General Info

Business Logo

City of Hudson, OH

1140 Terex Rd, Hudson, OH 44236-3771
(330) 342-1770

www.hudson.oh.us

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
Division Street Box Culvert Repair
The proposed work includes the removal of a section of failed box culvert lid along Division Street, installing a new reinforced concrete slab in its place, and restoring the pavement in the City of Hudson, Ohio.
11/04/2025 02:30 PM UTC
Lake Forest Sidewalk and Road Realignment and Boston Mills Road Multi-Use Path (re-bid)
The proposed work on Lake Forest Drive includes the installation of approximately 1,800 LF of new five (5) foot wide Class C sidewalk, storm improvements, curbing, pedestrian improvements, driveway improvements, grading and restoration between Boston Mills Road and Essex Circle. The project also includes the realignment of Lake Forest Drive for approximately 230 feet. The proposed work on Boston Mills Road consists of the construction of approximately 3,600 feet of new 10’ wide multi-use path, including the installation of two timber boardwalks and a bridge over Lake Forest, an 8’ stone path through the Park will also be installed. Some of the existing multi-use paths along Boston Mills Road will also be used and upgraded between 115 Executive Parkway and Lake Forest Drive in the City of Hudson, Ohio.
11/04/2025 03:00 PM UTC
Fiber Construction Material Procurement
The purchase will involve fiber and related material (e.g., conduit, fiber, fiber closures, splicing material, demarks, ground closures, aerial attachment equipment, etc.) for use in the construction of the Fiber to the Home project in accordance with the specifications which are on file in the office of the Assistant IT Director. Procured materials are to be stored by Supplier until requested for delivery to the Fiber to the Home project site(s).
11/12/2025 03:00 PM UTC
Fiber to the Home - Year 1 - Area 1
The proposed work includes the installation of new fiber optic infrastructure, including approximately 16,800 lineal feet of 1.5-inch underground HDPE fiber conduit via horizontal directional drilling, 20,900 lineal feet of 2 x 1.5-inch underground HDPE fiber conduit (2 parallel conduit runs pulled together) via horizontal directional drilling, 7,250 lineal feet of new aerial fiber, approximately 54,000 lineal fiber of fiber optic cable (various strand count), the placement of underground fiber vaults and handholes, and the subsequent fiber optic cable installation and testing in the City of Hudson, Ohio. Bidders are required to provide a price for Labor and Material as well as an alternate bid for Labor Only.
11/12/2025 03:30 PM UTC
Demolition and Remediation at 5487 Sullivan Road
The proposed work consists of the demolition of 5487 Sullivan Road that includes a 1,488 square foot house and two 250 square foot sheds. The project also includes the removal of multiple vehicles and various rubbish and debris, including pallets, tires, household appliances, etc. Relevant local, state, and federal requirements regarding the abatement of hazardous materials, includes asbestos, will apply. Work is located in the City of Hudson, Ohio.
11/12/2025 04:00 PM UTC
Hudson Softener Media Replacement (re-bid)
The proposed work consists of the upgrading of Softener #4 at the City of Hudson Water Treatment Plant located at 572 W. Streetsboro Road. Work includes interior and exterior work, including installation of new 6” DeZurik influent and effluent valves for isolation of softener, removal and disposal of existing softener media, cleaning of softener vessel, inspection coordination by 3rd party contractor, and full media replacement, enlarging entry hatch to OSHA standards, structural rehabilitation of tank (pitwelds), disinfection, sandblasting, & epoxy coating of softener vessel. Work may also include partial or full replacement of internal tank components, disinfecting and epoxy coating and additional work related to Softener #3 in the City of Hudson, Ohio.
11/18/2025 02:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
Clock Tower Repair Project
The proposed work consists of necessary repairs and refurbishing to restore movement of the clock tower clock, to be performed by qualified antiquarian horologists, and to be completed in accordance of the Department of the Interior, National Park Service Standards for Restorations, in Hudson, Ohio.
08/02/2022 01:30 PM UTC
Middleton and Stow Road Sidewalk Installation, Phase 1
The proposed work consists of the construction of Phase 1 ONLY of the plans which consists of approximately 2.52 miles of five (5) foot class C concrete sidewalk, storm improvements, ADA curb ramps, lighting upgrades, intersection improvements and signing along Middleton Road between Darrow Road (SR 91) and I-480 and Stow Road between Middleton Road and Chamberlin Blvd. Future phases of sidewalk construction along the west end of Middleton Road (between Valley View Road and Darrow Road) and Stow Road (between Chamberlin Blvd. and I-480) will be completed at a separate time under a separate contract. The project also includes driveway improvements, curb installation, necessary grading and restoration, water quality improvements and pavement repairs in the City of Hudson, Ohio. Bidders are strongly encouraged to visit the site and understand the limits of the project and existing conditions.
07/12/2022 01:30 PM UTC
Middleton Road / Stow Road Signal Improvements
The proposed work consists of the signalization of the intersection of Middleton Road and Stow Road. Signal features are to include infrastructure for future connection into City’s adaptive signal system, preemption, and connection to adjacent existing school zone flashers. Project includes the removal of an existing overhead flashing stop control assembly and stop signs in the City of Hudson, Ohio.
07/12/2022 01:30 PM UTC
S. Main Street Widening-Rebid (Federal #E171463; PID 106445)
The proposed work consists of a road widening for the addition of a center two-way turn lane, resurfacing, 5-foot-wide bike lanes and sidewalks on both the east and west side of SR 91 from Barlow Road to Stoney Hill Drive in the City of Hudson, Ohio.
07/06/2022 02:00 PM UTC
Seasons Road Waterline Extension
The proposed work consists of the installation of approximately 5,585 L.F. of new 12” watermain and its apparatuses along Seasons Road in the City of Hudson, Ohio.
06/21/2022 01:30 PM UTC
Stow and Middleton Road Signal Equipment Pole Procurement
The purchase will consist of poles, pole extensions (for lighting bracket arm/luminaire), mast arms, pedestals (bases, plates), anchor bolts, and all associated hardware all painted black, in accordance with the specifications which are on file in the office of the City Engineer. Equipment is to be stored by Supplier until requested for delivery to the Stow Road/Middleton Road Signal Improvements Project.
06/01/2022 02:00 PM UTC
Preventative Maintenance & Relay Testing of the Prospect Substation
The proposed work consists of preventative maintenance and relay testing at the Prospect Substation in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
05/24/2022 02:00 PM UTC
Veterans Trail Phase 3 (re-bid)
The proposed work consists of the installation of an approximate 6,000-foot gravel path to include fencing, drainage, and a pedestrian bridge from Barlow Road to Veterans Way in the City of Hudson, Ohio.
05/10/2022 01:30 PM UTC
2022 Storm Sewer Lining
The proposed work consists of, but is not limited to, the installation of 12-inch, 15-inch, and 30-inch cured-in-place storm sewer lining, as well as alternate work for the installation of 12-inch, 15-inch, 21-inch, and 30-inch cured-in-place storm sewer lining at various locations in the City of Hudson, Ohio.
05/03/2022 02:00 PM UTC
Stow and Middleton Road Signal Equipment Procurement
The purchase will consist of poles, pole extensions (for lighting bracket arm/luminaire), mast arms, pedestals (bases, plates), anchor bolts, and all associated hardware all painted black, in accordance with the specifications which are on file in the office of the City Engineer. Equipment is to be stored by Supplier until requested for delivery to the Stow Road/Middleton Road Signal Improvements Project.
05/03/2022 01:30 PM UTC
111 - 120 of 278 Solicitations
1 2 8 9 10 12 14 15 16 27 28