General Info

Business Logo

Solicitations and notifications are free for this business.

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)

One Ashburton Place 15th Floor, Boston, MA 02108
(617) 727-4003

The Division of Capital Asset Management and Maintenance (DCAMM), an agency within the Executive Office for Administration and Finance (A&F) is responsible for capital planning, major public building construction, facilities management, and real estate services for the Commonwealth of Massachusetts. The agency was created by the legislature in 1980 to promote quality and integrity in the management and construction of the Commonwealth’s capital facilities and real estate assets.

Standard Documents

Name * Description
DCAMM E-Bid Room Information (27.3 KB)
DCAMM E-Bid Room Information, Verification, Registration and Security Requirements
1 Document

Upcoming Solicitations

Number Deadline
DCP2515
DCP - Monson Campus - Buildings 7 & 8 - Deconstruction & Demolition, Monson, MA. This Project consists of a comparative case study for the deconstruction of Building 7 - Hillside Ward and the demolition of Building 8 - Hampden Ward on the campus of Monson State Hospital. Abatement of hazardous materials is required in both structures prior to deconstruction or demolition activities. Slate roofs on both structures will be addressed under (2) separate Non-Traditional Work Plans. The Category of Work is General Building Construction OR Demolition.
07/02/2026 06:00 PM UTC
SDP2301 Phase 2
Plymouth County Sheriff Roof Replacement - Phase 2, Plymouth, MA. The project is the second phase roof replacement of the SDP Plymouth County Sheriff Department building. The areas to be reroofed comprise approximately 68,000 square feet out of the entire approximate 170,000 square foot roof. The new roof assembly will consist of vapor retarder, two layers of insulation (R-30 minimum), cover board, and PVC roof membrane. This Project includes the following Filed Sub-Bids: Miscellaneous & Ornamental Iron; Plumbing; HVAC; Electrical. The Category of Work is Roofing. Please see the SSI Attachment: Confidentiality Agreement. This Form MUST be completed and submitted to DCAMM’s Bid Room at bidroom.dcamm@mass.gov for access to bid documents.
07/07/2026 06:00 PM UTC
HCC2301 Trade RFQ
HCC2301 - Request for Qualifications for Ten (10) Trade Contractor Packages: Metal Windows; Glass & Glazing; Tile; Acoustical Tile; Resilient Floors; Painting; Fire Protection Sprinkler System; Plumbing; HVAC; Electrical, for HCC – Holyoke Community College, Marieb Hall Renovations, Holyoke, MA. This Project is to renovate approximately 8,500 GSF in a cast-in-place concrete building built in 1971 that primarily houses classrooms, teaching laboratories, offices, and student study and meeting areas.
07/08/2026 04:00 PM UTC
MMP 41
Fire Alarm and Fire Protection Maintenance Services for the Charles F. Hurley Building, Boston, MA. This Project is to secure the services of an experienced and qualified firm to provide testing, inspection, preventive maintenance, repair, replacement and emergency services for all Fire Alarm Systems and Equipment and Fire Protection Systems and Equipment in the Hurley Building. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
07/09/2026 06:00 PM UTC
DYS2201 Trade RFB
DYS Taunton - Southeast Regional Youth Service Center, Taunton, MA. Trade Bids for the following Trade Categories: Masonry; Miscellaneous and Ornamental Iron; Waterproofing, Dampproofing, and Caulking; Roofing and Flashing; Metal Windows; Glass and Glazing; Tile; Acoustical Tile; Resilient Floors; Painting; Fire Protection Sprinkler Systems; Plumbing; HVAC; Electrical.
07/10/2026 04:00 PM UTC
TRC1903 Trade RFQ
TRC1903 Request for Qualifications for Fifteen (15) Trade Contractor packages: Masonry; Miscellaneous and Ornamental Iron; Waterproofing, Damp-proofing and Caulking; Roofing and Flashing; Glass and Glazing; Tile; Acoustical Tile; Resilient Floors; Terrazzo; Painting; Elevators; Fire Protection Sprinkler System; Plumbing; HVAC & Electrical for the Quincy Trial Court with a new state-of-the-art judicial facility, housing the District Court, Juvenile Court, and Housing Court.
07/13/2026 04:00 PM UTC
STC2202 Glass & Glazing Trade RFB
Springfield Technical Community College – School of Health and Patient Simulation (SHPS) Modernization, Springfield, MA. Trade Bid for the following Trade Category: Glass & Glazing.
07/14/2026 04:00 PM UTC
MMP 42
