General Info

Business Logo

City of Hudson, OH

115 Executive Parkway Suite 400, Hudson, OH 44236
(330) 342-1770

www.hudson.oh.us

Standard Documents

Name * Description
2017 Asphalt Resurfacing Program (132 KB)
Bid Tabulation
2017 Concrete Replacement Program (31.5 KB)
Bid Tabulation
2017 Storm Sewer Lining (26 KB)
Bid Tabulation
2017 Line Striping and Painting Program (62.9 KB)
Bid Tabulation
Atterbury Blvd Storm Structure Repairs (2017) (29.7 KB)
Bid Tabulation
2017 Crack Sealing (126 KB)
Bid Tabulation
2017 Crack Sealing - Re-bid.pdf (187 KB)
Bid Tabulation
Manor Drive Waterline and Storm Sewer Installation (2017) (158 KB)
Bid Tabulation
Repainting of Fire Hydrants on the Akron Water System (13.5 KB)
Bid Tabulation
Manor Drive Waterline and Storm Sewer Installation - REBID (184 KB)
Bid Tabulation
2018 Asphalt Program (73.9 KB)
Bid Tabulation - Awarded to Ronyak Paving
2018 Guardrail Replacement (67.5 KB)
Bid Tabulation - Awarded to Lake Erie Construction
Valley View Culvert Replacement (65.7 KB)
Bid Tabulation - Awarded to CATTS Construction
2018 Concrete Replacement Program (140 KB)
Bid Tabulation - Awarded to Liberta
Salt Storage and Bus Maintenance Garage (198 KB)
Bid Tabulation - Awarded to Cavanaugh Building
2018 Crack Sealing (99.5 KB)
Bid Tabulation - Awarded to Asphalt Fabrics
2018 Line Striping and Painting (69.5 KB)
Bid Tabulation - Awarded to Dura Mark
2018 Storm Sewer Lining (33.9 KB)
Bid Tabulation - Awarded to Insight Pipe
Seasons Road Interchange Signal Pole Procurement (11.4 KB)
Bid Tabulation - Awarded to Path Master
Hudson Drive Waterline (7-10-2018) (67 KB)
Bid Tabulation - All Bids Rejected
Hudson Drive Waterline - Rebid (8-16-2018) (183 KB)
Bid Tabulation - All Bids Rejected
S.R. 303 Butterfly Valve Replacement Project (10-23-2018) (61 KB)
Bid Tabulation - All Bids Rejected
City Administration Building ADA Ramp Installation - Rebid (10-23-2018) (25.2 KB)
Bid Tabulation - All Bids Rejected
2019 Asphalt Resurfacing Program (250 KB)
Bid Tabulation - Awarded to Perrin Asphalt
S.R. 303 Butterfly Valve Replacement Project - REBID (12-11-2018) (61.9 KB)
Bid Tabulation - Awarded to M. Campbell Contracting
N. Main St/Brandywine Drive Storm Sewer (Cemetery) Project (1-8-2019) (64 KB)
Bid Tabulation - Awarded to Lake Co. Landscape
City Admin Renovations & ADA Ramp - 1-29-2019 (79.6 KB)
Bid Tabulation - All Bids Rejected
2019 Concrete Program (2-5-2019) (189 KB)
Bid Tabulation - Awarded to Set-in-Stone Contracting
2019 Line Striping and Painting (3-5-2019) (78.6 KB)
Bid Tabulation - Awarded to Dura Mark
2019 Crack Sealing Program (2-26-2019) (92.4 KB)
Bid Tabulation - Awarded to Asphalt Fabrics
2019 Storm Lining (4-4-2019) (75.6 KB)
Bid Tabulation
City Admin Renovations ADA Ramp (2-19-2019) (127 KB)
Bid Tabulation - Awarded to Augere Construction
32 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
City Administration Building Renovations and ADA Ramp Installation
The proposed work consists of the interior and exterior renovations and upgrades of the existing new City Hall Building located at 1140 Terex Road. Work includes interior demolition; new offices; new community rooms; upgrades to the electrical, lighting, HVAC system, plumbing system, other miscellaneous mechanical systems, fire protection system and security system; installation of a new ADA ramp/lift and upgrades to the site; new carpeting; ceiling system and painting located in the City of Hudson, Ohio.
01/29/2019 03:00 PM UTC
GENERAL LANDSCAPING PROGRAM (Re-Bid 2)
The proposed work consists of professional grounds maintenance activities for City Greens, associated landscape beds and gardens, and restorative landscaping for City public improvements.
01/29/2019 02:00 PM UTC
N. Main St./Brandywine Dr. Storm Sewer (Cemetery) Project
The proposed work consists of the construction of two (2) trench drains, one (1) catch basin, approximately thirty one (31) linear feet of pipe, sidewalk replacement, apron replacement, and concrete curb installation at various locations along N. Main Street (S.R. 91) and Markille-St. Mary’s Cemetery in the City of Hudson, Ohio.
01/08/2019 03:00 PM UTC
BRINE WELL CONSTRUCTION
The proposed work consists of furnishing all necessary labor, supervision, tools, material and equipment to complete each of the following project task items for construction of the Brine Well construction,
12/21/2018 03:00 PM UTC
2019 Asphalt Resurfacing Program
The proposed work consists of the resurfacing and repairs with asphaltic concrete of various streets and city owned properties and asphalt overlay of concrete streets in the City of Hudson, Ohio.
12/18/2018 03:00 PM UTC
S.R. 303 Butterfly Valve Replacement Project (re-bid)
The proposed work consists of the installation of three new 16-inch valves along the 16-inch water main on W. Streetsboro Street between 569 W. Streetsboro Street and 201 Boston Mills Road in the City of Hudson, Ohio.
12/11/2018 03:00 PM UTC
Brine Well Construction Project for City of Hudson
The proposed work consists of furnishing all necessary labor, supervision, tools, material and equipment to complete each of the following project task items for construction of the Brine Well construction,
11/06/2018 02:00 PM UTC
Owen Brown Street Remediation and Demolition, Phase I
The proposed work consists of the removal and abatement of asbestos containing materials (ACM) from structures, demolition of multiple structures including the removal of foundations and pavements, removal and disposal of the demolition debris and below-ground utilities proximate to the structures, limited soils removal, abatement of environmental hazardous materials, abandoning utility services and restoration of grading and stabilization of the areas disturbed by the demolition activity at the Hudson Public Power and Salt Barn located at 95 Owen Brown Street and structures at 100 Owen Brown Street in the City of Hudson, Ohio.
10/30/2018 02:30 PM UTC
General Landscaping (re-bid)
The proposed work consists of professional grounds maintenance activities for City Greens, associated landscape beds and gardens, and restorative landscaping for City public improvements.
10/30/2018 02:00 PM UTC
City Administration Building ADA Ramp Installation (re-bid)
The proposed work consists of the installation of an ADA accessible ramp at the City’s new administration building located at 1140 Terex Road in the City of Hudson, Ohio. This project is funded in part with Community Development Block Grant Funds provided by The County of Summit Community and Economic Development under Summit County Executive Ilene Shapiro.
10/23/2018 02:00 PM UTC
11 - 20 of 73 Solicitations
2 4 5 6 7 8