General Info

Business Logo

The University of Toledo, OH

2801 W. Bancroft St. 2925 East Rocket Drive, Toledo, OH 43606
(419) 530-1427

The University of Toledo is one of just 27 public research universities in the country to offer such a comprehensive menu of academic options - 230+ undergraduate and graduate degree programs across the arts, business, education, engineering, law, medicine, natural sciences, nursing, and pharmacy. At UToledo, it's all about the possibilities and opportunities. No limitations.

At The University of Toledo, we are driven to think smarter, tackle challenges and improve lives. We are renowned for research in the areas of astronomy and astrophysics; solar energy, water quality and sustainable technologies; and cell architecture and dynamics. Other areas of unique distinction include human trafficking, disability studies, hypertension and precision medicine.

UToledo has 20 academic programs - including undergraduate, graduate, online, and professional programs that are nationally ranked by U.S. News & World Report.

UToledo is ranked among the top 100 public universities in the latest Wall Street Journal/Times Higher Education Rankings.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0053-25-399
Student Recreation Center (RC) Roof Replacement
07/01/2025 06:00 PM UTC
5004-25-1932
UMC Fan Roof Replacement
07/08/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
0018-22-266
Carter Hall Demolition Project includes abatement of hazardous material as well as demolition of both Carter Hall East and Carter Hall West. The two dormitory buildings were originally built in 1964/1965 and total approximately 125,673gsf. Scope includes complete building and foundation demo and removal. Existing utilities will be cut and capped outside the building footprint. The site will be filled and seeded as the area will become green space after the demolition and available for future development.
09/14/2021 06:00 PM UTC
1130-21-240
Underground Utility Infrastructure Improvements Project includes the Main Campus underground utility infrastructure which is 40-50 years old in some locations and often compromised due to failed sections of the piping system. This project will replace 1970’s era underground steam supply and condensate return lines, along with chilled water supply and return lines on Main Campus.
09/14/2021 06:00 PM UTC
1030-22-263
Parking Lot 13 Expansion project will include the creation of surface parking to replace the former west parking ramp. It will include improved aesthetics, landscaping upgrades and the resurfacing of the existing lot 13 paving. The new and existing lots will be combined and reconfigured to improve vehicular traffic and parking on the west side of campus.
09/07/2021 06:00 PM UTC
REBID 1130-21-236
Elevator Safety Repairs and Replacement Project (Various campus buildings) Upgrade, replace, and modernize elevator systems including upgrading and replacing elevator power systems, controller equipment and systems, elevator cars and machine room upgrades, and bringing existing building elevators up to current code requirements.
08/31/2021 06:00 PM UTC
New 0094-21-231
Ottawa East 2021 Dining Expansion project includes expanding the existing seating capacity within the overall dining space, as well as modifications to the existing dining spaces and associated cooking/serving stations.
08/24/2021 06:00 PM UTC
1130-21-236
Elevator Safety Repairs and Replacement Project (Various campus buildings) Upgrade, replace, and modernize elevator systems including upgrading and replacing elevator power systems, controller equipment and systems, elevator cars and machine room upgrades, and bringing existing building elevators up to current code requirements.
08/10/2021 06:00 PM UTC
1130-21-235
Building Automation System Upgrades project will involve replacement of old electronic and pneumatic panels that control heating and cooling. The new controls will automate building schedules and assist in reducing energy use/cost.
07/27/2021 06:00 PM UTC
REBID 5004-21-1876
The MRI Replacement project includes renovations to the MRI suite to coincide with the replacement of the 3T MRI equipment.
07/20/2021 06:00 PM UTC
1130-21-232
Building Envelope/Waterproofing project includes roof replacements and associated work at campus locations: Health Education Building, Bowman-Oddy Labs, Center for Sculptural Studies, Ritter Planetarium. The project also includes window replacement and associated work, and exterior facade cleaning at Ritter Planetarium.
07/20/2021 06:00 PM UTC
1130-21-233
Mechanical System Improvements project will involve replacement of air handlers, exhaust fans, and unitary equipment. Replacements will reduce maintenance, improve indoor air quality, and minimize utility use. Energy reduction and efficiencies will be included. The project will involve several buildings on Main Campus and Health Science Campus.
07/13/2021 06:00 PM UTC
51 - 60 of 70 Solicitations
1 2 3 4 6