General Info

Business Logo

City of Hudson, OH

1140 Terex Rd, Hudson, OH 44236-3771
(330) 342-1770

www.hudson.oh.us

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
SR 91 & Terex Turn Lane Improvements (PID 116929)
The proposed work consists of intersection improvements at SR 91 and Terex Road which includes striping modifications to improve left turn lane offsets at Terex Road as well as extension of the eastbound left turn lane on Terex Road in the City of Hudson, Ohio.
04/08/2026 01:30 PM UTC
2026 Crack Sealing Program
The proposed work consists of the installation of rubberized crack sealer on certain City streets and City owned properties in the City of Hudson, Ohio.
04/15/2026 01:30 PM UTC
2026 Asphalt Patching Program
The proposed work consists of the asphalt patching of various street and city-owned properties in the City of Hudson, Ohio.
04/15/2026 02:00 PM UTC
Barlow Community Center Upper Lake Dam Embankment Repair
The proposed work consists of the repair of earthen depressions within the upper lake dam embankment with over excavation and restoration of existing grades at Barlow Community Center upper lake dam in the City of Hudson, Ohio.
04/16/2026 02:00 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Middleton Road / Stow Road Signal Improvements
The proposed work consists of the signalization of the intersection of Middleton Road and Stow Road. Signal features are to include infrastructure for future connection into City’s adaptive signal system, preemption, and connection to adjacent existing school zone flashers. Project includes the removal of an existing overhead flashing stop control assembly and stop signs in the City of Hudson, Ohio.
07/12/2022 01:30 PM UTC
S. Main Street Widening-Rebid (Federal #E171463; PID 106445)
The proposed work consists of a road widening for the addition of a center two-way turn lane, resurfacing, 5-foot-wide bike lanes and sidewalks on both the east and west side of SR 91 from Barlow Road to Stoney Hill Drive in the City of Hudson, Ohio.
07/06/2022 02:00 PM UTC
Seasons Road Waterline Extension
The proposed work consists of the installation of approximately 5,585 L.F. of new 12” watermain and its apparatuses along Seasons Road in the City of Hudson, Ohio.
06/21/2022 01:30 PM UTC
Stow and Middleton Road Signal Equipment Pole Procurement
The purchase will consist of poles, pole extensions (for lighting bracket arm/luminaire), mast arms, pedestals (bases, plates), anchor bolts, and all associated hardware all painted black, in accordance with the specifications which are on file in the office of the City Engineer. Equipment is to be stored by Supplier until requested for delivery to the Stow Road/Middleton Road Signal Improvements Project.
06/01/2022 02:00 PM UTC
Preventative Maintenance & Relay Testing of the Prospect Substation
The proposed work consists of preventative maintenance and relay testing at the Prospect Substation in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
05/24/2022 02:00 PM UTC
Veterans Trail Phase 3 (re-bid)
The proposed work consists of the installation of an approximate 6,000-foot gravel path to include fencing, drainage, and a pedestrian bridge from Barlow Road to Veterans Way in the City of Hudson, Ohio.
05/10/2022 01:30 PM UTC
2022 Storm Sewer Lining
The proposed work consists of, but is not limited to, the installation of 12-inch, 15-inch, and 30-inch cured-in-place storm sewer lining, as well as alternate work for the installation of 12-inch, 15-inch, 21-inch, and 30-inch cured-in-place storm sewer lining at various locations in the City of Hudson, Ohio.
05/03/2022 02:00 PM UTC
Stow and Middleton Road Signal Equipment Procurement
The purchase will consist of poles, pole extensions (for lighting bracket arm/luminaire), mast arms, pedestals (bases, plates), anchor bolts, and all associated hardware all painted black, in accordance with the specifications which are on file in the office of the City Engineer. Equipment is to be stored by Supplier until requested for delivery to the Stow Road/Middleton Road Signal Improvements Project.
05/03/2022 01:30 PM UTC
Division Street Storm Improvement Project (re-bid)
The proposed work consists of the installation of 370 LF of new 8” PVC SDR 35 storm sewer, 45 LF of new 12" PVC SDR 35 Storm Sewer, manholes, curb inlets, and new 6” storm laterals with cleanouts within the Historic District on Division Street between E. Main Street and College in the City of Hudson, Ohio.
04/27/2022 01:30 PM UTC
S. Main Street Widening (Federal #E171463; PID 106445)
The proposed work consists of a road widening for the addition of a center two-way turn lane, resurfacing, 5-foot-wide bike lanes and sidewalks on both the east and west side of SR 91 from Barlow Road to Stoney Hill Drive in the City of Hudson, Ohio.
04/26/2022 02:00 PM UTC
131 - 140 of 296 Solicitations