23-0047
RE-BID:
Village of Fowlerville - Fowlerville Park: Contract 1 - Construction of a new recreation pavilion
| 05/13/2025 03:00 PM UTC |
23-0047
RE-BID:
Village of Fowlerville - Fowlerville Park: Contract 2 - Removal and replacement of the existing bituminous parking lot, construction of pickleball courts, sidewalk, curb and gutter, a water service, sanitary pipe, and storm pipe and detention ponds.
| 05/13/2025 03:00 PM UTC |
23-0047
RE-BID
Village of Fowlerville - Fowlerville Park: Contract 3 - Installation of Playground Equipment, Site Furnishing, Splash Pad, Workout/Fitness Equipment, and Fitcore Extreme.
| 05/13/2025 03:00 PM UTC |
Number | Deadline |
---|---|
23-0047
Village of Fowlerville - The Project includes the following Work:
Removal and replacement of the existing bituminous parking lot, construction of a new pavilion, sidewalk, curb and gutter, a water service, sanitary pipe, and storm pipe and
detention ponds.
An OPTIONAL pre-bid conference for the project will be held on April 16, 2025 at 10:00am at the Fowlerville Village Offices located at 213 S Grand Ave Fowlerville, MI 48836.
| 04/22/2025 03:00 PM UTC |
24-0013
City of Grand Ledge - The Project includes the following Work:
Approximately 0.237 miles of road reconstruction including +/-735 tons of HMA pavement, +/-1200' concrete curb and gutter, +/-1100 sft sidewalk & ramps, +/-316' storm sewer, and miscellaneous pavement markings.
| 07/31/2024 05:00 PM UTC |
23-0027
Village of Pinckney - Work consists of drilling a 200 foot deep test well including a 12" steel casing to a depth of 75 feet, testing, and cleaning.
Owner anticipates that the Project’s total bid price will be approximately $57,690.00. The Project has an expected duration of 90 days.
| 06/24/2024 03:00 PM UTC |
20-0036
City of Jonesville - West Street and Adrian Street Improvements including approximately 0.617 miles of road reconstruction including +/-1800 tons of HMA pavement, +/-4500' concrete curb and gutter, +/- 8300 sft sidewalk and ramps, earth excavation, +/-1,500' storm sewer, +/-1150' water main and pavement markings.
The Project has an expected duration of 115 days.
| 05/21/2024 02:00 PM UTC |
24-0022
Village of Fowlerville - Road reconstruction including +/-5,000 tons of HMA pavement, +/- 5,500' of concrete curb and gutter, +/- 35,000 Sft of sidewalk, earth excavation, embankment, +/- 3,400' of storm sewer, +/- 2,500' of sanitary sewer, +/- 700' of water main, and pavement markings. Breakdown of quantities for each location/category located in the Schedule of Items.
Owner anticipates that the Project’s total bid price will be approximately $4,533,000. The Project has an expected duration of 208 days.
| 04/04/2024 03:00 PM UTC |
21-0074
Village of Pigeon - Berne Street Reconstruction including new HMA pavement, +/-2,900' of concrete curb and gutter, +/-3,000 sqft of sidewalk, +/-120 Syd of concrete driveway, +/-1,400' of storm sewer, +/-600' of 8" water main, and pavement markings.
Owner anticipates that the Project’s total bid price will be approximately $1,030,000. The Project has an expected duration of 120 days.
| 04/03/2024 03:00 PM UTC |
18-0120-A - Crystal Lake Shoreline Improvements
Township of Crystal - Crystal Lake Shoreline Improvements including approximately 10,400 cyd of earth excavation, 2,500 sft of modular block wall, 9,400 sft concrete sidewalk, 162 feet of safety railing, electrical and lighting system, irrigation, 600 cyd of imported beach sand, site furnishings and cleanup and restoration.
Owner anticipates that the Project’s total bid price will be approximately $723,925.00. The Project has an expected duration of 217 days.
| 11/21/2023 10:00 PM UTC |
21-0084
Village of Pinckney - Approximately 0.53 mi of road reconstruction including 1,400 tons HMA, 4,650 ft of concrete curb and gutter, 20,000 sft sidewalk, 23 sta of machine grading, 3,300 ft of 12-30 in storm sewer, 172 ft sanitary sewer, 3,350 ft 8-12 in water main.
Owner anticipates that the Project’s total bid price will be approximately $2,300,000. The Project has an expected duration of 240 days.
| 03/21/2023 03:00 PM UTC |
22-0009
Township of Fairhaven, Michigan - Lagoon Outlet Control Structure Replacement: Replacement of existing cast iron sluice gates with new stainless steel sluice gates and appurtenances including all materials, equipment, and labor necessary to complete the project.
| 05/31/2022 06:00 PM UTC |
22-0009
Township of Fairhaven, Michigan - Lagoon Outlet Control Structure Replacement: Replacement of existing cast iron sluice gates with new stainless steel sluice gates and appurtenances including all materials, equipment, and labor necessary to complete the project.
| 05/31/2022 02:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.