General Info

Business Logo

Bowling Green State University - Campus Construction

1851 N Research Dr, Bowling Green, OH 43403-4401
(419) 372-8411

Bowling Green State University offers a transforming and defining educational experience for its diverse community of nearly 20,000 students. BGSU provides a high-quality education that integrates personal growth, academic excellence and an environment that expands students’ thinking and potential. The University is an international leader with top-caliber programs in the arts, business, education and human development, health and human services, musical arts, science and technology.

There is no shortage of ways for students to unlock their potential at BGSU. With more than 325 student organizations, 40 social fraternities and sororities, 56 intramural sports and 25 sports clubs, there is something for everyone. In addition to clubs and organizations, students can be a part of the fun by visiting the Student Recreation Center, which averages more than 2,000 students per weekday. 

Students are strongly encouraged to take advantage of a co-op, internship or practicum. The Falcon Internship Guarantee provides internships or other experiential learning activities to every incoming first-year student who has completed the Falcon Internship Preparation Program. It is also common for undergraduates to participate in research, an opportunity that is unique to BGSU.

Nearly 9,000 students participate in service-learning and/or community service projects each year at BGSU, giving them one way to stand out from the crowd. 
Leadership opportunities, personalized career planning and interactions with caring faculty are other ways students can be part of something bigger than themselves — building their resumes and their character.

Bowling Green State University focuses on providing a quality student experience that changes lives and careers. Within our supportive campus community, faculty and staff make BGSU a special place for our students and our outstanding alumni.

Evidence of our success is also found in national rankings. BGSU was named a No. 1 public university for student engagement by the Wall Street Journal and Times Higher Education. The Economist ranked BGSU first among public universities in Ohio for boosting former students’ earnings 10 years after college. Business Insider ranks BGSU the most affordable top-quality college in Ohio.

