Hudson Softener Media Replacement (re-bid)
The proposed work consists of the upgrading of Softener #4 at the City of Hudson Water Treatment Plant located at 572 W. Streetsboro Road. Work includes interior and exterior work, including installation of new 6” DeZurik influent and effluent valves for isolation of softener, removal and disposal of existing softener media, cleaning of softener vessel, inspection coordination by 3rd party contractor, and full media replacement, enlarging entry hatch to OSHA standards, structural rehabilitation of tank (pitwelds), disinfection, sandblasting, & epoxy coating of softener vessel. Work may also include partial or full replacement of internal tank components, disinfecting and epoxy coating and additional work related to Softener #3 in the City of Hudson, Ohio.
11/18/2025 02:30 PM UTC
Ravenna Street Sidewalk Project
The proposed work consists of installation of approximately 4,200 lineal feet of new five (5) foot wide Class C concrete sidewalk, storm improvements, curbing, pedestrian improvements, driveway improvements, grading and restoration along Ravenna Street between S. Hayden Parkway and Stow Road as well as storm water improvements along the Colony Park Trail entrance and near 2095 Ravenna Street in the City of Hudson, Ohio.
12/02/2025 02:30 PM UTC
Hudson Public Works Facility
The proposed work consists of the furnishing of material, equipment, and labor necessary for complete construction of the new Hudson Public Works facility and one Cold Storage structure, along with associated driveways, sidewalks, parking lot, fueling station, perimeter fencing, landscaping and associated earthwork, drainage and utilities located at 5431 Hudson Drive in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the Public Works Department.
12/04/2025 03:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
S.R. 303 Butterfly Valve Replacement Project
The proposed work consists of the installation of three new 16-inch valves along the 16-inch water main on W. Streetsboro Street between 569 W. Streetsboro Street and 201 Boston Mills Road in the City of Hudson, Ohio.
10/23/2018 01:30 PM UTC
Hudson Northern Bulk Water Salt
The proposed work consists of delivery of bulk northern rock salt.
10/17/2018 01:30 PM UTC
Hudson General Landscaping Contract 2019-2020
The proposed work consists of professional grounds maintenance activities for City Greens, associated landscape beds and gardens, and restorative landscaping for City public improvements.
10/02/2018 02:30 PM UTC
City Administration Building ADA Ramp Installation
The proposed work consists of the installation of an ADA accessible ramp at the City’s new administration building located at 1140 Terex Road in the City of Hudson, Ohio. This project is funded in part with Community Development Block Grant Funds provided by The County of Summit Community and Economic Development under Summit County Executive Ilene Shapiro.
10/02/2018 02:00 PM UTC
Uniform and Mat Rental
The proposed work consists of service of uniform and mat rental for Hudson employees and at city buildings listed.
08/28/2018 02:00 PM UTC
Hudson Drive Waterline Improvement Project - REBID
The proposed work consists of two (2) alternate alignments for the installation of a new 12” water main in the City of Hudson, Ohio in accordance with the specifications which are on file in the office of the City Engineer. Alternate 1 includes the installation of approximately 3,135 lineal feet of 12-inch, PVC, CERTALOK-DR14 water main from the Hudson Drive/Hudson Gate Drive intersection, along Hudson Drive and the Summit Metroparks Hike and Bike Trail to an existing Hudson-owned 12-inch water main at the Metro RTA railroad tracks. Alternate 2 includes the installation of approximately 1,144 lineal feet of 12” Class 53 ductile iron water main from the Hudson Drive/Hudson Gate Drive intersection along Hudson Drive to an existing Akron-owned water main.
08/16/2018 01:30 PM UTC
Barlow Community Center Roof Replacement and Repair
The proposed work consists of roof replacement and repairs at the Barlow Community Center.
07/23/2018 02:00 PM UTC
Hudson Drive Waterline Project
The proposed work consists of the installation of approximately 3,135 lineal feet of 12 inch, PVC, CERTALOK-DR14 water main and 1,850 lineal feet of 2-inch HDPE electrical conduit from Hudson Drive/Hudson Gate Drive intersection, along Hudson Drive and the Summit Metroparks Hike and Bike Trail to an existing 12-inch water main at the Metro RTA railroad tracks in the City of Hudson, Ohio.
07/10/2018 01:30 PM UTC
Installation and Construction for the Prospect Substation Improvement Project
The proposed work consists of furnishing all necessary labor, supervision, tools, material and equipment (with exception of major equipment furnished by the City and installed by the contractor) to complete each of the following project task items for construction of the Prospect Substation Improvements.
06/06/2018 01:00 PM UTC
Seasons Road Interchange Signal Equipment Procurement (PID 76721)
The purchase will consist of strain poles, mast arms, anchor bolts, conduit cells, and associated hardware all painted black. Equipment to be stored by Supplier until requested for delivery to the SUM-8-7.81 (PID 76721), a portion of which is located in the City of Hudson, Ohio. The project is Federally Funded.