Mechanical and Plumbing Preventive Maintenance Contract, Springfield Data Center, Springfield, MA. Includes all Mechanical and Plumbing Equipment specified in the Bid Documents. Includes testing, inspection, preventive maintenance (including all PM required parts and materials), repairs, requested emergency services and incidental extra services for all mechanical and plumbing equipment. Must be licensed as a Mechanical, Refrigeration and Plumbing Contractor in Massachusetts and meet the qualifications specified in the Bid Documents. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
07/22/2026 06:00 PM UTC
DOC2503
DOC – DOC Headquarters – Roof Replacement, 50 Maple Street, Milford, MA. The Project work consists of replacement of the roof assembly at the Department of Correction Headquarters. Work includes removal of existing ballasted EPDM roof assembly and replacement with EPDM membrane or thermoplastic membrane for the office tower, warehouse and connector totaling approximately 164,000 square feet. The Category of Work is Roofing.
07/24/2026 06:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
MIL1602 FC1
Hudson Armory Roof Replacement, Hudson, MA. This project includes the replacement of "barrel shaped" roof at the Hudson Armory and associated gutters.
07/26/2017 06:00 PM UTC
HCC1502 HC1 - Public Posting
New Center for Life Sciences - Holyoke Community College, Marieb Hall, Holyoke, MA. This project includes various renovations to the Marieb Hall in order to provide life science program spaces.
07/06/2017 06:00 PM UTC
DPH1402 HC1
Lemuel Shattuck Hospital – Personnel Building Demolition, Jamaica Plain, MA. This project includes abatement, demolition and backfilling of an eleven-story brick and concrete building. Work will be conducted within an active parking lot of an occupied hospital. The Category of Work is Demolition.
07/05/2017 06:00 PM UTC
DCP1714 FC1 - Public Posting
Satellite Boiler Installation, DCAMM Facility, 220 Old Common Road, Lancaster, MA. Scope: Install boiler and one standby generator in the RFK School Building.
06/23/2017 06:00 PM UTC
RCC1402 HC1 - Public Posting
Roxbury Community College, Reggie Lewis Track Upgrades - Phase 2, Roxbury, MA. This project includes renovation work at the Reggie Lewis Center to include front doors replacement, mechanical, code, accessibility upgrades, and other miscellaneous improvements.
06/22/2017 06:00 PM UTC
MBC1601 HC1 - Public Posting
Mass. Bay Community College, Carey Building HVAC Upgrades, Wellesley, MA. This project includes installation of new air conditioning for the Carey Building's 3rd and 4th floors.
06/20/2017 06:00 PM UTC
CHE1501 HC1 - Public Posting
Chelsea Soldiers' Home - Envelope Repair, Chelsea, MA. This project includes masonry repair and roofing at eight buildings.
06/16/2017 06:00 PM UTC
DPH1641 DC1
Request for Qualifications for Construction Management at Risk Services, Second Request - Revised Scope, Mass. Department of Public Health, Jamaica Plain Campus, Tower Building Phased Renovation and Biologics Building Demolition, Boston, MA. The project involves a phased renovation of an approximately 208,000 GSF, eight-story plus basement building that contains laboratory, administrative and research space. The building will remain occupied throughout construction and remain 24/7/365 operational. The project also includes the demolition of the Biologics Building, which sits adjacent to the Tower Building and is connected to it via a bridge. This is a two-story plus basement building of approximately 34,000 GSF.
05/31/2017 06:00 PM UTC
DCP1514 HC1 - Public Posting
Bryan Building - Mothball and Utility Separation, Worcester, MA. Bryan Building will be warm mothballed. This entails the separation of utilities, boarding up windows, abatement of ACM, removal of hazardous materials, removal of furniture, improvements to HVAC system, demolition of connector to adjacent building, and installation of boiler. Utility separation work includes coordination with NGRID, trenching, new ductbanks, and site restoration.
05/15/2017 06:00 PM UTC
SDW1501 DC2 - Public Posting
New Intake Site Preparation and Roadway, Worcester County Jail & House of Corrections, West Boylston, MA. This project includes installation of a new security fencing system and removal of the old fencing, new gates, road work to expand the existing access road to the site, rework of the facilities main pedestrian pathway and site preparation for the New Intake and Medical building to be completed under a subsequent contract. This Project bid in accordance with M.G.L. Chapter 30 Section 39M.
05/10/2017 06:00 PM UTC
401 - 410 of 447 Solicitations
1 2 37 38 39 41 43 44 45