General Info

Business Logo

Solicitations and notifications are free for this business.

City of Des Moines - Iowa

1200 Locust St, Des Moines, IA 50309-3052
(515) 283-4108


Upcoming Solicitations

Number Deadline
042026011
2027 Pedestrian Crossing Improvements The improvement includes new Pedestrian Hybrid Beacon signals, new pedestrian signals, updated school zone flashing assemblies and speed feedback, Portland Cement Concrete (PCC) curb and gutter, PCC sidewalks, pavement markings, and other incidental items, all in accordance with the contract documents including Plan File No. 684-001/049, located at the following locations: 806 Hoffman Avenue (Madison Elementary), Southridge Mall Entrance and E Army Post Road, South Union Street and Army Post Road, Fleur Drive and Army Post Road, 2309 Euclid Avenue (Polk County River Place), 5016 Park Avenue (Monarch Cement), 5912 University Avenue (St. Theresa Catholic School and Windsor Elementary), 5301 Grand Avenue (Merrill Middle School), 4320 Grand Avenue (St. Augustin Catholic School), 2501 Park Avenue (Brody Middle School), and 1610 SE 6th Street (McKinley Elementary)
11/24/2026 05:00 PM UTC
062022005
ML King Jr Parkway Lane Modifications from I-235 to Hickman Road The improvement includes lane modifications by installing new curb and gutter, milling the existing roadway, resurfacing with Hot-Mix Asphalt (HMA), installing new sidewalk and driveways, pavement markings, traffic signalization and other incidental items, all in accordance with the contract documents including Plan File No. 677-054/171 located on Martin Luther King Jr. Parkway from Atkins Street to Hickman Road, Des Moines, Iowa.
11/24/2026 05:00 PM UTC
072027001
WRA Joint Trunk – Phase 14, Segment 3 This improvement includes construction of sanitary sewer, including all labor, materials, and equipment for excavation and backfill of approximately 12,903 feet of 60-inch and 3,749 feet of 66-inch sanitary sewer in open cut construction; 2,426 feet of 60-inch and 565 feet of 66-inch sanitary sewer in trenchless construction, manholes and special structures, bypass pumping, dewatering, storm sewer replacement, water main replacement, Hot Mix Asphalt (HMA) and Portland Cement Concrete (PCC) replacement, temporary traffic control, erosion control, seeding, flow metering equipment and install with new electrical service, cleanup, and miscellaneous work, all in accordance with the contract documents including Plan File Nos. 683-054/184, located generally along Walnut Creek from I-35/I-80 to 73rd Street in the cities of Clive, West Des Moines, and Windsor Heights in Iowa.
12/01/2026 05:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
042026017
Downtown Skywalk Signage Replacement The improvement includes the installation of overhead and wall-mounted static directional/wayfinding signage throughout the downtown skywalk system, and other areas as directed by the City Engineer, all in accordance with the contract documents, located throughout all skywalks, Des Moines, Iowa.
10/27/2026 04:00 PM UTC
042026022
WRF Building 75 Boilers and Heat Loop Improvements This improvement includes phased replacement of existing boilers, hot water circulation pumps, mechanical equipment, associated piping, controls, electrical, Supervisory Control and Data Acquisition (SCADA) screen updates, and appurtenances, with provisions to maintain operation during construction, all in accordance with the contract documents including Plan File No. 682-013/101, located in Buildings 75, 90, 801, 802, and 803 at the Wastewater Reclamation Facility, 3000 Vandalia Road, Des Moines, Iowa.
09/29/2026 04:00 PM UTC
082026001
2026 Sewer Repair Contract 2 The improvement includes removals, storm sewer installation, sanitary sewer installation, intakes, grading, Portland Cement Concrete (PCC) driveways and sidewalks, Hot-Mix Asphalt (HMA) pavement, modified subbase, subdrain, rip rap, steel sheet piling, guard rail, traffic control, erosion control, restoration, seeding, and other related work, all in accordance with the contract documents including Plan File No. 682-246/298, located at various locations including the following sites: 3700 block of Carpenter Avenue, 3800 block of Franklin Avenue, 3300 block of 62nd Street, 1000 block of County Line Road, Scott Avenue at Fourmile Creek, 2500 block of Wedgewood Road, 3000 block of Shadow Creek Lane, and other locations directed by the City Engineer in Des Moines, Iowa.
