General Info

Business Logo

Bowling Green State University - Campus Construction

1851 N Research Dr, Bowling Green, OH 43403-4401
(419) 372-8411

Bowling Green State University offers a transforming and defining educational experience for its diverse community of nearly 20,000 students. BGSU provides a high-quality education that integrates personal growth, academic excellence and an environment that expands students’ thinking and potential. The University is an international leader with top-caliber programs in the arts, business, education and human development, health and human services, musical arts, science and technology.

There is no shortage of ways for students to unlock their potential at BGSU. With more than 325 student organizations, 40 social fraternities and sororities, 56 intramural sports and 25 sports clubs, there is something for everyone. In addition to clubs and organizations, students can be a part of the fun by visiting the Student Recreation Center, which averages more than 2,000 students per weekday. 

Students are strongly encouraged to take advantage of a co-op, internship or practicum. The Falcon Internship Guarantee provides internships or other experiential learning activities to every incoming first-year student who has completed the Falcon Internship Preparation Program. It is also common for undergraduates to participate in research, an opportunity that is unique to BGSU.

Nearly 9,000 students participate in service-learning and/or community service projects each year at BGSU, giving them one way to stand out from the crowd. 
Leadership opportunities, personalized career planning and interactions with caring faculty are other ways students can be part of something bigger than themselves — building their resumes and their character.

Bowling Green State University focuses on providing a quality student experience that changes lives and careers. Within our supportive campus community, faculty and staff make BGSU a special place for our students and our outstanding alumni.

Evidence of our success is also found in national rankings. BGSU was named a No. 1 public university for student engagement by the Wall Street Journal and Times Higher Education. The Economist ranked BGSU first among public universities in Ohio for boosting former students’ earnings 10 years after college. Business Insider ranks BGSU the most affordable top-quality college in Ohio.

