General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 65-1-2026
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.;
07/14/2026 03:30 PM UTC
OFFICIAL NOTICE 16-1-2026
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, ETC. Located at: ST216250107 – E. Hartford Ave. – N. Downer Ave. to N. Oakland Ave.
07/22/2026 03:30 PM UTC
OFFICIAL NOTICE 53-1-2026
Police Administration Building (PAB) Parking Garage Repairs Phase 2
07/27/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/05/2026 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 29-1-2026
SOUTH 16TH STREET BRIDGE OVER KINNICKINNIC RIVER REPAIRS.
02/24/2026 04:30 PM UTC
OFFICIAL NOTICE 23-1-2026
WATER MAIN RELAYS Located At: W. Martin Ln. (Wt410240604), S. 3rd St. To S. 4th St. (7 Working Days); W. Bottsford Av. (Wt410240605), S. 3rd St. To S. 5th St. (13 Working Days); W. Allerton Av. (Wt410240606), S. 3rd St. To S. 5th St. (14 Working Days); S. 5th St. (Wt410240607) W. Bottsford Ave. To W. Armour Ave. (18 Working Days); N. 13th St. (Wt410240619) W. Keefe Ave. To W. Atkinson Ave. (61 Working Days); W. Nash St. (Wt410240620) N. 13th St. To N. 14th St. (6 Working Days); W. Fiebrantz Ave. (Wt410240624) N. 67th St. To N. 70th St. (16 Working Days); N. 68th St. (Wt410240625) W. Fiebrantz Ave. To W. Hope Ave. (15 Working Days); E. Hadley St. (Wt410240633) N. Fratney St. To N. Pierce St. (11 Working Days); E. Auer Ave. (Wt410240634), N. Richards St. To N. Booth St. (16 Working Days); W. National Ave. (Wt410250752) S. Layton Blvd. To S. 39th St. (19 Working Days). (Note: Contractor to furnish and install approximately 9,302 lin. ft. of 16”, 12”, 8” 6”, and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/20/2026 04:30 PM UTC
OFFICIAL NOTICE 1-1-2026
PROJECT NO. 1: SANITARY SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING: S. Adams Ave. - E. Bolivar Ave. to E. Armour Ave. S. Burrell St. - E. Van Norman Ave to E. Armour Ave. S. Griffin Ave. - E. Van Norman Ave. to E. Armour Ave. S. Jasper Ave. - E. Van Norman Ave. to E. Armour Ave. S. Quincy Ave. - 625' S. of E. Bolivar Ave. to E. Armour Ave.
02/18/2026 04:30 PM UTC
OFFICIAL NOTICE 1-2-2026
PROJECT NO. 2: SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING S. 13th St. – 300’+/- S. of W. Edgerton Ave. to 250’+/- S. of W. Goldcrest Ave.
02/18/2026 04:30 PM UTC
OFFICIAL NOTICE 22-1-2026
WATER MAIN RELAYS Located at: W. Thurston Av. (WT410230685), N. 62nd St. to N. 64th St. (16 working days); N. 63rd St. (WT410230686), W. Thurston Av. to 330’ N/O W. Thurston Av. (7 working days); W. Carmen Av. (WT410230687), N. 60th St. to N. 62nd St. (16 working days); W. Carmen Av. (WT410230688) N. 65TH St. to N. 68th St. (20 working days); N. 66th St. (WT410230689) W. Carmen Av. to W. Bobolink Av. (11 working days); N. 67th St. (WT410230690) W. Carmen Av. to W. Bobolink Av. (13 working days); W. Bobolink Av. (WT410230691) N. 65th St. to N. 68th St. (12 working days); W. Carmen Av. (WT410230692) N. 76th St. to N. 80th St. (19 working days); N. 79th St. (WT410230693) W. Silver Spring Dr. to W. Carmen Av. (24 working days); W. Thurston Av. (WT410230694), N. 80th St. to W. Carmen Av. (22 working days); N. 82nd Ct. (WT410230695) 165’ NE/O W. Thurston Av. to W. Thurston Av. (5 working days). (Note: Contractor to furnish and install approximately 9,302 lin. ft. of 16”, 12”, 8” 6”, and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/13/2026 04:30 PM UTC
OFFICIAL NOTICE 27-1-2026
STORM SEWER MAIN RELAY IN: SE-2785 (N. of W. Lolita Ave.) – N. 99th St. to 125’ of N. 99th St.
02/12/2026 04:30 PM UTC
OFFICIAL NOTICE 28-1-2026
PROJECT NO. 1: 2026 SANITARY BYPASS PUMP REHABILITATION Located at: VARIOUS LOCATIONS
02/11/2026 04:30 PM UTC
OFFICIAL NOTICE 21-1-2026
WATER MAIN RELAYS located at: W. Norwich St. (WT410230630), 200’ E/O S. 80th St. to S. 80th St. (4 working days); S. 80th St. (WT410230631), W. Van Beck Av. To W. Norwich St. (5 working days); W. Van Beck St. (WT410230632), 180’ E/O S. 80th St. to S. 80th St. (5 working days); W. Eden Ct. (WT410230649), S. Massachusetts Av. To 145’ W/O S. Massachusetts Av. (5 working days); S. Massachusetts Av. (WT410230650), W. Morgan Av. To W. Warnimont Av. (12 working days); W. Eden Pl. (WT410230651), W. Warnimont Av. To S. Massachusetts Av. (10 working days); S. 71st St. (WT410230652), S. Sunset Dr. to S. Massachusetts Av. (21 working days);, W. Wilbur Ct. (WT410230653), S. 71st St. to 140’ W/O S. 71st St. (6 working days); W. Howard Av. (WT410230678), S. 68th St. to 125’ W/O S. 69th St. (8 working days); S. 69th St. (WT410230679), W. Howard Av. to 255’ S/O W. Howard Av. (7 working days); S. Herman St. (WT410220628), E. Saveland Av. to E. Howard Av. (19 working days); W. Howard Av. (WT410250777), 235’ E/O S. Miner St. to 125’ E/O S. Miner St. (20 working days). (Note: Contractor to furnish and install approximately 5,419 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/05/2026 04:30 PM UTC
OFFICIAL NOTICE 9-1-2026
2026 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
01/23/2026 04:30 PM UTC
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
01/06/2026 04:30 PM UTC
61 - 70 of 1593 Solicitations
1 2 3 4 5 7 9 10 11 159 160