09/15/2026 04:00 PM UTC
112026011
Greenwood Park Pond Bridge The improvement includes the construction of a pedestrian bridge at Greenwood Park, spanning approximately 35 feet between existing abutments with an eight (8)-foot-wide concrete deck, reinforced concrete approach slabs, and minor site restoration, all in accordance with the contract documents including Plan File No. 682-162/168, located at 4500 Grand Avenue, Des Moines, Iowa.
08/04/2026 04:00 PM UTC
112026010
Tim Lane Shelter The improvement includes grading, footing and concrete pad construction, shelter installation, erosion control, restoration, seeding, and associated work, all in accordance with the contract documents including Plan File No. 682-169, located along the Karras-Kaul Connector Trail in Des Moines, Iowa.
08/04/2026 04:00 PM UTC
102024007
Skywalk Exterior Improvements Phase 1 This project will repair and restore 12 skywalk exterior finishes, install new water proofing systems, replace window gasketing and seals, thorough cleaning of all skywalk exteriors on Grand Avenue and the immediately adjacent streets, replace existing recessed lighting with new light-emitting diode (LED) lighting, and replace all missing aluminum and steel trim, all in accordance with the contract documents including Plan File No. 679-247/261, on skywalks located along Grand Avenue and immediate adjacent streets, and other locations directed by the City Engineer, Des Moines, Iowa.
07/14/2026 04:00 PM UTC
042026021
WRF Building 73 Generator Improvements The improvement includes two additional engine generators, generator accessories and ventilation in Building 73 including mechanical, electrical, architectural, structural, switchgear, networking and control modifications, all necessary materials, equipment, labor, and miscellaneous associated work and cleanup, all in accordance with the contract documents including Plan File No. 682-102/138, located at the Wastewater Reclamation Facility, 3000 Vandalia Road, Des Moines, Iowa.
06/23/2026 04:00 PM UTC
042026022
WRF Building 75 Boilers and Heat Loop Improvements This improvement includes phased replacement of existing boilers, hot water circulation pumps, mechanical equipment, associated piping, controls, electrical, Supervisory Control and Data Acquisition (SCADA) screen updates, and appurtenances, with provisions to maintain operation during construction, all in accordance with the contract documents including Plan File No. 682-013/101, located in Buildings 75, 90, 801, 802, and 803 at the Wastewater Reclamation Facility, 3000 Vandalia Road, Des Moines, Iowa.
06/23/2026 04:00 PM UTC
042026024
WRA Polk City South Pump Station Rehabilitation This improvement includes rehabilitation of the WRA Polk City South Pump Station and includes lining of the wet well, manhole lining, sewage bypass, temporary traffic control, and surface restoration, all in accordance with the contract documents including Plan File No. 682-001/009, located at or near 1315 S 14th Street, Polk City, Iowa.
06/23/2026 04:00 PM UTC
042026020
WRF Buildings 80-1, 80-2, 80-3 and 62 Electrical Improvements The improvement includes replacement of electrical equipment in buildings 80-1, 80-2, 80-3 and 62 including switchgear, motor control centers, larger panel boards, small lighting transformers, transfers switches, other associated electrical equipment, and all necessary materials, equipment, labor, miscellaneous associated work and cleanup, all in accordance with the contract documents including Plan File No. 681-067/116, located at the Wastewater Reclamation Facility, 3000 Vandalia Road, Des Moines, Iowa.
06/02/2026 04:00 PM UTC
1 - 10 of 13 Solicitations
← Previous 1