Standard Documents

Name * Description
M160-00_21_13.EB-Instructions_to_Bidders_GC_10.28.19.pdf (232 KB)
OFCC Instructions to Bidders
M140-00_45_13-Bidders_Qualifications.pdf (13.9 KB)
Bidder Qualification Form
M140-00_45_39-EDGE_Affidavit_fillable.pdf (27 KB)
EDGE Affidavit Form
C190-00_52_14-Subcontract_Form.docx (40 KB)
Subcontract Agreement
M160-00_71_00-Contracting_Definitions_GC.pdf (60.4 KB)
Contracting Definitions
M160-00_72_13-General_Conditions_GC.pdf (586 KB)
General Conditions
M140-00_73_43-Wage_Rate_Requirements (003).pdf (99.4 KB)
Prevailing Wage Rate Requirements
M160-00 73 00_13_BGU-2019-FEB-Supplementary_Conditions_GC.pdf (134 KB)
BGSU Supplementary Conditions
Safety and EnvironmentalContractorRequirements.pdf (83.1 KB)
BGSU Safety and Environmental Contractor Requirements
F110-13-EDGE-Participation-GoodFaithEffort.docx (28.2 KB)
EDGE Demonstration of Good Faith (for Option B)
M140-00_43_13--Bid_Security_Form.pdf (115 KB)
Bid Security Form
11 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
8348 Parking Lots 15 & P Reconstruction
Bid# 8348 / Project# 95230049 Parking Lots 15 & P Reconstruction Bowling Green State University Bowling Green, Ohio The planned scope of work for these base bid improvements include pavement milling of existing Parking Lot 15. Existing Lot P will be regraded and repaved to be part of the expanded Lot 15. A new lot will be constructed to the North of Lot 15 which will be the new Lot P. Anticipated commencement of work is 05/08/2023 with substantial completion of work by 08/11/2023. PREBID PRESENTATION: March 21, 2023 @ 1:00 pm Method: Zoom (www.zoom.us/join) Meeting ID: 813 467 3004 Passcode: 195462 WALKTHROUGH: March 21, 2023 @ 3:00 pm Location: BGSU campus, Tucker Center 225 Troup St. North Elevation, Bowling Green, OH 43403 *** Addendum# 1 - Added 3.30,23 ***
04/06/2023 02:00 PM UTC
8359 Jerome Library Tunnel Rennovation
Bid# 8359 Project# 95230027 The planned scope of work includes tunnel top replacement and wall repairs at the existing Jerome Library Tunnel. Efforts also include asbestos abatement, utility insulation replacement, utility support retrofits, electric/lighting upgrades, insulation/jacketing, landscape restoration and pavement (asphalt and concrete) replacements. The existing loading dock stairs will be replaced and a mechanical lift will be installed at the site. PREBID PRESENTATION: February 27, 2023 @ 10:00 am Method: Zoom (www.zoom.us/join) Meeting ID: 813 467 3004 Passcode: 195462 WALKTHROUGH: February 27, 2023 @ 2:00 pm Location: BGSU campus SouthEast Corner of Lot N, Bowling Green, OH 43403 ** ADDENDUM #1 added 3/2/2023 ** ** ADDENDUM #2 added 3/6/2023 **
03/10/2023 06:00 PM UTC
8341 MMAC Kobacker Hall AV Upgrades
Bid# 8341 / Project# 95230013-C MMAC Kobacker Hall AV Upgrades, Kobacker Hall in Moore Musical Arts Center, Bowling Green State University, Bowling Green, Ohio PREBID PRESENTATION: February 21, 2023 @ 10:00 am Method: Zoom (www.zoom.us/join) Meeting ID: 813 467 3004 Passcode: 195462 WALKTHROUGH: February 21, 2023 @ 3:00pm Meeting Location: Lobby of BGSU Main Entrance of Moore Musical Arts Center, Bowling Green, OH 43403 *** Addendum No. 1.- added 2/23/2023 *** *** Addendum No. 2.- added 2/24/2023 *** *** Addendum No. 3.- added 3/1/2023 ***
03/09/2023 03:00 PM UTC
8342 Offenhauer 11th Floor Renovation
Bid# 8342 / Project# 95230034 Offenhauer West Eleventh Floor Renovation located at Bowling Green State University – Converting the 11th floor from conference and office space to resident dorm room and facilities space PREBID MEETING: February 17, 2023 @ 8:30 - 9:30am Method: Zoom (https://zoom.us/join) Meeting ID: 813 467 3004 Passcode: 195462 WALKTHROUGH: February 17, 2023 @ 10:00 - 11:00am Meeting Location: BGSU Offenhauer West Tower 522 Thurstin St, Bowling Green, OH 43403 ** ADDENDUM #1 added 2/21/2023 ** ** ADDENDUM #2 added 2/22/2023 ** ** ADDENDUM #3 added 2/27/2023 **
03/02/2023 07:00 PM UTC
8300 Shatzel and Eppler Elevator Upgrade
Shatzel and Eppler Elevator Modernization, Bowling Green, OH Make sure to indicate date you received each Addenda in section below ** ADDENDUM #3 - 1.13.2023** Among updates include edited Unit Price section and answer to questions ** ADDENDUM #2 - 1.5.2023** Among updates include updated drawings and requirement of Unit Prices Drawings from incorrect bid removed - 1.5.2023 ** ADDENDUM #1 - 12.20.2022 ** Updated HVAC specs provided. PREBID PRESENTATION: January 5, 2023 @ 9:00 - 10:00am Method: Zoom (https://zoom.us/join) Meeting ID: 813 467 3004 Passcode: 195462 WALKTHROUGH: January 5, 2023 @ 1:00 - 2:00pm Meeting Location: BGSU Main Campus Meet at Shatzel building 2nd Floor, Elevator Lobby
01/18/2023 04:00 PM UTC
8287 Lot L Parking Lot Resurfacing
The planned scope of work for these base bid improvements include full depth reclamation of the existing Lot L parking lot, re-grading the lot per plan to promote positive drainage and repaving. Existing lot will be regraded to sheet flow in all four directions and proposed swales will be added on the east and south side to pick up this drainage. Anticipated commencement of work is 05/01/2023 and anticipated completion of work is 07/07/2023. ** ADDENDUM #3 - 1.10.23 ** Summary and documents are attached in Procurement Documents section ** ADDENDUM #2 - 1.5.23 ** Summary and documents are attached in Procurement Documents section ** ADDENDUM #1 - 12.22.22 ** Drawings and specifications have been updated. and bid deadline has been moved to January 17, 2023 @ 2:00pm ** Please acknowledge receipt of Addendum in section below: CONTRACT TIME AND ADDENDA PREBID PRESENTATION: January 4, 2023 @ 10:00 - 11:00am Method: Zoom (https://zoom.us/join) Meeting ID: 813 467 3004 Passcode: 195462 WALKTHROUGH: January 4, 2023 @ 2:00 - 3:00pm Meeting Location: BGSU Main Campus Lot L, Stadium Drive, BGSU, Bowling Green, Ohio
01/17/2023 07:00 PM UTC
REBID 8222 Olscamp Hall and Central Hall 2023 Classroom AV Upgrades
Olscamp Hall and Central Hall– 2023 Classroom Audio Visual Upgrades Bowling Green State University, Bowling Green, OH No Pre-Bid Meeting or Walk-Through will occur as they were already performed with the original BID#8222
12/23/2022 04:00 PM UTC
8222 Olscamp Hall and Central Hall 2023 Classroom AV Upgrades
Olscamp Hall and Central Hall– 2023 Classroom Audio Visual Upgrades, BGSU, Bowling Green, OH *** ADDENDUM 1 ISSUED 11/22/2022 *** PREBID Meeting: Nov 10, 2022, 8:30am - 9:30am Method: Zoom (https://zoom.us/join) Meeting ID: 813 467 3004 Passcode: 195462 WALKTHROUGH: Nov 11, 2022 @ 9:00am - 11:00am Meeting Location: Olscamp Hall Room 111 Bowling Green State University, Bowling Green, OH 43403
11/30/2022 07:00 PM UTC
8178 Door Replacements for BGSU Firelands Campus
Replacement of various entries in four buildings on Firelands Campus. ** ADDENDUM 1 ISSUED 9/14/2022 ** Modification of specs and drawings dated 08/28/2022. Receipt of this addendum shall be acknowledged on the bid form PREBID Meeting: Sept 8, 2022 @ 8:30 - 9:30am Method: Zoom (zoom.us) Meeting ID: 813 467 3004 Passcode: 195462 WALKTHROUGH: Sept 8, 2022 @ 2:00 - 3:00pm Meeting Location: BGSU Firelands Campus 1 University Dr, Huron, OH Meet at Foundation Hall main entry lobby
09/22/2022 02:00 PM UTC
7991 Eppler 2022 Classroom AV Upgrades
Eppler Complex -- 2022 Classroom Audio Visual Upgrades, BGSU, Bowling Green, OH. Addendum 1 - Issued 4/5/22
04/18/2022 06:00 PM UTC
21 - 30 of 53 Solicitations
1 3 5 6