEGRAL CURB, 7” CONCRETE DRIVEWAY, HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , OTHER REMOVALS, ETC.; Located at: ST230220165 – Area Wide Walk Replacement for Area Bounded By (ABB) ST216220106 - ADA Ramps for Area Wide Walk for Area Bounded By (ABB): ABB: N. Downer Ave., E Belleview Pl., N. Lake Dr. and E. Park Pl. ABB: W. Historic Mitchell St., S. 7th St., W. Windlake Ave. and S. 11th St.
06/21/2022 03:30 PM UTC
OFFICIAL NOTICE 82-1-2022
Installation of pavement markings, colored pavement markings, and flexible delineators to address pedestrian, bicyclist, and motor vehicle traffic safety concerns.
06/17/2022 03:30 PM UTC
OFFICIAL NOTICE 81-1-2022
WITKOWIAK PARK SURFACING – SYNTHETIC TURF & POROUS PAVEMENT Located at: 1656 South 4th Street, Milwaukee, WI 53204 PROJECT NO. 81-1-2022: Synthetic Turf Athletic Field & Playground Surfacing
06/16/2022 03:30 PM UTC
OFFICIAL NOTICE 81-2-2022
WITKOWIAK PARK SURFACING – SYNTHETIC TURF & POROUS PAVEMENT Located at: 1656 South 4th Street, Milwaukee, WI 53204 PROJECT NO. 81-2-2022: Flexible Porous Pavement Pathways & Courts
06/16/2022 03:30 PM UTC
OFFICIAL NOTICE 74-1-2022
VICTORY OVER VIOLENCE PARK 2615 N Dr. Martin Luther King Jr. Dr. Milwaukee, WI 53212
06/15/2022 03:30 PM UTC
OFFICIAL NOTICE 72-1-2022
THE REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHING UNITS (APPROXIMATELY 1000 LIGHTING UNITS) PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, ETC.; Located at: WK52350107 – Public Safety Lighting Improvements @ Various Locations (City Wide)
06/14/2022 03:30 PM UTC
OFFICIAL NOTICE 75-1-2022
COMBINED SEWER MAIN RELAY in: Located at: E. & W. Ring St. – N. Achilles St. to N. 2nd St. N. Achilles St. – E. Burleigh St. to E. Concordia Ave. E. Auer Ave. – N. Achilles St. to N. Bluhms Pl.
06/10/2022 03:30 PM UTC
OFFICIAL NOTICE 53-1-2022
SAFE ROUTES TO SCHOOL IMPLEMENTATION PHASE I
06/07/2022 03:30 PM UTC
OFFICIAL NOTICE 73-1-2022
CONSTRUCTION, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, 5” CONCRETE WALK, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, PERMEABLE PAVER BLOCKS, , GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, ETC.; Located at: ST211120114 – West Ruby Avenue – North 36th Street to North Sherman Boulevard
06/03/2022 03:30 PM UTC
451 - 460 of 1593 Solicitations
1 2 42 43 44 46 48 49 50 159 160