General Info

Business Logo

City of Whitehall

360 S Yearling Rd, Whitehall, OH 43213-1822
(614) 246-7853


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
East Broad Street Reconstruction, Phase 4
The work for which bids are being accepted consists of approximately 10,100 square yards of full depth arterial roadway reconstruction, including full curb replacement, sidewalk replacement, multi-use path installation, streeting lighting improvements, storm sewer upgrades, and other related work. Bid Opening will be conducted virtually via Microsoft Teams Link: https://teams.microsoft.com/meet/247947162961358?p=At5vNC7zuaqPfZOvAX
05/22/2026 02:00 PM UTC
2026 Whitehall Street Program
The work for which bids are being accepted consists of approximately 9,300 square yards of full depth residential pavement reconstruction, 6,600 linear feet of continuous curb and gutter replacement and other related work. Additionally, the work consists of parking lot improvements which include approximately 4,100 square yards of pavement resurfacing, 1,300 square yards of full depth repair and various drainage improvements. Bid Opening will be conducted virtually via Microsoft Teams Link: https://teams.microsoft.com/meet/21128501761233?p=5gi6PLDM6OIL4PLRkH
04/10/2026 02:00 PM UTC
Whitehall 2026 Water Main Improvements
The work is comprised of improvements in three separate areas in Whitehall, Ohio on Duchene/Norton Lane, Fairway Circle, and Etna Road. The scope of work includes approximately 3800 lineal feet of 8-in water main installation, as well as a variety related work, including sidewalk, curb & gutter, roadway resurfacing, and restoration.
03/06/2026 03:00 PM UTC
2025-04 Whitehall Police Station Shower Renovation
Project consists of demoing the existing basement restrooms, the addition of EF-3 and ductwork serving the lower level restrooms, replacement of all plumbing fixtures in the new shower rooms in the basement, rework plumbing in the basement shower rooms to include the new showers, add new water heater and recirculating pump to the basement mechanical room, and connect all new equipment to the BAS system.
09/22/2025 05:00 PM UTC
2025-04 Whitehall Police Station Piping Replacement
Project consists of demo and replacement of existing hot and chilled water throughout the building. 1. Piping to remain includes: a. Piping running over the gun range b. Piping running below stairs c. Piping in floor slab d. Piping serving the North addition running through Corridor 006. Demo and replace existing fan coil units. e. Fan coil 6, 7 and 8 will be replaced as Alternate 2. The project also includes the addition of AHU-2 serving the weight room, addition of EF-3 and ductwork serving the lower level restrooms, the replacement of cabinet unit heaters in the stairs, adding sensors to old garage and radio equipment room to monitor thru the BAS, adding FCU-5 and associated piping to women’s locker room, replacement of all plumbing fixtures in the new shower rooms in the basement, rework plumbing in the basement shower rooms to include the new showers, add new water heater and recirculating pump to the basement mechanical room, and connect all new equipment to the BAS system.
06/10/2025 02:00 PM UTC
2023-07 Whitehall Municipal Building Exterior Renovation
This project includes the removal and replacement of the existing steel posts along the perimeter of the building, miscellaneous concrete repair work to the elevated slab and slab edges, landscape improvements, the removal of the existing ADA ramp at the rear of the property, the replacement of the existing monumental entrance stairs and the addition of an ADA ramp at the front of the building. All work is to be completed under a General Contract. The completion date for all work under this project is December 1, 2025.
05/09/2025 02:00 PM UTC
6 Solicitations