General Info

Business Logo

State of Oklahoma, Division of Capital Assets Management, Construction & Properties

1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112

See attachments for important information regarding submitting bids. 

Standard Documents

Upcoming Solicitations

Number Deadline
CAP27-0024
Update and/or replace all hardware and software associated with the Supervisory Control and Data Acquisition System (SCADA) for the water treatment plant located at Camp Gruber Training Center.
08/11/2026 07:00 PM UTC
CAP25-0032
CAP25-0032 - Closure of Total Retention Lagoon - Enid, OK - OKDHS
08/13/2026 07:00 PM UTC
CAP27-0001
This work shall consist of concrete burial and miscellaneous debris, trash on the south portion of permit sourcing onsite material to cover. The work will be completed by either pushing concrete downslope to the north of the plateau area and covering with available material and or excavating pits to accommodate concrete and debris and covering with the material onsite.
08/18/2026 07:00 PM UTC
CAP27-0011
HVAC installation including all materials, labor, and equipment necessary
08/18/2026 07:00 PM UTC
CAP27-0031
Serve as the on-call ELECTRICAL contractor for service and equipment failure needs 24/7 -365
08/25/2026 07:00 PM UTC
CAP27-0032
Serve as the on-call HVAC contractor for service and equipment failure needs 24/7-365
08/25/2026 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
CAP24-0176
CAP24-0176 - Griffing Hall Elevator Replacement - Sulphur, OK 73086 - Oklahoma School for the Deaf - OKDRS
03/27/2025 07:00 PM UTC
CAP24-0087
The Project consists of the base bid construction of an addition to the existing Career Center building, renovation of the existing building, associated site and utility work, and new perimeter fencing.
03/20/2025 07:00 PM UTC
CAP25-0254
Pre-Bid meeting changed to 3/4/2025 at 1:00PM. Demo and replace the existing carpet in building C of the CLEET training center at 2401 Egypt Road, Ada, Oklahoma, 74820. The project will consist of both classrooms and corridors. The square footage of the carpet to be replaced will be 20269 SF. The vendor will provide all labor, carpet, adhesive, nosing, transitions, and cove base or other materials required to install and complete the project. After removing the existing carpet, the vendor will be responsible for scraping, cleaning, or preparing the slab for proper adhesion. The agency will be responsible for moving furniture.
03/13/2025 07:00 PM UTC
CAP24-0059R2
The Project consists of refurbishment of the elevator in the Family TREE facility located at 5909 Classen Ct, Oklahoma City, OK 73118. These improvements will provide a code compliant elevator with reduced outages. They will also improve down time for any repairs as new components are readily available for replacement, while existing components are obsolete.
03/13/2025 07:00 PM UTC
CAP25-0153
Replacement of existing electrical distribution equipment such as panelboards, load centers, and transformers with new equipment. Removing existing transformers from the electrical closets and installing new transformers in the basement mechanical room. Addition of mechanical units in the basement to provide required cooling for transformers.
02/27/2025 08:00 PM UTC
CAP25-0150
The Project consists of the upgrade of the existing two (2) passenger elevators, including equipment replacement, cab finish replacement, and miscellaneous code upgrades.
02/20/2025 08:00 PM UTC
CAP25-0151
The Project consists of the upgrade of the existing four (4) passenger elevators and one (1) freight elevator, including equipment replacement, cab finish replacement and miscellaneous code upgrades.
02/20/2025 08:00 PM UTC
CAP25-0148
The Project consists of the replacement of existing curtainwall at the east entrance to the Denver Davison Building with new curtainwall. Project includes the replacement of interior floor tile at the vestibule and a portion of the exterior to allow for waterproofing of the slab edge and improved drainage at the entrance.
02/20/2025 08:00 PM UTC
CAP24-0120
CAP24-0120 - Spiro Mounds Museum Restroom Renovation - Spiro, OK - OHS
02/18/2025 08:00 PM UTC
CAP25-0131
Update old pneumatic controls to new digital climate controls throughout the main complex and connected to the existing I Vu Pro climate control system.
01/30/2025 08:00 PM UTC
101 - 110 of 642 Solicitations
1 2 7 8 9 11 13 14 15 64 65