General Info

Business Logo

State of Oklahoma, Division of Capital Assets Management, Construction & Properties

1915 N Stiles Ave, Oklahoma City, OK 73105-4919
(405) 521-2112

See attachments for important information regarding submitting bids. 

Standard Documents

Upcoming Solicitations

Number Deadline
CAP26-0322
To obtain professional maintenance services for the grounds of OSSM for fiscal year 2027 with 4 option years to renew.
04/30/2026 07:00 PM UTC
CAP25-0176
Structural slab repair & kitchen flooring replacement at Lexington Assessment & Reception Center.
04/30/2026 07:00 PM UTC
CAP26-0337
Preventive and corrective maintenance contract for Tier-3 Data Center critical power maintenance
05/07/2026 07:00 PM UTC
CAP26-0351
Repair by replacement 2 sections of bad/collapsed sewer line. These 2 sections of sewer line are under the slab that has collapsed.
05/07/2026 07:00 PM UTC
CAP26-0341
Repair: Pole Light & Base, Track Lighting, Replace Hangar Door Power Track System-OKCAB31
05/12/2026 07:00 PM UTC
CAP26-0342
West OKC/Mustang detention pond improvements - FACT/OKDE
05/14/2026 07:00 PM UTC
CAP26-0359
An annual military aircraft hangar door maintenance contract for the Army Aviation Support Facilities (AASF). The purpose of this contract will be to establish a predetermined price for annual inspections and preventative maintenance services, and to provide a set labor rate for additional maintenance and repair services that may be required during the contract period.
05/19/2026 07:00 PM UTC
CAP26-0362
CAP26-0362 - Gilbreath Copper Mine Restoration 2 - Olustee, OK - OKCC
05/19/2026 07:00 PM UTC
CAP26-0370
Project Description + any other pertinent details.
05/21/2026 07:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
CAP26-0003
The purpose of this acquisition is to establish an annual contract to provide a complete service-oriented Water Treatment program for the HVAC systems at buildings managed by Office of Management Enterprises (OMES), Capitol Assets and Management (CAM), Department of Office of Facilities Management (OFM).
05/15/2025 07:00 PM UTC
CAP24-0171
Work includes demolition and removal of the Dunbar School located at 1702 W N H Jones Avenue, Lawton OK 73501 to include all materials and equipment required to demolish existing structures, remove loose debris, cut/plug/abandon all existing utilities and grade, drain and sod the disturbed site.
05/15/2025 07:00 PM UTC
CAP25-0057
The Project consists of rehabilitating two existing air handling units with a new direct drive fan wall system, chilled water cooling coil, and filter section. The two perimeter air distribution air handling units will be removed and replaced with new dedicated outside air units. The existing induction boxes will be abandoned in place and new four-pipe fan coil units will be installed above ceilings on each floor to provide perimeter air conditioning. Existing variable air volume boxes will be replaced as an alternate. Work also includes new electrical connections for the all equipment and replacing small sections of ceiling tiles.
05/08/2025 07:00 PM UTC
CAP25-0158
The scope of the project includes the removal various electrical panels and cabinets throughout the building and replacement with new equipment like-for-like. This includes replacement of the main electrical gear and pathways between the OG&E transformer and the main electrical room.
05/06/2025 07:00 PM UTC
CAP25-0146
The Project consists of the improvement of existing drainage conditions and public accessibility for the Oklahoma Governor's Mansion. This consists of demolition of existing storm sewer, pavement, sidewalk and curb and gutter to be replaced with new paving and storm sewer to an existing public storm sewer system. Additionally, new sidewalk/ ADA improvements along public right of way shall be included.
05/06/2025 07:00 PM UTC
CAP25-0370
Removal and disposal, offsite of the following: Building structures as stated above. This includes concrete walks, driveways, paved parking areas, walls, concrete floor, building foundations, and supporting walls to a uniform depth of 12 inches below lowest foundation elevation, roof, doors, windows, steel columns and beams.
05/06/2025 07:00 PM UTC
CAP25-0058
Upgrades to M.C. Connors & Oliver-Hodge buildings including electrical, plumbing, and other systems.
05/01/2025 07:00 PM UTC
CAP25-0059A
The scope of the project includes the removal of five existing air handling units; three located in a penthouses on the roof, two located in the basement, and replacement with new units, like for like.
05/01/2025 07:00 PM UTC
CAP25-0059B
Demolition of existing air handling units, including demolition of penthouses required to move equipment in and out of the space. Installation of new air handling units. Repair of any other demolition taking place as required by the above outlined scope. Temporary air conditioning is to be provided to maintain building operations throughout construction.
05/01/2025 07:00 PM UTC
CAP25-0155
Connors Building fire suppression and electrical upgrade.
04/29/2025 07:00 PM UTC
61 - 70 of 620 Solicitations
1 2 3 4 5 7 9 10 11 61 62