General Info

Business Logo

Solicitations and notifications are free for this business.

City of Des Moines - Iowa

1200 Locust St, Des Moines, IA 50309-3052
(515) 283-4108


Upcoming Solicitations

Number Deadline
042026011
2027 Pedestrian Crossing Improvements The improvement includes new Pedestrian Hybrid Beacon signals, new pedestrian signals, updated school zone flashing assemblies and speed feedback, Portland Cement Concrete (PCC) curb and gutter, PCC sidewalks, pavement markings, and other incidental items, all in accordance with the contract documents including Plan File No. 684-001/049, located at the following locations: 806 Hoffman Avenue (Madison Elementary), Southridge Mall Entrance and E Army Post Road, South Union Street and Army Post Road, Fleur Drive and Army Post Road, 2309 Euclid Avenue (Polk County River Place), 5016 Park Avenue (Monarch Cement), 5912 University Avenue (St. Theresa Catholic School and Windsor Elementary), 5301 Grand Avenue (Merrill Middle School), 4320 Grand Avenue (St. Augustin Catholic School), 2501 Park Avenue (Brody Middle School), and 1610 SE 6th Street (McKinley Elementary)
11/24/2026 05:00 PM UTC
062022005
ML King Jr Parkway Lane Modifications from I-235 to Hickman Road The improvement includes lane modifications by installing new curb and gutter, milling the existing roadway, resurfacing with Hot-Mix Asphalt (HMA), installing new sidewalk and driveways, pavement markings, traffic signalization and other incidental items, all in accordance with the contract documents including Plan File No. 677-054/171 located on Martin Luther King Jr. Parkway from Atkins Street to Hickman Road, Des Moines, Iowa.
11/24/2026 05:00 PM UTC
072027001
WRA Joint Trunk – Phase 14, Segment 3 This improvement includes construction of sanitary sewer, including all labor, materials, and equipment for excavation and backfill of approximately 12,903 feet of 60-inch and 3,749 feet of 66-inch sanitary sewer in open cut construction; 2,426 feet of 60-inch and 565 feet of 66-inch sanitary sewer in trenchless construction, manholes and special structures, bypass pumping, dewatering, storm sewer replacement, water main replacement, Hot Mix Asphalt (HMA) and Portland Cement Concrete (PCC) replacement, temporary traffic control, erosion control, seeding, flow metering equipment and install with new electrical service, cleanup, and miscellaneous work, all in accordance with the contract documents including Plan File Nos. 683-054/184, located generally along Walnut Creek from I-35/I-80 to 73rd Street in the cities of Clive, West Des Moines, and Windsor Heights in Iowa.
12/01/2026 05:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
042026019 WRF Phosphorus Recovery Facility
The improvement includes construction of a phosphorus recovery system including a new phosphorus release building and new phosphorus recovery building, filtrate modifications and new filtrate holding tank, a new hauled waste receiving tank, site piping and utility relocations and extensions, site roadway improvements, and all necessary materials, equipment, labor, miscellaneous associated work and cleanup, all in accordance with the contract documents including Plan File No. 680-001/327, located at the Wastewater Reclamation Facility, 3000 Vandalia Road, Des Moines, Iowa.
06/02/2026 04:00 PM UTC
042026018
WRF Building 05 Pipe Inspections and Repairs The improvement includes replacement and rehabilitation of piping in the basement of Building 05 including new couplers, nuts and bolts, and saddle taps. It also includes painting of existing piping and potential of lining the inside of piping and all necessary materials, equipment, labor, miscellaneous associated work and cleanup, all in accordance with the contract documents including Plan File No. 681-001/009, located at the Wastewater Reclamation Facility, 3000 Vandalia Road, Des Moines, Iowa.
05/19/2026 04:00 PM UTC
042026017
Downtown Skywalk Signage Replacement -- The improvement includes the installation of overhead and wall-mounted static directional/wayfinding signage throughout the downtown skywalk system, and other areas as directed by the City Engineer, all in accordance with the contract documents located throughout all skywalks, Des Moines, Iowa.
05/05/2026 04:00 PM UTC
11 - 13 of 13 Solicitations
2 Next →