General Info

Business Logo

City of Hudson, OH

1140 Terex Rd, Hudson, OH 44236-3771
(330) 342-1770

www.hudson.oh.us

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
2026 Concrete Program (re-bid)
The proposed work consists of sidewalk replacement, sandstone sidewalk removal and replacement, handicap ramp installation, and curb replacement at various locations. Work will also include the removal of an existing concrete slab and the replacement with a new concrete slab with a stamped brick boarder at the City’s Gazebo located on the NE Green near SR 303 and SR 91 in the City of Hudson, Ohio.
05/14/2026 02:00 PM UTC
Franklin Street Watermain Improvements
The proposed work consists of the installation of approximately 625 LF of new 8” watermain installation and its appurtenances along Franklin Street from Aurora Street to the Hudson Board of Education Property in the City of Hudson, Ohio.
05/19/2026 01:00 PM UTC
Gazebo ADA Chair Lift Installation
The proposed work consists of the installation of a new combination stair and ADA lift assembly at the Hudson Bandstand Gazebo, as part of the Gazebo Legacy Project in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
05/26/2026 02:00 PM UTC
Fiber to the Home, Year 2, Area 1
The proposed work includes the installation of new fiber optic infrastructure, including approximately 17,816 lineal feet of 1.5-inch underground HDPE fiber conduit via horizontal directional drilling, 14,156 lineal feet of 2 x 1.5-inch underground HDPE fiber conduit (2 parallel conduit runs pulled together) via horizontal directional drilling, 9,460 lineal feet of new aerial fiber, approximately 53,471 lineal feet of fiber optic cable (various strand count), installation of underground fiber vaults and handholes and the subsequent installation of fiber optic cable and appurtenances, and testing in the City of Hudson, Ohio. Bidders are required to provide a price for Labor Only.
05/27/2026 01:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
Snow and Ice Control Program for Public Properties
The proposed work consists of snow and ice control for City-maintained downtown sidewalks and parking lots, and City-owned public properties areas within the City of Hudson, Ohio. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
09/06/2022 02:30 PM UTC
Clock Tower Repair Project (re-bid)
The proposed work consists of necessary repairs and refurbishing to restore movement of the clock tower clock, to be performed by qualified antiquarian horologists, and to be completed in accordance of the Department of the Interior, National Park Service Standards for Restorations, in Hudson, Ohio.
09/06/2022 02:00 PM UTC
Historic Headstone Preservation Project
The proposed work consists of the structural repair and preservation of approximately 158 cemetery headstones that are in various states of damage and disrepair. The construction to properly make physical repairs, level and reset, clean and apply preservation methods to each headstone will follow industry standards as detailed in the scope of work. Contractor shall furnish all supplies and equipment needed to perform this work. Services are to be completed in accordance with the specifications which are on file in the office of the Public Works Department.
08/18/2022 02:00 PM UTC
Uniforms and Mats Rentals
The proposed work consists of the service of uniforms and mats rentals for City of Hudson employees and at City-owned buildings in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Assistant Public Works Director, Eric Hutchinson.
08/09/2022 02:00 PM UTC
Eastside Substation Transformer Replacement Project - three (3) 7.62KV Distribution Voltage Regulators (re-bid)
The proposed work consists of furnishing the following material and equipment for three (3) 7.62KV Distribution Voltage Regulators for the Eastside Substation Transformer Replacement Project in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of Kevin Powell, Assistant Public Works Director.
08/02/2022 02:00 PM UTC
Clock Tower Repair Project
The proposed work consists of necessary repairs and refurbishing to restore movement of the clock tower clock, to be performed by qualified antiquarian horologists, and to be completed in accordance of the Department of the Interior, National Park Service Standards for Restorations, in Hudson, Ohio.
08/02/2022 01:30 PM UTC
Middleton and Stow Road Sidewalk Installation, Phase 1
The proposed work consists of the construction of Phase 1 ONLY of the plans which consists of approximately 2.52 miles of five (5) foot class C concrete sidewalk, storm improvements, ADA curb ramps, lighting upgrades, intersection improvements and signing along Middleton Road between Darrow Road (SR 91) and I-480 and Stow Road between Middleton Road and Chamberlin Blvd. Future phases of sidewalk construction along the west end of Middleton Road (between Valley View Road and Darrow Road) and Stow Road (between Chamberlin Blvd. and I-480) will be completed at a separate time under a separate contract. The project also includes driveway improvements, curb installation, necessary grading and restoration, water quality improvements and pavement repairs in the City of Hudson, Ohio. Bidders are strongly encouraged to visit the site and understand the limits of the project and existing conditions.
07/12/2022 01:30 PM UTC
Middleton Road / Stow Road Signal Improvements
The proposed work consists of the signalization of the intersection of Middleton Road and Stow Road. Signal features are to include infrastructure for future connection into City’s adaptive signal system, preemption, and connection to adjacent existing school zone flashers. Project includes the removal of an existing overhead flashing stop control assembly and stop signs in the City of Hudson, Ohio.
07/12/2022 01:30 PM UTC
S. Main Street Widening-Rebid (Federal #E171463; PID 106445)
The proposed work consists of a road widening for the addition of a center two-way turn lane, resurfacing, 5-foot-wide bike lanes and sidewalks on both the east and west side of SR 91 from Barlow Road to Stoney Hill Drive in the City of Hudson, Ohio.
07/06/2022 02:00 PM UTC
Seasons Road Waterline Extension
The proposed work consists of the installation of approximately 5,585 L.F. of new 12” watermain and its apparatuses along Seasons Road in the City of Hudson, Ohio.
06/21/2022 01:30 PM UTC
131 - 140 of 303 Solicitations
1 2 10 11 12 14 16 17 18 30 31