General Info

Business Logo

Washtenaw County Road Commission

555 N. Zeeb Rd, Ann Arbor, MI 48103
(734) 761-1500


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2506 01
Warren Road Over Fleming Creek Culvert Replacement
07/08/2025 02:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
2102 01
This project consists of county wide guardrail upgrades per current standards at the following locations: 1. Clark Rd 90 ft West of River St; 2. Sibley Rd 850 ft East of Bush Rd; 3. Wagner Rd 500 Ft South of Miller Rd; 4. Geddes Rd 1000 ft East of Dixboro Rd; 5. Geddes Rd 1200 ft West of Superior Rd. The Engineer may, at any time during the progress of the contract, order extra work and locations. The Engineer will provide the Contractor with a list stating the location, material, and quantity of the extra work the Contractor is to perform. Some bid items are for future projects, which contain estimated quantities.
03/10/2021 04:00 PM UTC
2101 01
Tree Cutting, Removal and Clearing in Scio, Lodi and York Townships.
02/02/2021 04:00 PM UTC
2012 01
HMA Resurfacing Program
01/26/2021 02:30 PM UTC
2004 001
2020 Annual Supply of Sign Materials - Roll Material, Prefabricated Reflectorized Sign Faces on Flat Aluminum Sign Blanks, and Aluminum Sign Blanks.
05/13/2020 02:00 PM UTC
2002 001
2020 Countywide Longline Pavement Markings Program
03/11/2020 02:00 PM UTC
2002 002
2020 Special Pavement Markings Project
03/11/2020 02:00 PM UTC
1911 001
Tree Cutting, Removal and Clearing in Scio, Lodi and Salem Townships.
12/12/2019 04:00 PM UTC
1910 001
Old US 12 Road over the Letts Creek Culvert Replacement
11/21/2019 04:00 PM UTC
1908 001
Ann Arbor-Saline Rd at Wagner Rd Intersection Improvement Project and Concrete Repairs
09/20/2019 02:00 PM UTC
1907 002
2019 Pedestrian Facilities Upgrades
07/30/2019 03:00 PM UTC
51 - 60 of 105 Solicitations
1 2 3 4 6 8 9 10 11