Five Mile Road over Johnson Drain (C0116001)
9.58 ft span x 4.08 ft rise x 44 ft length Aluminum Box fabrication for the (C0116001) Five Mile Road to Johnson Drain Project.
01/30/2018 04:00 PM UTC
Tubbs Road Guardrail Replacement Project
Approximately 1200 feet east of Huron River Drive. Remove existing guardrail, install retaining wall and install new guardrail.
09/13/2017 03:00 PM UTC
Henzie Rd over Iron Creek
This contract is for the STREAM IMPROVEMENT portion of the culvert replacement project. The Washtenaw County Road Commission will be performing the work associated with the culvert replacement and road improvements. This project is located on Henzie Road in Section 27 of Manchester Township, Washtenaw County, MI.
09/12/2017 03:00 PM UTC
Henzie Rd over Iron Creek
Aluminum box culvert fabrication contract for a 16'-6" span x 6'-8" rise x 42'-2" length culvert at Henzie Rd over Iron Creek.
08/07/2017 03:00 PM UTC
Currie Road over Trib to Johnson Drain (C0114007)
18.17 ft span x 4.58 ft rise x 50 ft length Aluminum Box fabrication for the (C0114007) Currie Road over Tributary to Johnson Drain Project.
06/12/2017 03:00 PM UTC
2017 Traffic Calming Project
This project consists of installation of 37 concrete speed humps, pavement markings, and all other related work as set forth in the bid documents.
05/10/2017 03:00 PM UTC
Currie Road Over Tributary to Johnson Drain Project (C0114004)
12.58 ft span x 5.17 ft rise x 50 ft length Aluminum Box fabrication for the (C0114004) Currie Road over Tributary to Johnson Drain Project.
05/10/2017 03:00 PM UTC
Cherry Hill Road Aluminum Box Fabrication
10.5 ft span x 5.6 ft rise x 50 ft length Aluminum Box fabrication for the Cherry Hill Road over Parks Drain Project.
04/10/2017 03:00 PM UTC
Ann Arbor Technology Park
A Contract for 1.79 miles of HMA Surface Removal, Aggrgate Base Conditioning, HMA Paving, Concrete Curb and Gutter, Gravel Shoulder Work, Ditching and Pavement Markings.
03/31/2017 03:00 PM UTC
Mast Arm Traffic Signals on Jackson Road, Earhart Road, and Carpenter Road
Contract for upgrading pedestrian facilities including pedestrian signals and ramps at Jackson Road and Zeeb Road intersection (Scio Township, Section 21 & 22), new mast arm traffic signals on Jackson Road at Parkland Plaza and at Auto Mall Drive intersections (Scio Township, Section 23), new mast arm traffic signal on Earhart Road at Whitehall Drive intersection (Ann Arbor Township, Section 13), and new mast arm traffic signal on Carpenter Road approximately 2250 feet south of Packard Road (Pittsfield Township, Section 11 & 12).