General Info

Business Logo

Nathan L. Jacobson & Associates, Inc.

86 Main Street, Chester, CT 06412
(860) 526-9591


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Bridge Road Sidewalks, Haddam, Connecticut
The project primarily consists of sidewalk, sight lighting, a retaining wall, and storm drainage construction.
12/01/2021 02:00 PM UTC
Beaver Meadow Road Culvert Replacement, Haddam, CT
The Project generally consists of a culvert replacement with associated road work, drainage and site restoration.
12/08/2021 03:00 PM UTC
Pickett Lane over Herzig Brook
The Project primarily consists of replacing a single corrugated metal pipe culvert with a single precast concrete rigid frame.
12/21/2021 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
Maintenance Dredging of Chester Creek, Chester, CT
The Project primarily consists of dredging material to -6 MLW plus 1 foot allowable over dredge depth over a 500 (+/-)-foot-long by 50-foot-wide project area at the mouth of Chester Creek and disposing of material to a disposal area north of and adjacent to the dredging area.
11/12/2021 03:00 PM UTC
Haddam Center Sidewalks, Haddam, Connecticut
The Project includes concrete sidewalk installation, paving, installation of rectangular rapid flashing beacons, and site restoration.
10/27/2021 02:00 PM UTC
Bridge Road Sidewalks, Haddam, Connecticut
The project primarily consists of sidewalk, sight lighting, a retaining wall, and storm drainage construction.
10/27/2021 01:00 PM UTC
Haddam Center Sidewalks, Haddam, Connecticut
The Project includes concrete sidewalk installation, paving, installation of rectangular rapid flashing beacons, historic markers and site restoration.
05/24/2021 02:00 PM UTC
Sidewalk Improvements, Portland, CT
Project primarily consists of the replacement of concrete sidewalks, curbing and driveway aprons along with pavement repair and site restoration.
04/28/2021 03:00 PM UTC
North Parker Road Culvert Replacement, Marlborough, CT
The Project primarily consists of installing a precast concrete box culvert and wingwalls (furnished by the Town) and roadway construction.
04/01/2021 02:00 PM UTC
Ingham Hill Road Trail Head Parking, Old Saybrook, CT
The Project primarily consists of construction of a 13-vehicle parking area, including erosion control, grading, minor paving, timber guide rail and restoration.
03/26/2021 06:00 PM UTC
South Main Street Guiderail Replacement, Marlborough, CT
Project primarily consists of installation of approximately 600 feet of guiderail.
03/24/2021 02:00 PM UTC
Trail Bridge Substructure for Raymond Brook Preserve Phase II Trails
The Project primarily consists of concrete abutments and wingwalls to be constructed in the summer of 2021, for the subsequent construction by others of a trail bridge superstructure thereupon.
02/05/2021 03:00 PM UTC
Protective Screen for Bridge 04749, Nehantic Trail #2 Over Mud Creek, Old Saybrook, CT
The Project primarily consists of installation of approximately 190 total linear feet of 9 ft. tall white MADOT Type 1 Protective Screen with curved top, on the existing bridge rail system.
12/30/2020 03:00 PM UTC
1 - 10 of 22 Solicitations
← Previous 1 3