Standard Documents

Name * Description
M160-00_21_13.EB-Instructions_to_Bidders_GC_10.28.19.pdf (232 KB)
OFCC Instructions to Bidders
M140-00_45_13-Bidders_Qualifications.pdf (13.9 KB)
Bidder Qualification Form
M140-00_45_39-EDGE_Affidavit_fillable.pdf (27 KB)
EDGE Affidavit Form
C190-00_52_14-Subcontract_Form.docx (40 KB)
Subcontract Agreement
M160-00_71_00-Contracting_Definitions_GC.pdf (60.4 KB)
Contracting Definitions
M160-00_72_13-General_Conditions_GC.pdf (586 KB)
General Conditions
M140-00_73_43-Wage_Rate_Requirements (003).pdf (99.4 KB)
Prevailing Wage Rate Requirements
M160-00 73 00_13_BGU-2019-FEB-Supplementary_Conditions_GC.pdf (134 KB)
BGSU Supplementary Conditions
Safety and EnvironmentalContractorRequirements.pdf (83.1 KB)
BGSU Safety and Environmental Contractor Requirements
F110-13-EDGE-Participation-GoodFaithEffort.docx (28.2 KB)
EDGE Demonstration of Good Faith (for Option B)
M140-00_43_13--Bid_Security_Form.pdf (115 KB)
Bid Security Form
11 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
7594 Centennial Paint and Carpet
Centennial Hall Paint and Carpet The purpose of this project is to refresh carpet and paint in the public areas and corridors in Centennial Hall. This also includes select bulkheads and ceilings on the first floor. Centennial Hall is a 5-story residence hall completed in 2010. ADDENDUM 1 - PUBLISHED 2/8/2021! ADDENDUM 2- PUBLISHED 2/9/2021!
02/15/2021 02:30 PM UTC
7545 BTSU Ballroom 202 Renovations
7545 BTSU Ballroom 202 Renovations Renovation of spaces include updating the spaces appearances, acoustics, lighting, and AV systems. Pre-Bid Conference Call on January 25, 2021 at 3:30 p.m. - 4:30 p.m. via Webex. Webex address is https://bgsu.webex.com/meet/krhine. Walkthrough: A walkthrough of the project site is scheduled for January 26, 2021, 3:30pm - 5:00pm. Meet at Lot 7, Bowen-Thompson Student Union parking lot. ADDENDUM #1 - ISSUED 1/28/2021! ADDENDUM #2 - ISSUED 2/2/2021!
02/08/2021 08:00 PM UTC
7535
AV BAA to Nursing Bid: Audiovisual systems for second and third floors of the Business Administration Building Annex (BAA) nursing simulation lab spaces, conference and skill labs. Pre-bid Meeting: 09 December 2020, 11:00 am - 12:00 pm via Webex via: https://bgsu.webex.com/meet/krhine Walkthrough: 09 December 2020, 3:00pm. Meeting spot is the southeast entrance to the Business Administration Annex (BAA Building). *ADDENDUM #1 POSTED 12/15/2020!
12/23/2020 06:00 PM UTC
REBID 7475
REBID 7475 Kalwall Replacement – BGSU Olscamp Hall FDHS Skylight Weatherseal – Perry Field House *No Prebid/Walkthrough *Questions should be sent to: Todd Gerdeman <Todd@technicondesigngroup.com> by: 12/1/2020 at 1:30pm
12/07/2020 06:30 PM UTC
7476
CCP2 Ridge Street Tunnel Repair ADDENDUM 1 - ISSUED 10/21/2020! ADDENDUM 2 - ISSUED 10/22/2020! ADDENDUM 3 - ISSUED 10/23/2020! ADDENDUM 4 - ISSUED 10/26/2020!! ADDENDUM 5 - ISSUED 10/28/2020! ADDENDUM 6 - ISSUED 10/30/2020! ADDENDUM 7 - ISSUED 11/2/2020! The planned scope of work for these base bid 2021 Infrastructure Improvements include the Ridge Street tunnel top replacement and wall repairs, sealing, internal repairs/replacements to piping supports and interior tunnel lighting. In addition to the connection of the chilled water systems to chilled water extensions in Ridge Street including re-paving and associated repairs. As part of the alternate scopes of work, improvements may include any one and/or a combination of the following: Fire Alarm Upgrades to CCP1, Condenser Water Pump Mods to CCP1, Chilled Water Extension to Student Union Repave Service Area at Eppler/Hayes , Adding pump condensate/high pressure condensate insulation/jacketing and/or Sealing of Tunnel Tops.
11/06/2020 04:00 PM UTC
7475
Kalwall Replacement – BGSU Olscamp Hall FDHS Skylight Weatherseal – Perry Field House ADDENDUM 1 - 10/22/2020 ADDENDUM 2 - 10/28/2020 **PREBID RESCHEDULED - Oct. 27th, 2020 @ 1:30pm
11/02/2020 06:30 PM UTC
7327
BAA-Nursing Moves **ADDENDUM #3 - POSTED 7/29/2020** **ADDENDUM #2 - POSTED 7/28/2020** **ADDENDUM #1 - POSTED 7/20/2020** Renovations to second and third floors of the Business Administration Building Annex (BAA) to convert existing classrooms and offices into nursing simulation lab spaces and skill labs. Additional limited renovations on first floor to combine two existing classrooms for a computer classroom. Pre-Bid Meeting on 14 July, 2020, at 3:30 p.m. until approximately 4:30 p.m., via conference call: dial-in number is 1-877-820-7831 and participant passcode: 270613#. For document visibility Webex will be used: https://bgsu.webex.com/meet/krhine. A walkthrough will be held on 15 July 2020, 1:00pm. Meeting spot is the southeast entrance to the Business Administration Annex (BAA Building).
08/03/2020 05:00 PM UTC
7310
BGSU Campus Lighting Upgrades - Phase 4 *ADDENDUM 3 POSTED 7/15/2020!!* *ADDENDUM 2 POSTED 7/9/2020!!* *ADDENDUM 1 POSTED 7/2/2020!!* Pre-Bid Meeting to be held via conference call June 22, 2020 at 2:00pm. Conference Call Information: The dial in number is 1-877-820-7831 and the participant passcode: 270613#. Site walkthrough will be held June 23, 2020 at 3:00pm. See Solicitation for details.
07/23/2020 05:00 PM UTC
REBID 7296
REBID OF: OLSC Roof – Kalwall Replacement ROOF REPLACEMENT USING 0.060" EPDM OVER 4" OF INSULATION OVER EXISTING ROOF DECK. REMOVAL AND RESET OF ALL EXISTING STONE COPING. TOTAL ESTIMATED AREA OF EPDM ROOF: 14,575 S.F. (THIS DOES NOT INCLUDE ANY PARAPET WALL SURFACES) TOTAL ESTIMATED LINEAL FOOTAGE OF STONE CAP: 1,460 L.F.
07/01/2020 02:00 PM UTC
7296
OLSC Roof – Kalwall Replacement ROOF REPLACEMENT USING 0.060" EPDM OVER 4" OF INSULATION OVER EXISTING ROOF DECK. REMOVAL AND RESET OF ALL EXISTING STONE COPING. TOTAL ESTIMATED AREA OF EPDM ROOF: 14,575 S.F. (THIS DOES NOT INCLUDE ANY PARAPET WALL SURFACES) TOTAL ESTIMATED LINEAL FOOTAGE OF STONE CAP: 1,460 L.F.
06/22/2020 02:00 PM UTC
41 - 50 of 53 Solicitations
1 2 3 5