General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2026
Northwest Garage & DPW Field Headquarters – Air Handling Unit Replacement The project involves two different project sites. At the DPW Field Headquarters an existing rooftop unit will be removed and replaced with a new rooftop unit. At the Northwest Garage an existing air handling unit, energy recovery unit, and associated VAV boxes will be removed and replaced with a new rooftop unit, new VAV boxes, and new energy recovery unit. Both locations include controls improvements. There is mechanical, structural, and controls scope (NIC).
09/17/2026 03:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 9-1-2021
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216210108 – High Impact Project Locations South 14th Street – West Parnell Avenue to West Ramsey Avenue South 68th Street – West Forest Home Avenue to West Oklahoma Avenue South Clement Avenue – East Morgan Avenue to East Oklahoma Avenue South Griffin Avenue – East Armour Avenue to East Bolivar Avenue West Rosedale Avenue – South Chase Avenue to South 6th Street
04/01/2021 03:30 PM UTC
OFFICIAL NOTICE 8-1-2021
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216210107 – High Impact Project Locations North Astor Street – East State Street to East Ogden Avenue East Hartford Avenue – North Lake Drive to North Downer Avenue North Vel R. Phillips Avenue – West Walnut Street to West North Avenue North 38th Street – West Villard Avenue to West Silver Spring Drive North Hackett Avenue – East Locust Street to East Kenwood Boulevard North Prospect Avenue – East Mason Street to East Kilbourn Avenue North Prospect Avenue – East Royal Place to East Kane Place West Mt. Vernon Avenue – North 63rd Street to North 68th Street West Stevenson Street – North 69th Street to North 76th Street West Wisconsin Avenue – (Near North 2nd Street not completed)
03/31/2021 03:30 PM UTC
OFFICIAL NOTICE 40-1-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: Project 1: CITY-OWNED LOT AREA 1A, BOUNDED BY: Capitol Drive to north City limits and Sherman Boulevard to west City limits
03/31/2021 03:30 PM UTC
OFFICIAL NOTICE 14-1-2021
COMBINED SEWER MAIN RELAY AND LINING Located at: S. 7th St. – W. Orchard St. to W. Lapham Blvd. S. 10th St. – W. Dakota St. to W. Manitoba St. W. Orchard St. – S. 12th St. to S. Cesar Chavez Dr.
03/30/2021 03:30 PM UTC
OFFICIAL NOTICE 14-2-2021
STORM SEWER MAIN RELAY in: N. 58th St. – 140’+/- NW. of W. Roosevelt Dr. to W. Philip Pl. N. 60th St. – 275’+/- S. of W. Philip Pl. to W. Philip Pl. N. Hopkins St. – W. Hampton Ave. to W. Stark St. W. Ruby Ave. – N. 42nd St. to N. Sherman Blvd.
03/30/2021 03:30 PM UTC
OFFICIAL NOTICE 14-3-2021
SANITARY MANHOLE AND SEWER STRUCTURES INSPECTIONS IN: Various Locations
03/30/2021 03:30 PM UTC
OFFICIAL NOTICE 5-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 8” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216210104 – ADA RAMPS FOR 2021 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (SOUTHSIDE PROJECTS)
03/25/2021 03:30 PM UTC
OFFICIAL NOTICE 33-1-2021
CITY OWNED LOT LANDSCAPE MAINTENANCE IN THE FOLLOWING LOCATIONS: Project 1: CITY-OWNED LOT AREA 1A, BOUNDED BY: Capitol Drive to north City limits and Sherman Boulevard to west City limits
03/24/2021 03:30 PM UTC
OFFICIAL NOTICE 18-1-2021
The Rehabilitation of The West Cameron Avenue Bridge Over Lincoln Creek
03/23/2021 03:30 PM UTC
OFFICIAL NOTICE 24-1-2021
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE AND/OR CONCRETE DRIVEWAYS, 5” CONCRETE WALK, VARIABLE THICKNESS CRUSHED STONE BASE, SEALING PAVEMENT JOINTS AND CRACKS, PERMEABLE PAVERS, STONE BEDDING, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following alleys bounded by (BB): ST212140134 – Alley BB: West Arthur Avenue, West Harrison Avenue, South 65th Street, to South 66th Street ST212010135 – Alley BB: West Historic Mitchell Street, West Lapham Boulevard, South 8th Street, to South 9th Street ST212020121 – Alley BB: West Euclid Avenue, West Ohio Avenue, South 24th Street, to South 25th Street
03/19/2021 03:30 PM UTC
611 - 620 of 1608 Solicitations
1 2 58 59 60 62 64 65 66 160 161