General Info

Business Logo

Solicitations and notifications are free for this business.

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)

One Ashburton Place 15th Floor, Boston, MA 02108
(617) 727-4003

The Division of Capital Asset Management and Maintenance (DCAMM), an agency within the Executive Office for Administration and Finance (A&F) is responsible for capital planning, major public building construction, facilities management, and real estate services for the Commonwealth of Massachusetts. The agency was created by the legislature in 1980 to promote quality and integrity in the management and construction of the Commonwealth’s capital facilities and real estate assets.

Standard Documents

Name * Description
DCAMM E-Bid Room Information (27.3 KB)
DCAMM E-Bid Room Information, Verification, Registration and Security Requirements
1 Document

Upcoming Solicitations

Number Deadline
MMP 9
Mechanical and Plumbing Preventive Maintenance Contract, Massachusetts Information Technology Center, Chelsea, MA. This Project is to provide a Preventive Maintenance Service Contract to include testing, inspection, preventive maintenance (including all PM required parts and materials), repairs and requested emergency services and incidental extra services for all Mechanical Equipment and Plumbing Equipment. The Category of Work is Mechanical Systems OR HVAC.
05/17/2024 06:00 PM UTC
MMP 10
Mechanical & Plumbing Preventive Maintenance and Control Center Monitoring for Certain State Buildings in Boston, Salem and Lowell, MA. This Project is to provide a Preventive Maintenance Service Contract to include testing, inspection, preventive maintenance (including all PM required parts and materials), repairs and requested emergency services and incidental extra services for all Mechanical Equipment and Plumbing Equipment. Contract will include the following seven locations, including Monitoring Services of the Control Center in the McCormack Building: Massachusetts State House, John W. McCormack Building, Charles F. Hurley Building, Erich V. Lindemann Mental Health Center, Lowell Superior Courthouse, Lowell District Court, Salem Superior Courthouse/County Commissioners Building. The Category of Work is Mechanical Systems OR HVAC.
05/22/2024 06:00 PM UTC
RCC2301 Sub bids
Roxbury Community College Dudley House Exterior, Boston (Roxbury), MA. This Project is for renovation of the exterior of Dudley House, including siding and trim, insulation, windows, roofing, ornamental railings, rebuilt porches and stairs. The Project also includes structural upgrades and a small addition to house a future stair. This Project also includes the following Filed Sub-Bids: Masonry; Miscellaneous & Ornamental Iron; Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Painting. The Category of Work is General Building Construction.
05/23/2024 04:00 PM UTC
RCC2301
Roxbury Community College Dudley House Exterior, Boston (Roxbury), MA. This Project is for renovation of the exterior of Dudley House, including siding and trim, insulation, windows, roofing, ornamental railings, rebuilt porches and stairs. The Project also includes structural upgrades and a small addition to house a future stair. This Project also includes the following Filed Sub-Bids: Masonry; Miscellaneous & Ornamental Iron; Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Painting. The Category of Work is General Building Construction.
06/06/2024 06:00 PM UTC
BSB2005
Request for Proposals - State House Backup Chiller Replacement, Boston, MA. This Project is for upgrades to the chilled water plant; upgrades to the chillers and condensing units serving the archives (vault); replacement of insulation on piping in the “Coal Pocket” and adjacent tunnel, and installation of change over valves. The Category of Work is HVAC. Pursuant to Massachusetts General Laws Chapter 149, Sections 44A and 44E1/2, as amended, the Commonwealth of Massachusetts, Division of Capital Asset Management and Maintenance requests Proposals from qualified firms for services to be performed on the Historic Massachusetts State House located on Beacon Hill in Boston, Massachusetts. Proposals must specifically identify certain of the subcontractors that the offeror proposes to use on this project as required by this Request for Proposals (RFP) and of those subcontractors identified must meet the experience requirements set forth in the RFP.
