General Info

Business Logo

Wolverine Engineers & Surveyors, Inc.

312 North St, Mason, MI 48854-1169
(517) 676-9200


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
17-0040-B
Township of Nottawa - Coldwater Lake Low Pressure Sewer, Pump Station, and Force Main - Contract 1 and 2 - The project includes the following Work: Contract 1 includes: approximately 66,500 lft of 1.5 inch to 6 inch pressure sewer, 285 simplex grinder pump stations, 2 duplex grinder stations, and 1 special duplex grinder station, 33 flushing connections, 21 gate valves, 7 air release valves, misc storm sewer repair, HMA paving, and cleanup and restoration. Contract 2 includes: a new 30hp duplex self-priming pump station and enclosure with associated electrical and SCADA appurtenances, site piping, magnetic flow meter, gravel drive, approximately 8,600 lft of 8 inch force main including: 2 cleanout/air release assemblies, 4 cleanout assemblies, Beal City Pump Station site improvements including a new emergency storage basin and associated piping, and cleanup and restoration.
07/09/2025 03:00 PM UTC
23-0047
RE-BID Village of Fowlerville - Fowlerville Park: Contract 3 - Installation of Playground Equipment, Site Furnishing, Splash Pad, Workout/Fitness Equipment, and Fitcore Extreme.
05/13/2025 03:00 PM UTC
23-0047
RE-BID: Village of Fowlerville - Fowlerville Park: Contract 2 - Removal and replacement of the existing bituminous parking lot, construction of pickleball courts, sidewalk, curb and gutter, a water service, sanitary pipe, and storm pipe and detention ponds.
05/13/2025 03:00 PM UTC
23-0047
RE-BID: Village of Fowlerville - Fowlerville Park: Contract 1 - Construction of a new recreation pavilion
05/13/2025 03:00 PM UTC
23-0047
Village of Fowlerville - The Project includes the following Work: Removal and replacement of the existing bituminous parking lot, construction of a new pavilion, sidewalk, curb and gutter, a water service, sanitary pipe, and storm pipe and detention ponds. An OPTIONAL pre-bid conference for the project will be held on April 16, 2025 at 10:00am at the Fowlerville Village Offices located at 213 S Grand Ave Fowlerville, MI 48836.
04/22/2025 03:00 PM UTC
24-0013
City of Grand Ledge - The Project includes the following Work: Approximately 0.237 miles of road reconstruction including +/-735 tons of HMA pavement, +/-1200' concrete curb and gutter, +/-1100 sft sidewalk & ramps, +/-316' storm sewer, and miscellaneous pavement markings.
07/31/2024 05:00 PM UTC
23-0027
Village of Pinckney - Work consists of drilling a 200 foot deep test well including a 12" steel casing to a depth of 75 feet, testing, and cleaning. Owner anticipates that the Project’s total bid price will be approximately $57,690.00. The Project has an expected duration of 90 days.
06/24/2024 03:00 PM UTC
20-0036
City of Jonesville - West Street and Adrian Street Improvements including approximately 0.617 miles of road reconstruction including +/-1800 tons of HMA pavement, +/-4500' concrete curb and gutter, +/- 8300 sft sidewalk and ramps, earth excavation, +/-1,500' storm sewer, +/-1150' water main and pavement markings. The Project has an expected duration of 115 days.
05/21/2024 02:00 PM UTC
24-0022
Village of Fowlerville - Road reconstruction including +/-5,000 tons of HMA pavement, +/- 5,500' of concrete curb and gutter, +/- 35,000 Sft of sidewalk, earth excavation, embankment, +/- 3,400' of storm sewer, +/- 2,500' of sanitary sewer, +/- 700' of water main, and pavement markings. Breakdown of quantities for each location/category located in the Schedule of Items. Owner anticipates that the Project’s total bid price will be approximately $4,533,000. The Project has an expected duration of 208 days.
04/04/2024 03:00 PM UTC
21-0074
Village of Pigeon - Berne Street Reconstruction including new HMA pavement, +/-2,900' of concrete curb and gutter, +/-3,000 sqft of sidewalk, +/-120 Syd of concrete driveway, +/-1,400' of storm sewer, +/-600' of 8" water main, and pavement markings. Owner anticipates that the Project’s total bid price will be approximately $1,030,000. The Project has an expected duration of 120 days.
04/03/2024 03:00 PM UTC
1 - 10 of 21 Solicitations
← Previous 1 3