06/07/2024 06:00 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
RCC1402 HC1 - Public Posting
Roxbury Community College, Reggie Lewis Track Upgrades - Phase 2, Roxbury, MA. This project includes renovation work at the Reggie Lewis Center to include front doors replacement, mechanical, code, accessibility upgrades, and other miscellaneous improvements.
06/22/2017 06:00 PM UTC
MBC1601 HC1 - Public Posting
Mass. Bay Community College, Carey Building HVAC Upgrades, Wellesley, MA. This project includes installation of new air conditioning for the Carey Building's 3rd and 4th floors.
06/20/2017 06:00 PM UTC
CHE1501 HC1 - Public Posting
Chelsea Soldiers' Home - Envelope Repair, Chelsea, MA. This project includes masonry repair and roofing at eight buildings.
06/16/2017 06:00 PM UTC
DPH1641 DC1
Request for Qualifications for Construction Management at Risk Services, Second Request - Revised Scope, Mass. Department of Public Health, Jamaica Plain Campus, Tower Building Phased Renovation and Biologics Building Demolition, Boston, MA. The project involves a phased renovation of an approximately 208,000 GSF, eight-story plus basement building that contains laboratory, administrative and research space. The building will remain occupied throughout construction and remain 24/7/365 operational. The project also includes the demolition of the Biologics Building, which sits adjacent to the Tower Building and is connected to it via a bridge. This is a two-story plus basement building of approximately 34,000 GSF.
05/31/2017 06:00 PM UTC
DCP1514 HC1 - Public Posting
Bryan Building - Mothball and Utility Separation, Worcester, MA. Bryan Building will be warm mothballed. This entails the separation of utilities, boarding up windows, abatement of ACM, removal of hazardous materials, removal of furniture, improvements to HVAC system, demolition of connector to adjacent building, and installation of boiler. Utility separation work includes coordination with NGRID, trenching, new ductbanks, and site restoration.
05/15/2017 06:00 PM UTC
SDW1501 DC2 - Public Posting
New Intake Site Preparation and Roadway, Worcester County Jail & House of Corrections, West Boylston, MA. This project includes installation of a new security fencing system and removal of the old fencing, new gates, road work to expand the existing access road to the site, rework of the facilities main pedestrian pathway and site preparation for the New Intake and Medical building to be completed under a subsequent contract. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
05/10/2017 06:00 PM UTC
DMH1301 DC1
Exterior Envelope Repair, Elevator and Generator Replacement, Solomon Carter Fuller Mental Health Facility, Boston, MA. Scope: Concrete exterior envelope repairs, existing window repairs and exterior sealant scope throughout; replacement (in phases) of the existing elevators with new elevators; replacement of the existing emergency generator with a new emergency generator.
04/20/2017 06:00 PM UTC
STC1701 FC1
Springfield Technical Community College, Building 13 and 17 Generator Replacement, Springfield, MA. Scope: Demolition of the existing generator and the gas main feeding it, installation of a new diesel generator with exhaust stack rising up from the building, creation of a new emergency electrical service entrance in buildings 13 and 17 and creation of new electrical shafts and electrical rooms in buildings 13 and 17.
04/14/2017 06:00 PM UTC
TRC0105 DC1
Request for Qualifications for Trade Contractors, Lowell Justice Center, Lowell, MA, for the following trades: Miscellaneous and Ornamental Iron (ECC $2,399,253); Waterproofing, Dampproofing and Caulking (ECC $134,000); Glass and Glazing (ECC $974,990); Lathing and Plastering (ECC $55,544); Tile (ECC $3,209,623); Acoustical Tile (ECC $2,630,885); Resilient Floors (ECC $428,174); Painting (ECC $885,144). SCOPE: The project consists of a new 266,523 GSF seven-story high rise structure (plus basement & mechanical penthouse) and associated site development of a 3.26 acre site.
04/13/2017 04:00 PM UTC
BSB1503 HC1
Request for Proposals for State House - Senate Chamber Renovations, Boston, MA
04/12/2017 06:00 PM UTC
261 - 270 of 303 Solicitations
1 2 23 24 25 27 29 30 31